3F0697-01, Monthly Operating Rept for May 1997 for Crystal River 3
| ML20140H140 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/31/1997 |
| From: | Dao T, Grazio R FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 3F0697-01, 3F697-1, NUDOCS 9706180061 | |
| Download: ML20140H140 (5) | |
Text
of.
4
.y Florida Power
~
1,"=L Cr.cs:No 50302 June 11,1997 3F0697-01 U. S. Nuclear Regulatory Commission Atto: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report
Dear Sir:
Attached is the Crystal River Unit-3, May 1997 Monthly Operating Report. This report is being submitted in accordance with Technical Specification 5.7.1.2.
Sincerely, Robert E. Grazio Director, Nuclear Regulatory Affairs REG:ff f
Attachment 1
xc: Regional Administrator, Ragion il t
Senior Resident inspector I
NRR Project Manager 9706180061 970531 PDR ADOCK 05000302 l
R PDR l
170003 l!lllllllllll!lljlll!!l!!Ijlllllllllll!
CRYSTAL RIVER ENERGY COMPLEX: 167so w Po.., Lin. si. cryst : n v.,. Finetos34428 6708 * (352) 795-6488 A Floruta Progress Company
- _ - ~ _ -. - ~ -
E i
l OPERATING DATA REPORT DOCKET NO.
50-302 I
UNIT FLCRP-3 DATE JUNE 2,1997
+
COMPLETED BY T V Dao AGsd j
TELEPHONE (352) 795-6486 OPERATING STATUS l
l
- 1. UNIT N AME:.............
CRYSTAL RIVER UNIT 3 f
- 2. REPORTING PERIOD:...
MAY 1997 t
- 3. LICENSED THERMAL POWER (MWt):.
2544
{
4.
NAMEPLATE RATING (GROSS MWe):.
890 I
i 5.
DESIGN ELECTRICAL RATING (NET MWe):..
825 I
l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):.... ' 818
- 8. ' IF JHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
I
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
N/A
- 10. REASONS FOR RESTRICTIONS,IF ANY:
N/A THIS MONTH YR. TO DATE CUMULATIVE i
- 11. HOURS IN REPORTING PERIOD 744.0 3,623.0' 177,239.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 117,416.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0
~ 0.0 1,280.6
- 14. HRS GENERATOR ON LINE 0.0 0.0 115.328.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0.
0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0
268.847,210
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0
91,894,033 -
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 0
87,402,584
[
- 19. UNIT SERVICE FACTOR 0.0%
0.0%
65.1 %
- 20. UNIT AVAILABLE FACTOR 0.0%
0.0%
65.1 %
- 21. UNIT CAPACITY FACTOR (using MDC net) 0.0%
0.0%
61.0 %
- 22. UNIT CAPACITY FACTOR (using DER net) 0.0%
0.0%
59.8 %
]
- 23. UNIT FORCED OUTAGE RATE 100.0 %
100.0 %
19.1 %
l
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
Continuation of the Design Basis issues outage (11 A) until December 31,1997 to prepare and implement modifications to improve various design margins.
]
- 25.. lF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DECEMBER 31,1997
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED l
lNITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA l
I
)
C-k 1
l AVERAGE DAILY UNIT POWER LEVEL f
i l
t DOCKET NO.
50-302 UNIT FLCRP-3 i
l DATE JUNE 2,1997 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 i
I MONTH MAY 1997 j
I I
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) l 1
0 17 0
2 0
18 0
3 0
19 0
4 0
20 0
i l
l 5
0 21 0
l 6
0 22 0
7 0
23 0
8
.0-24 0
9 0
25 0-f 10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
l 15 0
31 0
i l
16 0
l l
INSTRUCTIONS:
On this format, list the daily average unit power level in MWe-Net for each day in the I
reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DocxET wo.
So-saa UNIT FLCRP-3 REPORT MONTH MAY 1997 DATE JUNE 2.1997 COMPLETED BY T V Dao TELEPHONE (352)795-6488 NO.
DATE TYPE (1)
DURATION REASON (2)
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTHNG EVENT CODE (4)
CODE (5)
ACTION TO PREVENT DOWN REACTOR (3) REPORT #
RECURRENCE 97-05 970501 F
744 D
4 96-020-00 EE ENGINE Reactor remained in cold shutdown to 96-022-00 AB prepare and implement modifications 96-022-01 AB to improve various design margins.
96-024-00 CH 96-024-01 CH 97-001-00 CH 97-005-00 CH 97-008-00 SF 4
I 1
2 3
4 5
F: FORCED REASON:
METHOD EXHIBfT G-IftSTRUCTKess EXHtBIT I-SAME SOURCE S: SCHEDULED A-EQUIPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA I
B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE CAEFUELING 3-AUTO SCRAM EVENT REPORT (LEM FILE D-REGULATORY RESTNICTION 6 1NUED (NURE44161) i F
EMRATOR TRAINING &
5-REDUCED LOAD LICENSE ADMINISTRATION 9-OTHER F-ADMINISTRATION G-OPERATIONAL ERROR (EXPLAIN) g H-0THER I
..-....--,..,_-.m
...., ~,.
- -...~.
.--.. ~...
MONTHLY OPERATIONAL
SUMMARY
STATEMENT t
P DOCKET NO.
50-302 UNIT FLCRP-3 DATE JUNE 2,1997 l
COMPLETED BY T V Dao TELEPHONE (352) 795-6486 1
MONTH: MAY 1997 i
SUMMARY
STATEMENT:
Crystal River remained in cold shutdown through May 1997 to resolve the emergency diesel generator maximum electrical loading issue and to prepare and implement modifications to improve various design margins.