3F0697-01, Monthly Operating Rept for May 1997 for Crystal River 3

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1997 for Crystal River 3
ML20140H140
Person / Time
Site: Crystal River 
Issue date: 05/31/1997
From: Dao T, Grazio R
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0697-01, 3F697-1, NUDOCS 9706180061
Download: ML20140H140 (5)


Text

of.

4

.y Florida Power

~

1,"=L Cr.cs:No 50302 June 11,1997 3F0697-01 U. S. Nuclear Regulatory Commission Atto: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3, May 1997 Monthly Operating Report. This report is being submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, Robert E. Grazio Director, Nuclear Regulatory Affairs REG:ff f

Attachment 1

xc: Regional Administrator, Ragion il t

Senior Resident inspector I

NRR Project Manager 9706180061 970531 PDR ADOCK 05000302 l

R PDR l

170003 l!lllllllllll!lljlll!!l!!Ijlllllllllll!

CRYSTAL RIVER ENERGY COMPLEX: 167so w Po.., Lin. si. cryst : n v.,. Finetos34428 6708 * (352) 795-6488 A Floruta Progress Company

- _ - ~ _ -. - ~ -

E i

l OPERATING DATA REPORT DOCKET NO.

50-302 I

UNIT FLCRP-3 DATE JUNE 2,1997

+

COMPLETED BY T V Dao AGsd j

TELEPHONE (352) 795-6486 OPERATING STATUS l

l

1. UNIT N AME:.............

CRYSTAL RIVER UNIT 3 f

2. REPORTING PERIOD:...

MAY 1997 t

3. LICENSED THERMAL POWER (MWt):.

2544

{

4.

NAMEPLATE RATING (GROSS MWe):.

890 I

i 5.

DESIGN ELECTRICAL RATING (NET MWe):..

825 I

l

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):.... ' 818
8. ' IF JHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

I

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

N/A

10. REASONS FOR RESTRICTIONS,IF ANY:

N/A THIS MONTH YR. TO DATE CUMULATIVE i

11. HOURS IN REPORTING PERIOD 744.0 3,623.0' 177,239.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 117,416.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0

~ 0.0 1,280.6

14. HRS GENERATOR ON LINE 0.0 0.0 115.328.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0.

0.0

16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0

268.847,210

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0

91,894,033 -

18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0

87,402,584

[

19. UNIT SERVICE FACTOR 0.0%

0.0%

65.1 %

20. UNIT AVAILABLE FACTOR 0.0%

0.0%

65.1 %

21. UNIT CAPACITY FACTOR (using MDC net) 0.0%

0.0%

61.0 %

22. UNIT CAPACITY FACTOR (using DER net) 0.0%

0.0%

59.8 %

]

23. UNIT FORCED OUTAGE RATE 100.0 %

100.0 %

19.1 %

l

24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

Continuation of the Design Basis issues outage (11 A) until December 31,1997 to prepare and implement modifications to improve various design margins.

]

25.. lF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DECEMBER 31,1997

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED l

lNITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA l

I

)

C-k 1

l AVERAGE DAILY UNIT POWER LEVEL f

i l

t DOCKET NO.

50-302 UNIT FLCRP-3 i

l DATE JUNE 2,1997 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 i

I MONTH MAY 1997 j

I I

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) l 1

0 17 0

2 0

18 0

3 0

19 0

4 0

20 0

i l

l 5

0 21 0

l 6

0 22 0

7 0

23 0

8

.0-24 0

9 0

25 0-f 10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

l 15 0

31 0

i l

16 0

l l

INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the I

reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DocxET wo.

So-saa UNIT FLCRP-3 REPORT MONTH MAY 1997 DATE JUNE 2.1997 COMPLETED BY T V Dao TELEPHONE (352)795-6488 NO.

DATE TYPE (1)

DURATION REASON (2)

METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTHNG EVENT CODE (4)

CODE (5)

ACTION TO PREVENT DOWN REACTOR (3) REPORT #

RECURRENCE 97-05 970501 F

744 D

4 96-020-00 EE ENGINE Reactor remained in cold shutdown to 96-022-00 AB prepare and implement modifications 96-022-01 AB to improve various design margins.

96-024-00 CH 96-024-01 CH 97-001-00 CH 97-005-00 CH 97-008-00 SF 4

I 1

2 3

4 5

F: FORCED REASON:

METHOD EXHIBfT G-IftSTRUCTKess EXHtBIT I-SAME SOURCE S: SCHEDULED A-EQUIPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA I

B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE CAEFUELING 3-AUTO SCRAM EVENT REPORT (LEM FILE D-REGULATORY RESTNICTION 6 1NUED (NURE44161) i F

EMRATOR TRAINING &

5-REDUCED LOAD LICENSE ADMINISTRATION 9-OTHER F-ADMINISTRATION G-OPERATIONAL ERROR (EXPLAIN) g H-0THER I

..-....--,..,_-.m

...., ~,.

- -...~.

.--.. ~...

MONTHLY OPERATIONAL

SUMMARY

STATEMENT t

P DOCKET NO.

50-302 UNIT FLCRP-3 DATE JUNE 2,1997 l

COMPLETED BY T V Dao TELEPHONE (352) 795-6486 1

MONTH: MAY 1997 i

SUMMARY

STATEMENT:

Crystal River remained in cold shutdown through May 1997 to resolve the emergency diesel generator maximum electrical loading issue and to prepare and implement modifications to improve various design margins.