Florida Power CORPORATION ~  !

OTN December 8, 1995

3F1295-02 U. 3. Nuclear Regulat'ory Commission ~

Attn: Document Control Desk Washington, DC 20555

Subject:

Monthly Operating Report J

Dear Sir:

Attached is the Crystal River Unit-3 November 1995 Monthly Operating Report. This report is submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, i

G. L Boldt Vice President Nuclear Production GLB/ff Attachment xc: Regional Administrator, Region II Senior Resident Inspector NRR-Project Manager i20055 f5f u CRYSTAL FWVER ENERGY COMPLEX: 15700 W Power Une St Crystal FUver. Floride 3442&6708 . (904) 7954486 9512120010 951130 1

PDR ADOCK 05000302 R_ ,,

PDR

OPERATINO DATA REPORT DOCKET No. 50-302

  • UNIT FLCRP-3 DATE DECEMBER 4,1995 COMPLETED BY T V Dao TELEPHONE (904)795-6486 OPERATING STATUS h 1, U NIT N AM E:.. . . . . . . . . . . . . . . . . .. .. . . . . . . .. . . . . . . ... .. . ... CRYST L RIVER UNIT 3
2. REPORTING PERIOD:........... ... .. . ... ..... ; NOVEMBER '

3.' LICENSED THERMAL POWER (MWt):. .. . . 2544

4. NAMEPLATE RATING (GROSS MWe):.. . .... ........ . .. 1890 .

5 DESIGN ELECTRICAL RATING (NET MWe):.. .. .. ..... . 825 ..

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. 860 7 MAXIMUM DEPENDABLE CAPACITY (NET MWe):..... .. 818
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER S THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD -720.0 8.016.0 ^ 164,088.0
12. NUMBER OF HOJRS REACTOR WAS CRITICAL 720.0 - 8,016.0 113,364.1 ~
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 - 0.0 i L 1.280.6
14. HRS GENERATOR ON LINE 720.0 - 7,989.4i 111.475.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 ' O.0 - 0.0 :

, 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,825.935 20,142,500' . 259,489.671 ,

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 632.471' 6.932.317' 88,689.808 -
18. NET ELECTRICAL ENERGY GENERATED (MWH) 604,807  : 6,607,356: '84,357,422 :  ;

'19. UNIT SERVICE FACTOR '100.0 % 99.7 % 67.9 %

20. UNIT AVAILABLE FACTOR 100.0 % 99.7 % 67.9 % l
21. UNIT CAPACITY FACTOR (using MDC net) 102.7 % ~100.8% 63.6 % 1
22. UNIT CAPACITY FACTOR (using DER net) 101.8 % 99.9 % 62.3 %
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 15.3 %
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUEL 10. START 29 FEB.1996. END 15 APRll 1996. I

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DA1E OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

u -

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE DECEMBER 4,1995 COMPLETED BY T V Dao TELEPHONE (904) 795-6486

. MONTH NOVEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 836 17 840 2 809 18 845 3 809 19 2844-4 836 20 845-5 841 21 844-6 842 22 844 7 842 23 844.'

8 841- 24 844 9 843 25 844:

10 844 26 845-11 843- 27 -845 12 844- 28 844~

13 840- 29 844~

14 '840 30 839-15 840' 31 -N/A 16 839 INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-302 ,, ,

'JNIT FLCRP-3 ,

REPORT MONTH. NOVEMBER DATE. DECEMBER 4.1995 COMPLETED BY T V Dao

  • TELEPHONE (904)796-440e NO. DATE TYPE (1) DURATION REASON (2) METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTNE .

HOURS SHUTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT DOWN REACTOR (3) REPORT # RECURRENCE -

95-19 951101 S 0.0 B 5 N/A RC resse Reactor power was reduced to 96% to perform moderator temperature coeffcient determination testing l

s l

l l

l l

1 2 3 4 5 F: FORCED NASON'. METHOD EXMENT G - MSTft.fCTIONS EXHelf 1- sat #E SOURCE S: SCHE.DULED A-EOLMPMENT FAILUFE 1-MANUAL FOR PMPARATM OF DATA B-MANTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEET 8 FOR UCENSEE N 3-ALITO SCRAM EVENT KPORT(LEFQ FLE D-REGULATORY NSTRICTION 4-CONTINUED (NUNG-0181)

E-OPERATOR TRANNG & 5-fEDUCED LOAD UCENSE ADMNSTRATION 9-OTHER F-ADMNSTRATION G-OPERATIONAL ERROR (EXPLANO H-OTHER l-l

_ B

f. .
  • . . l' ' MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNTT FLCRP-3 DATE DECEMBER 4,1995 COMPLETED BY T V Dao TELEPHONE (904) 795-6486 MONTH: NOVEMBER

SUMMARY

STATEMENT:

Crystal River Unit # 3 operated at full power for the month of November with the exception of a power reduction on 11/01 to perform moderator temperature coefficient determination testing.

l l

l I

l i