3F0396-06, Monthly Operating Rept for Feb 1996 for Crystal River Unit 3

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1996 for Crystal River Unit 3
ML20101A207
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/29/1996
From: Boldt G, Dao T
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0396-06, 3F396-6, NUDOCS 9603130040
Download: ML20101A207 (5)


Text

. .-

l Florida )

Power CORPORATION i

$?$

March 8, 1996 3F0396-06 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3 February 1996 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, b

G. L. oldt

  • Vice President Nuclear Operations GLB/lf ,

Attachment i xc: Regional Administrator, Region II Senior Resident Inspector NRR Project Manager 1

l i

l 120052 9603130040 960229 PDR ADOCK 05000302 / /> 1) -

R PDR CRYSTAL RfVER ENERGY COWUX: 15760 W Power Une Gt Crystal Rwer, Floride 344284708 . (352) 7566486 l A Harkia Proyees Corrymy l

I OPERATING DATA REPORT DOCKET NO. 50-302 UNIT FLCRP-3 DATE MARCH 5,1996 COMPLETED BY T V Dao ,

TELEPHONE (352) 795-6486 OPERATING STATUS l

1. UNIT NAME:. . . CRYSTAL RIVER UNIT 3
2. REPORTING PERIOD:. . FEBRUARY l
3. LICENSED THERMAL POWER (MWt):. . 2544
4. NAMEPLATE RATING (GROSS MWe):. 890
5. DESIGN ELECTRICAL RATING (NET MWe):. 825
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):. 860
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. . 818
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 696.0 1,440.0 166,272.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 381.5 689.6 114,797.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,280.6
14. HRS GENERATOR ON LINE 380.4 677.0 112,896.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 963.401 1,695,43? 263,077,591
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 333,214 580,431 89,926,624
18. NET ELECTRICAL ENERGY GENERATED (MWH) 318,333 554,151 85,539,164
19. UNIT SERVICE FACTOR 54.7 % 47.0 % 67.9 %
20. UNIT AVAILABLE FACTOR 54.7 % 47.0% 67.9 %
21. UNIT CAPACITY FACTOR (using MDC net) 55.9 % 47.0% 63.7 %
22. UNIT CAPACITY FACTOR (using DER net) 55.4 % 46.6 % 62.4 %
23. UNIT FORCED OUTAGE RATE 0.0% 39.8 % 15.5 %
24. SHUTDOVIN3 SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUEL 10 BEGAN 02/16/96 WITH A PROJECTED DURATION OF 54 DAYS.

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

l l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE MARCH 5,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH FEBRUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 839 17 0 2 '841 18 0-3 841- 19 'O 4 -840' 20 0 5 841 21 0 6 838 22 0-7 838 23 0 8 840 24 0 9 839 25 0 10 844 26 0 11 844- 27 0 12 844 28 0 13 844 29 0 14 844 30 N/A 15 845 31 N/A 16 659 INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the l

reporting month. Compute to the nearest whole megawatt.

l l

UNIT SHUTDOWNS AND POWER REDUCTIONS DoCxET wo. so-sas .

UNIT FLCRP-3 REPORT MONTH FEBRUARY DATE MARCH 5.1996 ~

COMPLETED BY T V Dao TELEPHONE (352)795-6486 NO. DATE TYPE (1) DURATION REASON (2) METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE -

HOURS SHUTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT DOWN REACTOR (3) REPORT # RECURRENCE 96-03 960216 S 315.6 C 1 N/A ZZ 777777 Start of Refuel 10.

1 2 3 4 5 F: FORCED REASON. METHOD EXHIBIT G -INSTRUCTIONS EXHIBIT I- SAME SOURCE R SCHEDULED A--EQUIPMENT FAILURE 1-MA*iUAL FOR PREPARATION OF DATA MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-REFUEUNG 3-AUTO SCRAM EVENT REPORT (LER) FILE WGULATORY RESTRCTION 4-CONTINUED (NUREG-01st)

E-OPERATOR TRANNG & 6-REDUCED LGAD LICENSE ADMMSTRATION 0-OTHER F-ADMHSTRATION G-OPERATIONAL ERROR M THER

, a * -

MONTHLY OPERATIONAL

SUMMARY

STATEMENT

- s DOCKET NO. 50-302 UNIT FLCRP-3 DATE MARCH 5,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 MONTH: FEBRUARY

SUMMARY

STATEMENT:

Crystal River Unit # 3 was taken offline on 02116 to begin Refuel 10.

/~