Text
_
- a.'
,9 Florida Power CORPORATION 0 70' September 12, 1996 3F096-03 U. S. Nuclear Regulatory Commission i
Attn:
Document Control Desk Washington, DC 20555-0001
Subject:
Monthly Operating Report
Dear Sir:
Attached is the Crystal River Unit-3 August 1996 Monthly Operating Report. This report is submitted in accordance with Technical Specification 5.7.1.2.
Sincerely, G. L.
Idt Vice President Nuclear Production GLB/ff Attachment xc: Regional Administrator, Region II l
Senior Resident Inspector NRR Project Manager i
9609190244 5'60831 PDR ADOCK 05000302 R
PDR CRYSTAL ANER ENERGY COMPLEX: 15760 W Power uno St. Ciystal River, Florida 344286708 e (352) 796 4486 A Florida Pmgress Cortpany L
~
OPERATING DATA REPORT i
DOCKET NO.
50-302 UNIT FLCRP-3 DATE SEPT 3,1996h COMPLETED BY T V Dao TELEPHONE (352) 795-6486 OPERATING STATUS 1.
UNIT NAME:......
CRYSTAL RIVER UNIT 3
- 2. REPORTING PERIOD:...
AUGUST
' 3. LICENSED THERMAL POWER (MWt):.......
... 2544 4.
NAMEPLATE RATING (GROSS MWe):.....
.... 890.
- 5. DESIGN ELECTRICAL RATING (NET MWe):......... 825
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):...
818
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
N/A
- 10. REASONS FOR RESTRICTIONS,IF ANY:
N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0-5,855.0 -
170,687.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0-3,242.1 117.350.2 -.
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,280.6
- 14. HRS GENERATOR ON LINE 744.0 -
3,064.5 115,283.7-
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 -
0.0 -
0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,761,954-7,345.907 268,728,065
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 608,877'
-2,513,106 :
91,859,299
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 577,026 2.384.600 -
87,369,613
- 19. UNIT SERVICE FACTOR 100.0 %
52.3%
67.5 %
- 20. UNIT AVAILABLE FACTOR 100.0 %
52.3%
67.5 %
- 21. UNIT CAPACITY FACTOh gusing MDC net) 94.8 %
49.8 %
63.3 %
- 22. UNIT CAPACITY FACTOR (using DER nM) 94.0 %
49.4 %
62.0 %
- 23. UNIT FORCED OUTAGE RATE 0.0%
16.0%
15.3 %
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
THIS ITEM IS NOT APPLICABLE TO CR FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA
q e
AVERAGE DAILY UNIT POWER LEVEL
)
l l
DOCKET NO.
50-302 UNIT FLCRP-3 DATE SEPT 3,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) l l
1 842-17 816 2
843 18 845 3
846 19 844 4
845 20 846
.l 5
844 21 496' 4
6 843 22 755 j
i 7
843 23 846 j
8 842 24 845.-
9 841' 25 845 j
10 839 26 714-11 838' 27 700 12 842 28 699 l
13 845 29 689 14 818 30
'486 15 785 31 378 16
-784 INSTRUCTIONS:
On this format, list the daily average unit power level in MWe-Net for each day in the l
l reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-303
- UNIT FLCRP-3 REPORT MONTH. AUGUST DATE SEPT 3.1996 COMPLETED BY T V Dao TELEPHONE (352)795-6486 NO.
DATE TYPE (1)
DURATION REASON (2)
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUlTING EVENT CODE (4)
CODE (5)
ACTION TO PREVENT DOWN REACTOR (3) REPORT #
RECURRENCE 96-19 960814 F
0 A
5 N/A HH VALVEX Power reduction to 94% to repair heater drain valve HDV-61 (stem / disk separation).
96-20 960820 F
0 A
5 N/A HH CKTBRK Condensate pump CWP-1B was uncoupled resulting in a rapid power reduction to 60%.
The most likely cause was arcing between the lower and upper coupling brushes due to carbon buildup in the brush holder post.
96-21 960826 S
O A
5 N/A HF PIPEXX Power reduction to 85% to repair circulating water pump CWP-1 A discharge header through wall leaks.
96-22 960829 S
0 A
5 N/A HA VALVEX Power reduction to 80% to replace malfunctioned trip test solenoid valves for reheat valves RHV-2 and RHV-8.
96-23 960830 F
0 A
5 N/A HA BLOWER Power reduction to 40% to replace a damaged blower belt for the isophase bus duct cooler.
1 2
3 4
5 F: FORCED REASON.
METHOD EXHIBIT G - thSTRUCTIONS EXHIBTT I-SAME SOURCE S: SCHEDULED A-EQUIPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-Rt M ING 3-AUTO SCRAM EVENT REPORT (LEFQ FILE D-REGULATORY RESTRICTION 4-CONTINUED (NUREG-0161)
E-OPERATOR TRAINING &
5-REDUCED LOAD LICENSE ADMINISTRATION 9-OTHER F-ADMINISTRATION G-OPERATIONAL ERROR H-O
l b
.o ~
MONTHLY OPERATIONAL
SUMMARY
STATEMENT i
I DOCKETNO.
50-302 UNIT FLCRP-3 DATE SEPT 3,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH: AUGUST l
SUMMARY
STATEMENT:
There were five power reductions during the month of August.
Power was reduced to 94% on 08/14 to repair HDV-61,60% on 08/20 due to CDP-1B uncoupled,85% on 08/26 to repair CWP-1 A discharge header,80% on 08/29 to replace trip test solenoid valves for RHV-2/RHV-8, and 40% on 08/30 to replace a damaged blower belt for TBHE-1.
l i
.