Monthly Operating Rept for May 1997 for Crystal River 3
ML20140H140
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1997
From: Dao T, Grazio R
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0697-01, 3F697-1, NUDOCS 9706180061
Download: ML20140H140 (5)


Text

  • of. 4

.y -.

Florida

~

Power 1,"=L Cr.cs:No 50302 June 11,1997 3F0697-01 U. S. Nuclear Regulatory Commission Atto: Document Control Desk Washington, D.C. 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3, May 1997 Monthly Operating Report. This report is being submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, Robert E. Grazio Director, Nuclear Regulatory Affairs REG:ff f Attachment 1 xc: Regional Administrator, Ragion il t Senior Resident inspector I

NRR Project Manager 9706180061 970531

. PDR ADOCK 05000302 l R PDR l l

l 170003 l l!lllllllllll!lljlll!!l!!Ijlllllllllll!

CRYSTAL RIVER ENERGY COMPLEX: 167so w Po.., Lin. si . cryst : n v.,. Finetos34428 6708 * (352) 795-6488 A Floruta Progress Company l

_ . . .- . - _ . - - - - - - - _ - ~ _ - . - ~ - - - . _ - . . - . . - . - . --

E i

l

OPERATING DATA REPORT  :

. DOCKET NO. 50-302 I

  • UNIT FLCRP-3 DATE JUNE 2,1997 +

COMPLETED BY T V Dao AGsd j TELEPHONE (352) 795-6486  ;

OPERATING STATUS ,

l  !

l

1. UNIT N AME:. .. ..... . . . .. .. . . . . - . .. CRYSTAL RIVER UNIT 3 f
2. REPORTING PERIOD:.. . . . . . . . . . . . . . . . . . . MAY 1997  !

t

3. LICENSED THERMAL POWER (MWt):. . . . . . . 2544 {
4. NAMEPLATE RATING (GROSS MWe):. .. ..... 890 I i 5. DESIGN ELECTRICAL RATING (NET MWe):.. .. 825 I l 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860  ;
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. ... ' 818
8. ' IF JHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: I
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,IF ANY: N/A ,

THIS MONTH YR. TO DATE CUMULATIVE i

11. HOURS IN REPORTING PERIOD 744.0 3,623.0' 177,239.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 117,416.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 ~ 0.0 1,280.6
14. HRS GENERATOR ON LINE 0.0 0.0 115.328.7  !
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 . 0.0  :
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 268.847,210
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 91,894,033 -
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0 87,402,584 [
19. UNIT SERVICE FACTOR 0.0% 0.0% 65.1 %
20. UNIT AVAILABLE FACTOR 0.0% 0.0% 65.1 %
21. UNIT CAPACITY FACTOR (using MDC net) 0.0% 0.0% 61.0 %
22. UNIT CAPACITY FACTOR (using DER net) 0.0% 0.0% 59.8 %

]

23. UNIT FORCED OUTAGE RATE 100.0 % 100.0 % 19.1 % l
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): ,

Continuation of the Design Basis issues outage (11 A) until December 31,1997 to prepare and implement modifications to improve various design margins. ]

25. . lF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: DECEMBER 31,1997
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED lNITIAL CRITICALITY NA NA l

INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA l

I )

, C- . k 1

l . AVERAGE DAILY UNIT POWER LEVEL f i

l t

DOCKET NO. 50-302 UNIT FLCRP-3 i l DATE JUNE 2,1997 ,

COMPLETED BY T V Dao  !

TELEPHONE (352) 795-6486 i

I

MONTH MAY 1997 j

I I

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL '

(MWe-Net) (MWe-Net) ,

l 1 0 17 0 2 0 18 0 3 0 19 0  :

4 0 20 0 i l

l 5 0 21 0 l

6 0 22 0 7 0 23 0 ,

8 .0- 24 0

, 9 0 25 0-10 0 26 0 f

11 0 27 0 12 0 28 0 13 0 29 0  ;

14 0 30 0 l 15 0 31 0  ;

i l 16 0  !

l l INSTRUCTIONS:  !

On this format, list the daily average unit power level in MWe-Net for each day in the I reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DocxET wo. So-saa UNIT FLCRP-3 REPORT MONTH MAY 1997 DATE JUNE 2.1997 COMPLETED BY T V Dao , ,

TELEPHONE (352)795-6488 NO. DATE TYPE (1) DURATION REASON (2) METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTHNG EVENT CODE (4) CODE (5) ACTION TO PREVENT DOWN REACTOR (3) REPORT # RECURRENCE 97-05 970501 F 744 D 4 96-020-00 EE ENGINE Reactor remained in cold shutdown to 96-022-00 AB prepare and implement modifications 96-022-01 AB to improve various design margins.

96-024-00 CH 96-024-01 CH 97-001-00 CH 97-005-00 CH 97-008-00 SF 4

I 1 2 3 4 5 F: FORCED REASON: METHOD EXHIBfT G-IftSTRUCTKess EXHtBIT I- SAME SOURCE S: SCHEDULED A-EQUIPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA I B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE CAEFUELING 3-AUTO SCRAM EVENT REPORT (LEM FILE D-REGULATORY RESTNICTION 6 1NUED (NURE44161) i EMRATOR TRAINING &

F 5-REDUCED LOAD LICENSE ADMINISTRATION 9-OTHER F-ADMINISTRATION G-OPERATIONAL ERROR g (EXPLAIN)

H-0THER I

- - . - . _ . . _ , _ .,. ..-....--,..,_-.m . . . . , ~ , . . - . _ , - _ , - _ . . . , _ . . - . . , . _ .

, . - - - . _ . - .. - -.. .~. .--.. ~. . . _ -- . . _ - . - . - - . . ._

MONTHLY OPERATIONAL

SUMMARY

STATEMENT t

P DOCKET NO. 50-302

! UNIT FLCRP-3 DATE JUNE 2,1997 l COMPLETED BY T V Dao TELEPHONE (352) 795-6486 1

MONTH: MAY 1997 i

SUMMARY

STATEMENT:

Crystal River remained in cold shutdown through May 1997 to resolve the emergency diesel generator maximum electrical loading issue and to prepare and implement modifications to improve various design margins.

l l

l l

1 i

I