Florida Power
- =%
ma on. w m September 15,1997 3F0997-08 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 0001
Subject:
Monthly Operating Report Gentlemen:
Attached is the Crystal River Unit 3, August 1997 Monthly Operating Report. This report is being submitted in accordance with Technical Specification 5.7.1.2.
Sincerely, Q94 Robert E. Grazio %*)
Director, Nuclear Regulatory Affairs REG:ff Attachment Regional Administrator, Region ll
\\
xc:
Senior Resident inspector g
NRR Project Manager 9709230023 970915 PDR ADOCK 05000302 llh$fi ! !)l!!!!!ill!!!l R
PDR CRYSTAL RIVER ENERGY COMPLEX: 1s7eo o
s c,,cw ww. nome us2s stos e us23 7ss e4as
o OPERATING DATA REPORT e
DOCKET No.
50-302 UNIT FLCRP-3 DATE SEPT 2,1997 T V Deo 44 (,h COMPLETED BY iELEPHO W (352) 795-6486 OPERATING STATUS
- 2. REPORTING PERIOD:........................................ AUGUST 1997
- 3. LlCENSED THERM AL POWER (MWt):....................... 2544
- 4. N AMEPLATE RATING (GROSS MWe):..................... 890
- 5. DESIGN ELECTRICAL RATING (NET MWe):..........
825
- 6. MAXIMUM DEPENDABLE CAPACRY (GROSS MWe):,. 860
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):..... 818
- 8. IF CHANGE 8 OCCUR IN C APACITY RATINGS (ITEM 8 NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. b IER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWe):
N/A
- 10. REA 50NS FOR RESTRICTIONS,IF ANY:
N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 5.831.0 179,447.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
-0.0 0.0 117,416.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.080.6
- 14. HRS GENERATOR ON LINE 0.0 0.0 115.328.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0-0 268.847.210
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0
91.894.033
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0
87.402.384
- 19. UNIT SERVICE FACTOR 0.0%
0.0%
64.3 %
20.- UNIT AVAILABLE FACTOR 0.0%
0.0%
64.3 %
- 21. UNIT CAPACITY FACTOR (using MDC net) 0.0%
0.0%
60.2 %
- 22. UNIT CAPACITY FACTOR (using DER net) 0.0%
0.0%
59.0%
- 23. UNIT FORCED OUTAGE RATE 100.0 %
100.0 %
20.4 %
- 24. SliUTDOWNS SCHEDULED OVER NEXT SIX MOliTHS (TYPE DATE. AND DURATION OF EACH):
Continuation of the Design Basis issues outage (11 A) until December 31.1997 to preoare and implement i
modifications to improve various design margins.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
DECEMBER 31,1997
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP-3 DATE SEPT 2,1997 COMPLETED BY T V Dao 1ELEPHONE (352)7 % 6480 _
MONTH AUGUST 1997 DAY - - AVERAGE DAILY POWER LEVEL
-DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11,
0 27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0'
- INSTRUCTIONS:
s On this format, list the daily average unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt,
UNIT SHUTDOWNS AND POWER REDUCTIONS ooCKETNO.
50- M UNIT FLCRP-a IEPORT MONTH-AUGUST 1997 DATE SEPT 2. T997 COtfPLETED BY T V Dao TELEPHONE c53 795-64ss NO.
DATE TYPE (1)
DURATION REASON (2)
METHOD OF UCENSEE SYSTBW COMPONENT CAUSE AND CORRECTIVE HOURS SHUTTING EVENT CODE (4)
CODE (5)
ACTION TO PREVENT DOWN IEACTOR(3) REPORT #
IECUfMENCE 97-08 970801 F
744 D
4 W C20-00 EE ENGINE Reactor remained in cold shutdown to 96-022-00 AB prepare and implement moddicaixms 96-022-01 AB to improve various desgn margs 96-024-00 CH 96-024-01 CH 97-001-00 CH 97-005-00 CH 97-008-00 SF i
l 1
l 1
2 3
4 S
F: FORCED NASON' teEsNOO EXHIEUT G - ptSTRUCTaONS ERHIBrT t - SAasE SOUNCE 8; SCHEDULED A-EQUIFwENT FAltUfE t-a4ANUAL FOR PFEPARATIOss OF OATA B-aAAINTEMANN OR TEST 2 ad ANUAL SCRAAf ENTRY SHEETS FOR t.ICENSEE 3-Alff0 SCRAM EVENT $EP".3RT Reft FILE C-tEFUElegrA 44lONTWWED (NUPEG e*)
O-NGULATORY re a r em,mm 5-5EDUND LOAD E OPERATOR TRAINING &
s.cTNER 11 LICENSE ADefesSTRATKWe FNTKW6 G-OfTRATIONAL ERROR (EXMAp9 M-OTHER
MONTHLY OPERATIONAL
SUMMARY
STATEMENT DOCKET NO.
50-302 UNR FLCRP 3 DATE SEPT 2,1997 COMPLETED BY T V Dao TELEPHONE (352)795-6486
- MONTH: AUGUST 1997
SUMMARY
STATEMENT:
Crystal River remained in cold shutdown through August 1997 to resolve the emergency diesel generator maximum electricalloading issue and to prepare and implement modifications to improve various design margins.
There were no challenges to the pressurizor power operated relief valve or pressurizer safety valves during the reporting period.