Monthly Operating Rept for Dec 1995 for Crystal River Unit 3
ML20096C136
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/31/1995
From: Boldt G, Dao T
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0196-05, 3F196-5, NUDOCS 9601170132
Download: ML20096C136 (5)


Text

. . - _ .

4 Florida Power CORPORATION DUN January 8, 1996 3F0196-05 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Mcnthly Operating Report

Dear Sir:

Attached is the Crystal River Unit-3 December 1995 Monthly Operating Report.

This report is submitted in accordance with Technical Specification 5.7.1.2.

Sincerely, G. L. Boldt Vice President Nuclear Operations GL8/if Attachment xc: Fegional Administrator, Region II Sanior Resident Inspector N,lR Project Manager

' ^^^

960117OE3295I231 DR ADOCK 05000302 PDR I \

l !

CRYSTAL RNER ENERGY COMPLEX: 15760 W Power une St e Crystal FUver, Florida 3442&6708 e (352) 7954486 A florida Progress Company

OPERATING DATA REPORT o

DOCKET No. 50-302 UNU FLCRP-3 DATE JANUARY 4,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486

_QPg1ATING STATUS

1. UNIT NAME:... .. . . . . . ... . .. . CRYSTAL RIVER UNIT 3 -
2. REPORTING PERIOD:..... .. . . . . . . . . . . . . . . . . . . . . . . . DECEMBER ~ l
3. LICENSED THERMAL POWER (MWt):... .. .... . .... . 2544-
4. NAMEPLATE RATING (GROSS MWe):. . . . . . . . . 890-
5. DESIGN ELECTRICAL RATING (NET Gn):. .. ... . 825
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):.. - 860 -
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. ... ~ 818
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER S THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744.0- 8,760.0 - 164,832.0 -
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 ~ 8,760.0 - 114.108.1-
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 - 1,280.6
14. HRS GENERATOR ON LINE 744.0 : 8,733.4 112.219.2 -
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 '
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,892,488 - 22,034,987 1 261,382,158"
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 656,385 7,588,702 89.346,193 J
18. NET ELECTRICAL ENERGY GENERATED (MWH) ~627,591 -7,234,947-' 84,985,013
19. UNIT SERVICE FACTOR 100.0 % 99.7 % 68.1 %
20. UNIT AVAILABLE FACTOM 100.0 % 99.7 % 68.1 %
21. UNIT CAPACITY FACTOR (using MDC net) 103.1 % '101.0 % 63.8 %
22. UNIT CAPACITY FACTOR (using DER net) 102.2 % 100.1 % 62.5 %
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 15.3 %
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUEL 10. START 29 FEB.1996. END 15 APRIL 1996.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1

1

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 ,

UNIT FLCRP-3 DATE JANUARY 4,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 l 1

MONTH DECEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) . (MWe-Net) 1 844 17 844-2 844 18 844 3 844 19 843 4 844 20 ~843 5 844- 21 843 6 844 22 843 7 843 23 844 8 844 24 844' 9 844 25 844 10 843 26 , 844 11 , 844 27 '844 12 __ 844 28 '844 1 l

13 844 29 844' 14 845 30 844 15 844 31 844 l 16 844 1

INSTRUCTIONS: I On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

I i

i

UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO. 50-302

  • UNIT FLCRP-3 REPORT MONTH. DECEMBER DATE JANUARY 4,1996 COMPLETED BY T V Dao TELEPHONE (352)795-6486 NO. DATE TYPE (1) DURATION REASON (2) METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT DOWN REACTOR (3) REPORT # RECURRENCE NONE 6

t 1 2 3 4 5 F: FORCED FIEASOtt METHOD EXHEIT G - MSTFtUCTKM4S EXHBIT l- SAME SOURCE S: SCHEDULED A4OUIPMENT FAILUFIE 1-MANUAL FOR PREPARATION OF DATA B-MANTENANCE ORTEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-REFUELING 3-AUTO SCRAM EVENT REPORT (LEFQ FILE D-REGULATORY FIESTRICTION 4-CONTINUED @IUREG-ciel)

E-OPERATOR TRANNG & 6-REDUCED LOAD LICENSE ADM8NtSTRATION MTHER F-ADMMSTRATION G4PERATIONAL ERROR (EXPLAIN)

H-OTHER v

b

~ -- _ _ _ _ _ _ _ _ _ - -- _ - - - - _ _ _ - _ - -

, ,. i j

1

, , , MONTHLY OPERATIONAL

SUMMARY

STATEMENT l DCOTT NO. 50-302 UNIT FLCRP-3 )

DATE JANUARY 4,1996 COMPLETED BY T V Dao TELEPHONE (352) 795-6486 1

MONTH: DECEMBER l

SUMMARY

STATEMENT:

Crystal River Unit # 3 operated at full power for tho month of i December. l l

1 1

l 4

.