Monthly Operating Rept for Aug 1996 for Crystal River Unit 3
ML20117N510
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/1996
From: Boldt G, Dao T
FLORIDA POWER & LIGHT CO., FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F096-03, 3F96-3, NUDOCS 9609190244
Download: ML20117N510 (5)


Text

_

a.'

9 Florida Power CORPORATION 0 70' September 12, 1996 3F096-03 U. S. Nuclear Regulatory Commission i Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3 August 1996 Monthly Operating Report. This report is submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, G. L. Idt  !

Vice President '

Nuclear Production GLB/ff Attachment xc: Regional Administrator, Region II Senior Resident Inspector l NRR Project Manager i

9609190244 5'60831 PDR ADOCK 05000302 R PDR CRYSTAL ANER ENERGY COMPLEX: 15760 W Power uno St . Ciystal River, Florida 344286708 e (352) 796 4486 A Florida Pmgress Cortpany L

_. ~

OPERATING DATA REPORT i

. . DOCKET NO. 50-302 UNIT FLCRP-3 DATE SEPT 3,1996 COMPLETED BY T V Dao TELEPHONE h ,

(352) 795-6486 OPERATING STATUS

1. UNIT NAME:. .. ... .. . . . . . . .. .. CRYSTAL RIVER UNIT 3
2. REPORTING PERIOD:... .. . . . . AUGUST

' 3. LICENSED THERMAL POWER (MWt):.... . .. . . . . ... 2544

4. NAMEPLATE RATING (GROSS MWe):. . .. . ... . 890 .
5. DESIGN ELECTRICAL RATING (NET MWe):. .... .. . . 825
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. . . 818
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744.0- 5,855.0 - 170,687.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0- 3,242.1 117.350.2 -.
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,280.6
14. HRS GENERATOR ON LINE 744.0 - 3,064.5 115,283.7-
15. UNIT RESERVE SHUTDOWN HOURS 0.0 - 0.0 - 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,761,954- 7,345.907 268,728,065
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 608,877' -2,513,106 : 91,859,299
18. NET ELECTRICAL ENERGY GENERATED (MWH) 577,026 2.384.600 - 87,369,613
19. UNIT SERVICE FACTOR 100.0 % 52.3% 67.5 %
20. UNIT AVAILABLE FACTOR 100.0 % 52.3% 67.5 %
21. UNIT CAPACITY FACTOh gusing MDC net) 94.8 % 49.8 % 63.3 %
22. UNIT CAPACITY FACTOR (using DER nM) 94.0 % 49.4 % 62.0 %
23. UNIT FORCED OUTAGE RATE 0.0% 16.0% 15.3 %
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

e q l

AVERAGE DAILY UNIT POWER LEVEL )

. , l l

DOCKET NO. 50-302 UNIT FLCRP-3 DATE SEPT 3,1996 I

COMPLETED BY T V Dao TELEPHONE (352) 795-6486 ,

MONTH AUGUST DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) l 1 842- 17 816 l

2 843 18 845 _

3 846 19 844 4 845 20 846

.l 5 844 21 496' 4 6 843 22 755 j i

7 843 23 846 j 8 842 24 845.-

9 841' 25 845  ;

10 839 26 714- j 11 838' 27 700 12 842 28 699 l l

13 845 29 689 14 818 30 '486 15 785 31 378 16 -784 INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the l

l reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS ,

DOCKET NO. 50-303 *

- UNIT FLCRP-3 ,

REPORT MONTH. AUGUST DATE SEPT 3.1996 ,

COMPLETED BY T V Dao TELEPHONE (352)795-6486 .

NO. DATE TYPE (1) DURATION REASON (2) METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUlTING EVENT CODE (4) CODE (5) ACTION TO PREVENT DOWN REACTOR (3) REPORT # RECURRENCE 96-19 960814 F 0 A 5 N/A HH VALVEX Power reduction to 94% to repair heater drain valve HDV-61 (stem / disk separation).

96-20 960820 F 0 A 5 N/A HH CKTBRK Condensate pump CWP-1B was uncoupled resulting in a rapid power reduction to 60%.

The most likely cause was arcing between the lower and upper coupling brushes due to carbon buildup in the brush holder post.

96-21 960826 S O A 5 N/A HF PIPEXX Power reduction to 85% to repair circulating water pump CWP-1 A discharge header through wall leaks.

96-22 960829 S 0 A 5 N/A HA VALVEX Power reduction to 80% to replace malfunctioned trip test solenoid valves for reheat valves RHV-2 and RHV-8.

96-23 960830 F 0 A 5 N/A HA BLOWER Power reduction to 40% to replace a damaged blower belt for the isophase bus duct cooler.

1 2 3 4 5 F: FORCED REASON. METHOD EXHIBIT G - thSTRUCTIONS EXHIBTT I- SAME SOURCE S: SCHEDULED A-EQUIPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-Rt M ING 3-AUTO SCRAM EVENT REPORT (LEFQ FILE D-REGULATORY RESTRICTION 4-CONTINUED (NUREG-0161)

E-OPERATOR TRAINING & 5- REDUCED LOAD LICENSE ADMINISTRATION 9-OTHER F-ADMINISTRATION G-OPERATIONAL ERROR H-O

l b

.o ~

MONTHLY OPERATIONAL

SUMMARY

STATEMENT ,

i I

DOCKETNO. 50-302 UNIT FLCRP-3 DATE SEPT 3,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 l MONTH: AUGUST  !

l l

SUMMARY

STATEMENT:

There were five power reductions during the month of August.

! Power was reduced to 94% on 08/14 to repair HDV-61,60% on 08/20 due to CDP-1B uncoupled,85% on 08/26 to repair CWP-1 A discharge header,80% on 08/29 to replace trip test solenoid valves for RHV-2/RHV-8, and 40% on 08/30 to replace a damaged blower belt for TBHE-1.

l l

i