ML20117N510

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1996 for Crystal River Unit 3
ML20117N510
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/1996
From: Boldt G, Dao T
FLORIDA POWER & LIGHT CO., FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F096-03, 3F96-3, NUDOCS 9609190244
Download: ML20117N510 (5)


Text

_

  • a.'

,9 Florida Power CORPORATION 0 70' September 12, 1996 3F096-03 U. S. Nuclear Regulatory Commission i

Attn:

Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3 August 1996 Monthly Operating Report. This report is submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, G. L.

Idt Vice President Nuclear Production GLB/ff Attachment xc: Regional Administrator, Region II l

Senior Resident Inspector NRR Project Manager i

9609190244 5'60831 PDR ADOCK 05000302 R

PDR CRYSTAL ANER ENERGY COMPLEX: 15760 W Power uno St. Ciystal River, Florida 344286708 e (352) 796 4486 A Florida Pmgress Cortpany L

~

OPERATING DATA REPORT i

DOCKET NO.

50-302 UNIT FLCRP-3 DATE SEPT 3,1996h COMPLETED BY T V Dao TELEPHONE (352) 795-6486 OPERATING STATUS 1.

UNIT NAME:......

CRYSTAL RIVER UNIT 3

2. REPORTING PERIOD:...

AUGUST

' 3. LICENSED THERMAL POWER (MWt):.......

... 2544 4.

NAMEPLATE RATING (GROSS MWe):.....

.... 890.

5. DESIGN ELECTRICAL RATING (NET MWe):......... 825
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):...

818

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

N/A

10. REASONS FOR RESTRICTIONS,IF ANY:

N/A THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0-5,855.0 -

170,687.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0-3,242.1 117.350.2 -.
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,280.6
14. HRS GENERATOR ON LINE 744.0 -

3,064.5 115,283.7-

15. UNIT RESERVE SHUTDOWN HOURS 0.0 -

0.0 -

0.0

16. GROSS THERMAL ENERGY GENERATED (MWH) 1,761,954-7,345.907 268,728,065
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 608,877'

-2,513,106 :

91,859,299

18. NET ELECTRICAL ENERGY GENERATED (MWH) 577,026 2.384.600 -

87,369,613

19. UNIT SERVICE FACTOR 100.0 %

52.3%

67.5 %

20. UNIT AVAILABLE FACTOR 100.0 %

52.3%

67.5 %

21. UNIT CAPACITY FACTOh gusing MDC net) 94.8 %

49.8 %

63.3 %

22. UNIT CAPACITY FACTOR (using DER nM) 94.0 %

49.4 %

62.0 %

23. UNIT FORCED OUTAGE RATE 0.0%

16.0%

15.3 %

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

q e

AVERAGE DAILY UNIT POWER LEVEL

)

l l

DOCKET NO.

50-302 UNIT FLCRP-3 DATE SEPT 3,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) l l

1 842-17 816 2

843 18 845 3

846 19 844 4

845 20 846

.l 5

844 21 496' 4

6 843 22 755 j

i 7

843 23 846 j

8 842 24 845.-

9 841' 25 845 j

10 839 26 714-11 838' 27 700 12 842 28 699 l

13 845 29 689 14 818 30

'486 15 785 31 378 16

-784 INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the l

l reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-303

- UNIT FLCRP-3 REPORT MONTH. AUGUST DATE SEPT 3.1996 COMPLETED BY T V Dao TELEPHONE (352)795-6486 NO.

DATE TYPE (1)

DURATION REASON (2)

METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUlTING EVENT CODE (4)

CODE (5)

ACTION TO PREVENT DOWN REACTOR (3) REPORT #

RECURRENCE 96-19 960814 F

0 A

5 N/A HH VALVEX Power reduction to 94% to repair heater drain valve HDV-61 (stem / disk separation).

96-20 960820 F

0 A

5 N/A HH CKTBRK Condensate pump CWP-1B was uncoupled resulting in a rapid power reduction to 60%.

The most likely cause was arcing between the lower and upper coupling brushes due to carbon buildup in the brush holder post.

96-21 960826 S

O A

5 N/A HF PIPEXX Power reduction to 85% to repair circulating water pump CWP-1 A discharge header through wall leaks.

96-22 960829 S

0 A

5 N/A HA VALVEX Power reduction to 80% to replace malfunctioned trip test solenoid valves for reheat valves RHV-2 and RHV-8.

96-23 960830 F

0 A

5 N/A HA BLOWER Power reduction to 40% to replace a damaged blower belt for the isophase bus duct cooler.

1 2

3 4

5 F: FORCED REASON.

METHOD EXHIBIT G - thSTRUCTIONS EXHIBTT I-SAME SOURCE S: SCHEDULED A-EQUIPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-Rt M ING 3-AUTO SCRAM EVENT REPORT (LEFQ FILE D-REGULATORY RESTRICTION 4-CONTINUED (NUREG-0161)

E-OPERATOR TRAINING &

5-REDUCED LOAD LICENSE ADMINISTRATION 9-OTHER F-ADMINISTRATION G-OPERATIONAL ERROR H-O

l b

.o ~

MONTHLY OPERATIONAL

SUMMARY

STATEMENT i

I DOCKETNO.

50-302 UNIT FLCRP-3 DATE SEPT 3,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH: AUGUST l

SUMMARY

STATEMENT:

There were five power reductions during the month of August.

Power was reduced to 94% on 08/14 to repair HDV-61,60% on 08/20 due to CDP-1B uncoupled,85% on 08/26 to repair CWP-1 A discharge header,80% on 08/29 to replace trip test solenoid valves for RHV-2/RHV-8, and 40% on 08/30 to replace a damaged blower belt for TBHE-1.

l i

.