ML20212D312
Jump to navigation
Jump to search
| ML20212D312 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/31/1983 |
| From: | Graham D FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML20212D280 | List: |
| References | |
| NUDOCS 8608120471 | |
| Download: ML20212D312 (1) | |
Text
_. _ _ _ - _ _ _ _ -_ _ _ _ ___ -
ATTACHMENT 3 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE 7/31/86 COMPLETED BY D. Graham TELEPHONE (904) 795-3802 MONTH 7/83 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
I O
17 0
2 0
18 0
0 0
3 39 4
0 20 0
5 0
21 0
'6
.0 22 0
7 0
0 23 8
0 24 0
0 0
9 25 10 0
26 0
II 27 0
12 28 I3 29 k 191) j 14 0
30 0
15 3i 16 0
INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
O (9/77) h h
D R
-...-