ML20212D288

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1986
ML20212D288
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/31/1986
From: Graham D
FLORIDA POWER CORP.
To:
Shared Package
ML20212D280 List:
References
NUDOCS 8608120465
Download: ML20212D288 (5)


Text

,

OPERATING DATA REPOR1 DOCKET NO.

50-302 DATE 8/1/RG COMPLETED BY n nrnhnrn TELEPHONE (904) 795-3802 OPERATING STATUS N"k$

1. Unit Name:

Crystal River Unit 3 7/1/86 - 7/31/86

2. Reporting Period:

2544

3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

860

6. Maximum Dependable Capacity (Gross MWe):

821

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

NA NA

9. Power Level To Which Restricted,If Any (Net MWe):

NA

10. Reasons For Restrictions. lf Any:

This Month Yr.-to-Date Cumulative 744 5087 82271 i1. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical 744 1033.9 51334.9
13. Reactor Resene Shutdown Hours 0

0 1280.3

14. Hours Generator On.Line 744 1013.2 50104
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1807807 2424534 112893399 627223
17. Gross Electrical Energy Generated (MWH) 837271 38579333 596860 796142 36655728
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100 %

19.9%

60.9 %

100%

19.9%

60.9%

20. Unit Availability Factor 97.7 %

19.1%

55.8 %

21. Unit Capacity Factor (Using MDC~ Net)
22. Unit Capacity Factor (Using Deft Net) 97.2 %

19.0%

54.0 %

0%

80.1%

24.1 %

23. Unit Foiced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

.NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

NA

26. Units in Test Status (Prior to Commercial Operation):

forecast Achicked INITI AL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMMERCIAL OPER ATION 3/13/77 8608120465 860807 DR ADOCK 05000302 (9/77)

PDR

A\\ l R AC.L D All Y l' Nil POh! R Li \\ l L DOCKET NO.

50-302 FLCRP-3 UNIT DATE 8/1/86 D. Graham COMPLETED BY TELEPHONE (904) 795-3802 MONTH July 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVFL (MWe-Net)

(MWe-Net) 830 819 g

g7 2

784 gg 819 3

833 39 760 4

828 20 783 831 770 5

21 6

707 22 776 7

633 23 79I 811 90 8

24 9

829 25 785 829 709 10 26 835 832 i

27 I

825 838 12 28 13 820 837 29 826 0

I4 30 15 829 832 33 840

)

16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/771 9

UNIT SHUTT) OWNS AND POWER REDUCTIONS F,

R P-3 T

ME DA TE 8/4/86 7/86 COMPLETED BY S. A. Stewart REPORT MONTH TELEPHONE (904) 795-3802 5

E Licensee Cause & Corrective

,$g i

jE'3 No.

Date g

3g js5 Event g?

ES Present Recurrence y

gg Report #

mO H

g 6

80-03 860706 F

0.0 A

5 NA IIC IITEXCII Reduced power to locate and repair a condenser salt water leak in the 'C' waterbox.

86-04 860726 F

0.0 A

5 NA Illi MOTORX Lost power to the 1A Condensate Pump Motor Controller. Plant reduced power to repair.

I I

2

'.)

4 F: Forced Reason:

Method Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) for Preparation of Data B Maintenance of Test

[,g*""*3 Entry Sheets for Licensee g,n g Ser,

C-Refueling 3-Auto scram Event Report (LE R) File (Nt!RI G D Regulatory Restriction 4-Continued 0161)

E-Operator Training & License Examination 5-Reduced Load 9-Other F-Administrative 3

G-Operational Error (Explain)

Exhibit I Same Source 03/77)

H-Other (Explain)

MONTHLY OPERATIONAL SlEiARY STATDIENT DOCKET NO.

50-302 UNIT FLCRP-3 DATE 8/4/86 COMPLETED BY S. A. Stewart TELEPHONE (904) 795-3802 MONTH July 1986

SUMMARY

STATEMENT:

Crystal River 3 operated normally during the month. The plant reduced power to plug a condenser salt leak and repair a motor controller on the "A" Condensate Pump.

O e

1

ATTACHMENT 2 Line 18 (MWH):

This Month, Year Month Yr-to-Date Cumulative September 1985 438,588 1,408,466 34,404,477 October 1985 481,825 1,890,291 34,886,302 November 1985 511,645 2,401,396 35,397,947 December 1985 461,639 2,863,575 35,859,586 January 1986 18,580 18,580 35,878,166 February 1986 0

18,580 35,878,166 March 1986 0

18,580 35,878,166 April 1986 0

18,580 35,878,156 May 1986 0

18,580 35,878,166 June 1986 180,702 199,282 36,058,868 l

-