Category:INSPECTION REPORT
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint ML20202H7541998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980021998-02-0202 February 1998 Insp Rept 50-461/98-02 on 980105-09.No Violations Noted. Major Areas Inspected:Plant Support Performance & Specifically Evaluation of Effectiveness of RP Program IR 05000461/19970241998-01-0202 January 1998 Insp Rept 50-461/97-24 on 971201-05.No Violations Noted. Major Areas Inspected:Plant Support Activities.Selective Elements of Access Authorization Program,Security Communication Sys & Testing Were Reviewed & Evaluated IR 05000461/19970231997-12-23023 December 1997 Insp Rept 50-461/97-23 on 971103-07.No Violations Noted. Major Areas Inspected:Findings & Conclusions from Insp of Licensed RO & SRO Requalification Training Programs ML20199A3941997-12-22022 December 1997 Insp Rept 50-461/97-22 on 971007-1124.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198L2741997-12-22022 December 1997 Insp Rept for Clinton Power Station on 970923-1003 & 1020-31.Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS IR 05000461/19970151997-11-12012 November 1997 Insp Rept 50-461/97-15 on 970707-0825.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199A8771997-11-12012 November 1997 Insp Rept 50-461/97-19 on 970826-1006.Violations Noted.Major Areas Inspected:Operations,Maint,Engneering & Plant Support IR 05000461/19970141997-10-14014 October 1997 Insp Rept 50-461/97-14 on 970524-0707.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970071997-09-29029 September 1997 Insp Rept 50-461/97-07 on 970313-0522.No Violations Noted. Major Areas Inspected:Licensee Operations & Surveillance Testing IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring ML20151K0191997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure 1999-08-19
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint ML20202H7541998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980021998-02-0202 February 1998 Insp Rept 50-461/98-02 on 980105-09.No Violations Noted. Major Areas Inspected:Plant Support Performance & Specifically Evaluation of Effectiveness of RP Program IR 05000461/19970241998-01-0202 January 1998 Insp Rept 50-461/97-24 on 971201-05.No Violations Noted. Major Areas Inspected:Plant Support Activities.Selective Elements of Access Authorization Program,Security Communication Sys & Testing Were Reviewed & Evaluated IR 05000461/19970231997-12-23023 December 1997 Insp Rept 50-461/97-23 on 971103-07.No Violations Noted. Major Areas Inspected:Findings & Conclusions from Insp of Licensed RO & SRO Requalification Training Programs ML20199A3941997-12-22022 December 1997 Insp Rept 50-461/97-22 on 971007-1124.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198L2741997-12-22022 December 1997 Insp Rept for Clinton Power Station on 970923-1003 & 1020-31.Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS IR 05000461/19970151997-11-12012 November 1997 Insp Rept 50-461/97-15 on 970707-0825.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199A8771997-11-12012 November 1997 Insp Rept 50-461/97-19 on 970826-1006.Violations Noted.Major Areas Inspected:Operations,Maint,Engneering & Plant Support IR 05000461/19970141997-10-14014 October 1997 Insp Rept 50-461/97-14 on 970524-0707.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970071997-09-29029 September 1997 Insp Rept 50-461/97-07 on 970313-0522.No Violations Noted. Major Areas Inspected:Licensee Operations & Surveillance Testing IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring ML20151K0191997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure 1999-08-19
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint ML20202H7541998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980021998-02-0202 February 1998 Insp Rept 50-461/98-02 on 980105-09.No Violations Noted. Major Areas Inspected:Plant Support Performance & Specifically Evaluation of Effectiveness of RP Program IR 05000461/19970241998-01-0202 January 1998 Insp Rept 50-461/97-24 on 971201-05.No Violations Noted. Major Areas Inspected:Plant Support Activities.Selective Elements of Access Authorization Program,Security Communication Sys & Testing Were Reviewed & Evaluated IR 05000461/19970231997-12-23023 December 1997 Insp Rept 50-461/97-23 on 971103-07.No Violations Noted. Major Areas Inspected:Findings & Conclusions from Insp of Licensed RO & SRO Requalification Training Programs ML20199A3941997-12-22022 December 1997 Insp Rept 50-461/97-22 on 971007-1124.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198L2741997-12-22022 December 1997 Insp Rept for Clinton Power Station on 970923-1003 & 1020-31.Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS IR 05000461/19970151997-11-12012 November 1997 Insp Rept 50-461/97-15 on 970707-0825.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199A8771997-11-12012 November 1997 Insp Rept 50-461/97-19 on 970826-1006.Violations Noted.Major Areas Inspected:Operations,Maint,Engneering & Plant Support IR 05000461/19970141997-10-14014 October 1997 Insp Rept 50-461/97-14 on 970524-0707.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970071997-09-29029 September 1997 Insp Rept 50-461/97-07 on 970313-0522.No Violations Noted. Major Areas Inspected:Licensee Operations & Surveillance Testing IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring ML20151K0191997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure 1999-08-19
[Table view] Category:UTILITY
MONTHYEARIR 05000461/19900221990-11-0202 November 1990 Insp Rept 50-461/90-22 on 901015-19.Violation Noted But Not Cited.Major Areas Inspected:Radiation Protection Program During Refueling/Maint Outage ML20058A7541990-10-18018 October 1990 Insp Rept 50-461/90-20 on 900924-28.No Violations Noted. Major Areas Inspected:Chemistry Program,Including Procedures,Organization & Training,Reactor Sys Water QC Programs & QA & QC Programs in Labs IR 05000461/19900151990-08-0303 August 1990 Insp Rept 50-461/90-15 on 900723-27.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise Involving Followup on Licensee Actions on Previously Identified Items IR 05000461/19900111990-07-25025 July 1990 Safety Insp Rept 50-461/90-11 on 900512-0703.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup,Radiological Controls,Maint/Surveillance,Lers,Tmi Items & Meetings IR 05000461/19890281989-10-0404 October 1989 Insp Rept 50-461/89-28 on 890911-15.Violations Noted.Major Areas Inspected:Fire Protection Program,Including Review of Fire Protection Organization,Administrative Controls & Fire Protection Sys Surveillance Test Program IR 05000461/19890251989-08-18018 August 1989 Partially Withheld Physical Security Insp & Allegation Review Rept 50-461/89-25 on 890717-0802 (Ref 10CFR 73.21). Violations Noted.Major Areas Inspected:Security Program Mgt Effectiveness & Review of Allegations IR 05000461/19890241989-08-17017 August 1989 Insp Repts 50-461/89-24 on 890801-04.No Violations Noted. Major Areas Inspected:Radiological Protecction,Radwaste & Transportation Programs Including,Aspects of Licensee Operational Radiation Protection IR 05000461/19890221989-07-27027 July 1989 Insp Rept 50-461/89-22 on 890619-0721.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing Activities Subsequent to Initial Refueling Outage,Areas of Core Performance & Nuclear Engineering IR 05000461/19890181989-07-18018 July 1989 Safety Insp Rept 50-461/89-18 on 890512-0707.Violations Noted.Major Areas Inspected:Previous Insp Findings,Onsite Followup of Written Repts,Allegation Followup,Operational Safety Verification & Monthly Maint Observation IR 05000461/19890211989-07-14014 July 1989 Insp Rept 50-461/89-21 on 890601-23.Violation Noted.Major Areas Inspected:Failure of Reactor Recirculation Pump B Seals & Subsequent Equipment Problems Which Occurred on 890601.Several Weaknesses Identified IR 05000461/19890201989-07-12012 July 1989 Insp Rept 50-461/89-20 on 890627-29.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise & Evaluation of 890601 Emergency Plan Activation IR 05000461/19890191989-06-23023 June 1989 Partially Withheld Safeguards Insp Rept 50-461/89-19 on 890206 & 0522-0607 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Barriers, Access Control - Personnel,Packages & Vehicles & Testing IR 05000461/19890231989-06-21021 June 1989 Enforcement Conference Rept 50-461/89-23 on 890614.Matters Discussed:Apparent Violation of 10CFR50.49,Paragraphs (F) & (G) Re Hydrogen Igniter Field Connections,Instrument Circuits Landed on Terminal Blocks in GE Instrument Racks IR 05000461/19890161989-06-14014 June 1989 Safety Insp Rept 50-461/89-16 on 890227-0303 & 890316-17.No Violations Noted.Major Areas Inspected:Followup on Allegation RIII-87-A-0027,involving Containment Integrity & Inservice Testing Program IR 05000461/19890141989-06-0808 June 1989 Insp Rept 50-461/89-14 on 890316-0530.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Regional Request,Nrc Compliance Bulletin & Generic Ltr Followup & Monthly Maint Observation IR 05000461/19890171989-05-19019 May 1989 Insp Rept 50-461/89-17 on 890403-27.No Violations Noted. Major Areas Inspected:Field Alterations & Plant Mods & Dedication of commercial-grade Equipment for safety-related Applications IR 05000461/19890031989-05-10010 May 1989 Insp Rept 50-461/89-03 on 890123-26,0227-28 & 0313-0407. Violation Noted.Major Areas Inspected:Maint,Support of Maint & Related Mgt Activities IR 05000461/19890121989-04-14014 April 1989 Insp Rept 50-461/89-12 on 890301-03 & 31.No Violations or Deviations Noted.Major Areas Inspected:Verification That SSER6 Required Remote Shutdown Sys Mods Installed Prior to Startup from First Refueling IR 05000461/19890081989-04-0505 April 1989 Insp Rept 50-461/89-08 on 890127-0316.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Followup of Info Notices & Regional Requests,Refueling Activities & Operational Safety Verification IR 05000461/19890131989-04-0404 April 1989 Insp Rept 50-461/89-13 on 890308-21.No Violations Noted. Major Areas Inspected:Allegation & Associated Issue Re Staffing Provisions for Emergency Response Organization at Plant IR 05000461/19890051989-04-0303 April 1989 Insp Rept 50-461/89-05 on 890119-0323.No Violations Noted. Major Areas Inspected:Review of Programs,Procedures, Observation of Work Activities,Data Review,Mod Activities & Licensee Action on Info Notice 88-003 IR 05000461/19890151989-03-28028 March 1989 Enforcement Conference Rept 50-461/89-15 on 890321.Matters Discussed:Apparent Violation Re Inadequate Licensee Action to Correct & Prevent Recurrence of Previously Identified Environ Qualification Deficiencies ML20236D6511989-03-16016 March 1989 Safety Insp Rept 50-461/89-06 on 890206-0303.Violation Noted:Failure to Perform Adquate Corrective Action on Kynar Butt Splices & Junction Boxes.Major Areas Inspected:Lers,Reg Guide 1.97 Commitments & Torque Switches IR 05000461/19890041989-03-10010 March 1989 Insp Rept 50-461/89-04 on 890103-06,10-20 & 0224.No Violations Noted.Major Areas inspected:fitness-for-duty Issue Involving Senior Manager,Including Adherence W/Licensee Procedures in Determining If Employee Fit IR 05000461/19880301989-02-15015 February 1989 Safety Insp Rept 50-461/88-30 on 881206-890127.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Review of Info Notices & Preparation for Refueling & Refueling Activities IR 05000461/19880251988-10-21021 October 1988 Insp Rept 50-461/88-25 on 880926-1014.No Violations or Deviations Noted.Weaknesses Noted Re Training for non-operating Personnel Performing safety-related Activities.Major Areas Inspected:Generic Ltr 83-28 IR 05000461/19880261988-10-19019 October 1988 Insp Rept 50-461/88-26 on 880926-30.Violations Noted. Major Areas Inspected:Radiological Protection & Radwaste Mgt Programs,Including Organization & Mgt Controls,Internal Exposure Controls & Control of Radioactive Matls IR 05000461/19880201988-10-18018 October 1988 Insp Rept 50-461/88-20 on 880727-28 & 1018.Violations Noted. Major Areas Inspected:Followup on Allegation RIII-87-A-0027 IR 05000461/19880241988-10-0606 October 1988 Insp Rept 50-461/88-24 on 880114-16 & 19-20.No Violations Noted.Major Areas Inspected:Chemistry & Environ Radiological Monitoring Programs,Qa Program,Audits & Appraisals & Changes in Organization IR 05000461/19880211988-09-16016 September 1988 Safety Insp Rept 50-461/88-21 on 880810-0906.Violations Noted.Major Areas Inspected:Onsite Followup of Written Repts of Nonroutine Events,Operational Safety Verification,Monthly Maint & Surveillance Observation & Training Effectiveness IR 05000461/19880181988-08-30030 August 1988 Insp Rept 50-461/88-18 on 880707-28 & 0810-17.No Violations Noted.Major Areas Inspected:Allegations Made by Former Employees of Util Contractor,Employed During Const of Plant, Indicating That Certain Requirements of ASME Code Violated IR 05000461/19880171988-08-11011 August 1988 Insp Rept 50-461/88-17 on 880712-15.No Violations Noted. Major Areas Inspected:Radiological Protection Program & Related Allegations,Including Organization,Mgt Controls & Staffing & External Exposure Controls IR 05000461/19880191988-08-11011 August 1988 Partially Withheld Physical Security Insp Rept 50-461/88-19 on 880725-29 (Ref 10CFR73.21).Major Areas Inspected:Mgt Effectiveness Security Organization,Records & Repts,Testing & Maint,Keys & Combination & Safeguards Contingency Plan IR 05000461/19880141988-07-29029 July 1988 Insp Rept 50-461/88-14 on 880518-0706.Violations Noted. Major Areas Inspected:Action on Previous findings,10CFR21 Rept Followup,Info Notice Followup,Compliance Bulletin Followup & Operational Safety Verification IR 05000461/19880081988-06-17017 June 1988 Insp Rept 50-461/88-08 on 880424-28.No Violations, Deficiencies or Deviations Noted.Major Areas Inspected: Emergency Response Facility Appraisal,Reviews of Radioactive Release Assessment & Meteorological Info IR 05000461/19880091988-06-0808 June 1988 Insp Rept 50-461/88-09 on 880404-0518.No Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings & Onsite Followup of Written Repts of Nonroutine Events at Power Reactor Facilities IR 05000461/19880131988-05-31031 May 1988 Insp Rept 50-461/88-13 on 880427-29 & 0511-13.No Violations or Deviations Noted.Major Areas Inspected:To Determine Compliance W/Atws Rule,10CFR50.62,per Temporary Instruction 2500/20 (Module 25020) IR 05000461/19870271988-05-27027 May 1988 Insp Rept 50-461/87-27 on 870810-880429.No Violations or Deviations Noted.Major Areas Inspected:Followup on Allegation RIII-87-A-027 & Licensee Followup Actions to Violations & Unresolved Item Noted in Previous Insps IR 05000461/19880121988-05-18018 May 1988 Insp Rept 50-461/88-12 on 880425-27.No Violations, Deficiencies,Deviations,Exercise Weaknesses or Open Items Noted.Major Areas Inspected:Emergency Preparedness Exercise of Key Functions & Locations During Exercise IR 05000461/19880071988-05-17017 May 1988 Insp Rept 50-461/88-07 on 880321-0415.No Violations or Deviations Noted.Major Areas Inspected:Quality Verification Activities,Qc,Operations Surveillance & Conduct of Control Operations IR 05000461/19880041988-04-28028 April 1988 Insp Rept 50-461/88-04 on 880217-0404.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Nrc Compliance Bulletin Followup,Operational Safety Verification & Training Effectiveness ML20151S9901988-04-21021 April 1988 Partially Withheld Annual Reactive Insp 50-461/88-11 on 880405-08 (Ref 10CFR73.21).Violation Noted.Apparent Noncompliance Noted.Major Areas Inspected:Review of Licensee Reported Security Event on 880404 IR 05000461/19880061988-04-21021 April 1988 Insp Rept 50-461/88-06 on 880314-18,28-31 & 0406.No Violations Noted.Major Areas Inspected:Mod Process & Associated Quality Verification Process & Followup of Previous Inspector Identified Problems IR 05000461/19880021988-04-13013 April 1988 Insp Rept 50-461/88-02 on 880115-0406.No Violations or Deviations Noted.Major Areas Inspected:Actions on Previously Identified Item & Review of Startup Test Results IR 05000461/19880051988-03-31031 March 1988 Safety Insp Rept 50-461/88-05 on 880224-26.No Violations or Deviations Noted.Major Areas Inspected:Solid Radwaste Program Including,Organization & Mgt Controls,Qualifications & Training,Solid Radwaste & Transportation Activities IR 05000461/19880031988-02-26026 February 1988 Safety Insp Rept 50-461/88-03 on 880111-0217.Violation Noted.Major Areas Inspected:Info Notice & Generic Ltr Followup,Onsite Followup of Written Repts of Nonroutine Events at Power Reactor Facilities & Operational Safety IR 05000461/19870391988-01-24024 January 1988 Insp Rept 50-461/87-39 on 871125-880111.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Ie Bulletin Followup,Operational Safety Verification,Monthly Maint & Surveillance Observations IR 05000461/19870401988-01-0505 January 1988 Insp Rept 50-461/87-40 on 871208-09 & 16.No Violations, Deficiencies or Deviations Noted.Major Areas Inspected: Available Facility Space & Layout,Communication & NRC Computer Compatibility IR 05000461/19870351987-12-29029 December 1987 Insp Rept 50-461/87-35 on 871005-1120.Violations Noted.Major Areas Inspected:Qa Program Verification,Maint & Followup of Inspector Identified Problems IR 05000461/19870381987-12-22022 December 1987 Partially Withheld Physical Security Insp Rept 50-461/87-38 on 871130-1204 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Security Plan/Implementing Procedures, Security Organization & Program Audit & Physical Barriers 1990-08-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20217J1361999-09-30030 September 1999 Notice of Violation from Investigation on 971028-980921. Violation Noted:During Jan 1997,QV Dept Discriminated Against Qv Inspector,For Having Engaged in Protected Activities ML20217J1481999-09-30030 September 1999 Notice of Violation from Investigation Conducted from 991028-980921.In Jan 1997,CH Tewksbury Engaged in Deliberate Misconduct That Caused Util to Be in Violation of 10CFR50.7 IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation PNO-III-99-028, on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed1999-05-28028 May 1999 PNO-III-99-028:on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20206G9821999-04-30030 April 1999 Notice of Violation from Insp on 990408-21.Violation Noted:Licensee,Despite Having Considered Issue Closed in Corrective Action Program,Failed to Correct Condition Adverse to Quality IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support ML20204E6931999-03-10010 March 1999 Notice of Violation from Insp on 990208-12.Violtion Noted: Licensee Did Not Make Adequate Surveys to Assure Compliance with 10CFR20.1902(b) Requiring Posting of Each High Radiation Area with Signs Displaying Listed Words IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support PNO-III-99-002, on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump1999-01-0808 January 1999 PNO-III-99-002:on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering ML20155E7131998-10-30030 October 1998 Notice of Violation from Insp on 980819-1001.Violation Noted:On 980909,operator Responding to Alarming Annunciator on Area Radiation Monitoring Sys Did Not Announce Annunciator to Control Room Supervisor IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19983011998-10-0909 October 1998 NRC Operator Licensing Retake Exam Rept 50-461/98-301(OL) Administered to One Applicant Requesting SRO License on 980831-0904.Applicant Passed Operating Retake Exam But Not Issued SRO License to Operate Plant IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20237B1531998-08-11011 August 1998 Notice of Violation from Insp on 980521.Violation Noted:On 980119,individual Exited RCA Utilizing Point Other than Designated Areas W/O Obtaining Approval from Radiological Operations Supervisor IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3071998-07-0707 July 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980213,ERDS Not Initiated within 1 H of Declaration of Alert & Only One Electrical Maint Personnel on Shift Trained & Assigned as Member of Emergency Response Organization ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20237E6641998-06-0505 June 1998 EN-98-044:informs Commission That NRC Intends to Exercise Enforcement Discretion & Not Issue Citation or Propose Civil Penalty for Four Violations of Maint Rule.Ltr Describing Action Will Be Issued on or About 980612 ML20248J8641998-06-0303 June 1998 Notice of Violation from Insp on 980511-15.Violation Noted: Between 980429 & 980513,control Rod Drive Filter Area on 712 Elevation of Turbine Building,Radiation Area W/Radiation Dose of 8 Mrem Per Hour,Was Not Posted W/Warning Sign IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4431998-04-22022 April 1998 Notice of Violation from Insp on 980323-27.Violation Noted: Description of Facility in USAR Not Accurate in All Matl Respects ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19973131998-03-24024 March 1998 NRC Operator Licensing Exam Rept 50-461/97-313OL Conducted on 980126-0205.Exam Results:Exam Was Administered to Two RO & Seven SRO Applicants.Five SRO & Two RO Applicants Passed All Portions of Exam & Two SRO Applicants Failed ML20217D8511998-03-20020 March 1998 EN-98-014:informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.2 of Enforcement Policy & Not Issue NOV to Il Power Co for Several Violations Associated W/Loss of Shutdown Cooling Event on 980213 IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint 1999-09-30
[Table view] |
Inspection Report - Clinton - 1987007 |
---|
|
|
Text
._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ - - _ _ _ _ _ _ - _ - - - _ _ _ _ _ _ _ .
.;
l'
.
..
U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Report'No. 50-461/87007(DRP)
Docket No. 50-461 License No. NPF-55 Licensee: -Illinois Power Company
'500 South 27th Street Decatur,-IL 62525 Facility Name: Clinton Power Station Inspection At: Clinton Site, Clinton, IL Inspection Conducted: January 26 through February 24, 1986 Inspectors: P._L. Hiland T. P. Gwynn R. Paul J. Holmes R F LDU M Approved By: R. C. Knop, Chief os/oJt/77 Projects Section IB D#te '
Inspection Summary Inspection on January 26 through February 24, 1987 (Report No. 50-461/87007(DRP))
Areas Inspected: Routine, unannounced safety inspection by the resident inspectors and region-based inspectors of licensee action on previous-inspection findings; IE Bulletin followup; licensee event report review and followup; monthly maintenance observation; monthly surveillance observation;
-operational safety verification; onsite followup of events at operating reactors; implementation of strike plans; IP management change; and management meetin Results: Of the ten areas inspected, no violations or deviations were identified. A significant unannounced job action occurred late in the inspection period as detailed in paragraph 9 of this repor ~
gRO3060023 s70302 G ADOCK 05000461 PDR;
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I
. . . . _ ._. _ _ . _ - . _ - . -_ . _ . __. _ _ . _ ._-- _ *
.
.
a 4 j DETAILS
,
. Personnel Contacted Illinois Power Company (IP)
,
,
- D.-Antonelli, Nuclear Training Department
- K. Baker, Supervisor - I&E Interface, Licensing and Safety (L&S)
@#*R. Campbell, Manager - QA
- Connell,' Manager - Nuclear Station Engineering Department (NSED)
J. Cook, Assistant Manager -~Clinton Power Station (CPS)
@# G. Edgar, Attorney J. Fertic, Director, Quality Systems & Audits
'
O' R. Freeman, Assistant. Plant Manager, Maintenance-
@ *W. Gerstner, Executive Vice President i @# J. Greene, Manager - NSED
@#*D. Hall, Vice President, Nuclear !
"
E. Kant, Assistant Manager, NSED
- H. Lane, Manager, Scheduling and Outage Management
- J.~ Miller, Assistant Manager - NSED
.
J. Palchak, Supervisor - Plant Support. Services J. Peterson, Supervising Engineer -_ Licensing 0# J. Perry, Manager - Nuclear Progran Coordination 0 R. Schultz, Director - Planning & Programming
.
0 *F..Spangenberg, Manager - L&S i 0 E. Till, Director: Nuclear Training i
- J. Weaver, Director - Licensing J. Wemlinger, Supervisor, Operations Training Of*J. Wilson, Manager - CPS
@ R. Wyatt, Director, Nuclear Program Assessment l Soyland/WIPC0
$
9 *J. Greenwood, Manager Power Supply l ' Nuclear Regulatory Commission - Region III
- B. Davis, Regional Administrator, Region III
!
- Z. Falevitz, DRS, Region III l # E. Greenman, DRP, Assistant Director l- # P. Gwynn, Senior Resident Inspector, Clinton
- @#*P. Hiland, Resident Inspector, Clinton
@# R. Knop, Chief, Projects Section 1B
'
.
9 *M. McCormick-Barger, Project Inspector, RIII
- C. Paperiello, Division Director, DRS i
@# R. Warnick, Chief, Projects Branch 1 L
- Denotes those attending the monthly exit meetir.g on February 24, 1987.
i
' # Denotes those attending the management meeting on January 30, 198 @ Denotes those attending the management meeting on February 13, 1987.
t L 2
.
3 # ~ c -- ..-e--------,,-,m -,., - - ,- .- -, . , - - - - -w-, ,. ,,,,*,w-,--~-,%- ,-.v--r- m.-.,,-,--- w,,.we,.--%*.-- ----w,,-we
-
,
.
The inspector also contacted and interviewed other licensee and contractor personne . Licensee Action On Previous Inspection Findings (92701)(92702) (Closed) Open Item (461/86024-02): Shielding of plant piping feeding the Associated Technologies Incorporated (ATI) Radwaste Solidification System. An ALARA review of the installed radwaste feed system to the ATI solidification system indicated a need for additional radiation shieldin During this report period, the inspector was informed that Plant Modification A-39 had been completed. The inspector performed a walkdown of the shield walls installed at the radwaste feed station to the ATI solidification system. For the walkdown performed, the inspector referenced the design drawings contained in Engineering Change Notice (ECN) No. 7495, dated August 8,1986. The inspector verified by direct field observation that the shield walls installed at the subject radwaste feed station were in accordance with the design drawing This item is close (Closed) Open Item (461/86028-13(PSS)): The licensee was requested to verify the maximum depth of frost and if necessary take corrective actions if neede The information provided to the inspector indicated that the licensee is committed to the 1973 edition of NFPA 24, Standard for Outside Protection, Article 9101 which states, "The depth of cover over water pipes should be determined by the maximum depth of frost penetration in the locality where the pipe is laid." The licensee referenced 1971 edition of " Foundation Engineering" which indicated depth of frost at 32 inche The licensee indicated that the depth of cover provided is generally 42 inches based on a maximum depth of frost of 32. The licensee also stated in attachment 1 of an interoffice memorandum dated January 5, 1987 from R. S. Frantz to K. A. Baker that "The design basis of 42 inch depth of cover is consistent with the practices of a local municipality and a local water company. The local municipality and water company recomend a minimum depth of cover of 3 1/2 feet for fire protection lines (standing water)." As indicated in.the licensee's response package dated December 5, 1986, the licensee performed an evaluation based on design drawings, permanent road, grading, and drainage plan drawings which identified 3 areas of nonconformance with Clinton Power Station 42 inch designed depth of cover criteri Further investigation by Illinois Power Company, including a survey of the entire underground fire
main grade elevations performed by an outside survey contractor, identified an additional thirteen areas of nonconformanc The licensee states in the response package " Plant Modification FP-53 and FP-53 Supplement 1 and 2 provides the corrective actions
L
.
necessary to ensure that a minimum of 42 inches of cover is provided over the fire mains. This has been accomplished through the addition of soil cover above the fire mains, the rerouting of a portion of fire main (0FP02D14) and the capping and abandonment of fire line (0FP36C12)."
The licensee's response package provided to the inspector included several engineering change notices, field engineering change notices, maintenance work requests and fire line ground surface profile report. No items of noncompliance were observe The licensee indicated that NFPA 24 does not provide specific requirements with regards to catch basins, underground vaults and manholes in the vicinity of the underground fire main and that NFPA will provide a formal interpretation concerning the intent of the code with regards to the CPS configuration Based on the licensee's response and corrective actions, this item is considered closed, (Closed) Open Item (461/86050-01(FRPS)): Results of certain preoperational tests of Offgas (0G) System. An inspector reviewed selected test results of OG Startup Phase and Preoperational tests PTP-0G-02, PTP-V0-01, and XTP-00-12. The tests appeared to meet the stated objectives and acceptance criteria. The 0G system is essentially technical specification operable. This item is close (Closed) Open' Item (461/86054-02): Electrical penetrations. An inspection performed prior to fuel load identified a number of discrepancies with containment electrical penetration This item was previously reviewed in Inspection Report 50-461/86060, paragraph 2.k. That inspection documented the initial corrective action taken by the licensee and concluded that the licensee's
'
milestone for completion of all corrective actions by initial criticality was reasonable. During this report period, the licensee presented additional information on actions taken to identify and correct all deficiencies on electrical penetrations.
ll l
'
The licensee performed an inspection of all 49 electrical penetra-tions to identify and document discrepancies. The discrepancies '
- identified included the following:
!
l -
Loose / missing enclosure covers
-
Loose / broken ground cables
-
Sleeves between the inboard and outboard nozzles in the
! secondary gas boundary.
-
Sil Temp cloth wrapped around the feed through conductors in the secondary gas boundary.
l
.
I
. .. . . . _ _ _ _ . _ _ - . ~ - . _ . _ . . . . _ , . .
__ , -
( ,
.
.
-
Breather caps and drain ope' ,
Penetrations were not pressurized with alarms functional.-
'
-
A number of maintenance work requests (MWRs) and nonconforming material reports (NCMRs) were initiated to correct the above identified discrepancies. Completion.of those work activities
.were reviewed by the inspector with the following result '
-
Enclosure covers were installed prior to fuel load (reference Inspection Report 50-461/86060, paragraph 2.k.).
'
-
All loose / broken ground cables were identified on NCMRs and subsequently repaired in accordance with MWRs C-33561 and C-2009 The galvanized sheet metal sleeves between the inboard and outboard nozzles in the secondary gas boundary were dispositioned on NCMR 1-2545 as Use As Is. The engineering evaluation concluded the sleeves have no affect on the function of the electrical penetrations or on the seismic desig The Sil Temp cloth was removed from the feed through conductors in the secondary gas boundary in accordance with MWR C-1175 Breather caps and drains were opened in accordance with MWR C-3160. Several caps were broken or missing; however the licensee's engineerir.g evaluation concluded this woul,d not impact the operation of the electrical penetration *
-
All electrical penetrations were pressurized with nitrogen in accordance with MWR C-31437. The electrical. penetrations do not have an alarm function for low nitrogen pressure. The nitrogen pressure was to be monitored or, the PMS computer to assure greater than-4 psi is maintaine The inspector's review of the above work documents and direct field observation indicated that the licensee had adequately addressed the electrical penetration discrepancies. This item is closed, (Closed) Violation (461/86065-05): Eight examples of failure to follow procedures during the conduct of initial fuel load operation This violation was previously inspected as documented in Inspection Report 50-461/87002, paragraph 2.n. The licensee initially responded to this violation in letter U-600806 dated January 6, 1987. At the request of Region III, the licensee provided additional information concerning the corrective actions taken for each of the eight examples cited in letter U-600823 dated January 21, 198 The licensee's supplemented response to the i
violation appeared adequate to address the substance of the i violation i l
i
- 5
i
, . . - - .. - ., --.._,,-,__,.m__..m -,. _ ,- _ ,_,,_ ___, - - m-,,,__ _-__~ _. ,_..._.. , _ , . , .
.. . _ _ ~ _ . _ _ _ . _ _ _
o
.'
The licensee provided an IP QA letter No. Q-05181 dated February 10, 1987, which documented verification of completion of the corrective measures indicated in their response to the Notice of Violation, attachment B. This information, in conjunction with information, observations, and results of personnel interviews briefly discussed in the previous inspection report, provided a substantive basis for closure of this violatio (Closed) Violation (461/86065-07): Four examples of failure to meet plant technical specification As documented in Inspection Report 50-461/87002, paragraph 2., this item remained open pendin the licensee's response. gDuring completion this report of theperiod, inspector's review of the inspector i reviewed the licensee's response provided in letter U-600806 dated January 6, 198 The first three examples of failure to meet technical specifications (86065-07A,B,&C) were related to Licensee Event Report (LER)
86-009-01. That LER was reviewed by the inspector in Inspection Reports 50-461/86072(paragraph 6.b.),50-461/86073(paragraph 3.b.),
and 50-461/87002 (paragraph 5.a.). The major contributor (reference Violation 461/86065-04B) to that event was an inadequate surveill-ance procedure that was being performed while core alterations were in progres For the first three examples, the licensee's corrective action was to suspend core alterations following their identification that the plant technical specifications were violated. Suspension of core
. alterations placed the plant in compliance with technical specifications.
'
,
The licensee's corrective action to prevent recurrence of this violation (86065-07A,B,&C) included a critique of the event, along with lessons learned held with each operating shift. The inspector reviewed the critique of LER 86-009 presented to the operating crews and concluded that it adequately discussed the details of the event as described in LER 86-009-01. The inspector confirmed through review of training records that each operating shift had been briefed on the events resulting in the technical specification
- violations. In addition, the inspector confirmed during routine
!
inspections in the control room that plant operators were knowledge-able of the particular technical specification requirement The fourth example (86065-070) of failure to meet technical specifications occurred when the licensee changed operatin While in mode 5, the licensee commenced core alterationsspecified (g modes.
- condition #) with only one train of the Standby Gas Treatment (VG)
system operable. The plant technical specifications did not allow
.
'
entry into specified condition # with reliance on the ACTION requirement i
- _ . _ _ _ _ _ _
_ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _
a
.
The licensee's corrective action to prevent recurrence was to brief each operating. shift on this event and specific counseling was provided to the shift-supervisor on duty at the time of the even The inspector noted through interviews of plant operators at the time of this event that there was some confusion as to whether-entering core alterations (specified condition #) was a mode chang Subsequent to the licensee's corrective action, the inspector confirmed through interviews of licensed operators that a clear understanding of what constitutes a " mode change" or "specified condition" was provided in the licensee's briefing Based on the inspector's review of training records and interviews of licensed operators, the inspector concluded that the licensee had effectively implemented the corrective action as stated in the response to this violation. This item is close (Closed) Violation (461/86074-05): Failure to follow approved procedures for control of temporary modifications. As documented in Inspection Report 50-461/87002, paragraph 2., the licensee responded to this violation in letter U-600819 dated January 20, 1987. At the time of that inspection this item remained open pending completion of corrective actions taken by the licensee. During this report period, the inspector reviewed the completed corrective action During a NRC inspection conducted in December 1986, a number of deficiencies in the administrative control of temporary modifi-cations were identified. These deficiencies included a failure to perform a required monthly audit; a failure to receive prior approval of the power plant manager for temporary modifications installed beyond their approved removal date; and a failure to perform the required review and approval by the Facility Review Group (FRG) within the allotted tim The licensee performed an audit of the active temporary modifica-tions on December 5, 1986, in response to the deficiencies identified by the inspector. The results of that audit confirmed the above deficiencies. The licensee's immediate corrective action was to document the noted deficiencies on Condition Reports (CRs)
1-86-12-061, 1-86-12-077, and 1-86-12-07 The corrective action to prevent recurrence of this violation, as stated in the licensee's response to the Notice of Violation, was to revise the Administrative Procedure for Temporary Modification CPS No. 1014.03, to clarify requirements for periodic reviews of temporary modifications. The inspector reviewed revision 9 of CPS No. 1014.03 dated December 31, 1986, and noted that the revised procedure directs the plant staff Compliance Department to conduct weekly reviews of outstanding temporary modifications to assure the administrative requirements were adhered to. The inspector noted through review of training records that personnel responsible for control of temporary modifications in accordance with CPS No. 1014.03 had been traine &
e
.
The inspector performed a review of the Temporary Modifications
-
index maintained in the main control room to verify the licensee's corrective actions. The inspector noted for the 50 temporary modifications outstanding at the time of this review the extension dates had received prior approval of the power plant manager; the FRG reviews and approvals were performed within the allotted time; and the required audits for January and February 1987 were performed. Based on the inspector's review of the administrative controls in place for temporary modification, the licensee's corrective actions appeared to have been effective in response to this violation. This item is close No violations or deviations were identifie . IE Bulletin Followup (92703)(25583.)
The bulletins listed below were reviewed and closed in previous inspection reports. The review conducted verified that the written response was within the time period stated in the bulletin; that the written response included the information required to be reported; and that the written response included adequate corrective action commitments based on information presented in the bulletin and the licensee's response. For the purpose of these reviews, the inspector utilized the guidelines contained in Inspection and Enforcement (IE)
Temporary Instruction 2515/8 (Closed) IE Bulletin (461/86001-88): Minimum Flow Logic Problems That Could Disable RHR Pump The inspector's initial review of this bulletin was documented in Inspection Report 50-461/86037, paragraph 3. At the time of that inspection, the bulletin remained open pending issuance of a NRC Temporary Instruction for inspection of this bulletin. The inspector reviewed and closed this bulletin as documented in Inspection Report 50-461/86065, paragraph 5. The bulletin was determined to be not applicable to Clinton Power Station because independent logic systems were provided. This bulletin is closed, (Closed) IE Bulletin (461/86003-88): Potential Failure of Multiple ECCS Pumps Due to Single Failure of Air-operated Valve in Minimum Flow Recirculation Lin The inspector's review and closure of this bulletin was documented in Inspection Report 50-461/87002, paragraph 4. The bulletin was determined to be not applicable to the Clinton Power Station because the ECCS minimum flow bypass capability did not have the single failure vulnerability identified in the bulleti This bulletin is close No violations or deviations were identifie _
e 4. Licensee Event Report (LER) Review and Followup (90712 & 92700) In-Office Review Of Written Reports Of Nonroutine Events At Power Reactor Facilities (90712)
For the LERs listed below, the inspector performed an in-office review of each LER to determine that reporting requirements had been met; that the corrective action discussed appeared appropriate; that the information provided satisfied the applicable reporting requirements; to determine if appropriate actions had been taken on any generic issues present; and to determine if any additional NRC inspection, notification, or other response was appropriate. Where determined appropriate, the LER was scheduled for onsite followup inspection or other necessary action by cognizant NRC personne (1) (Closed)LER 86-017-00, 86-017-01, 86-017-02, and 86017-03 (461/86017-LL) [ ENS No. 06670): Engineered Safety Feature Actuation Due to Spiking on Intermediate Range Monitor The licensee identified the cause of this event to be mechanical vibrations of the IRM detectors induced by movement of adjacent control rods. Subsequent to the root cause determination, the licensee replaced IRM detectors on channels A and The inspector noted, as discussed below in paragraph 5, the licensee replaced IRM detectors on channels B and F for similar reasons during this report period. This LER is close (2) (Closed) LER 86-019-00 and 86-019-01 (461/86019-LL): [ ENS Nos 06856 and 07000]: Engineered Safety Feature Actuation Due to a Spurious High Output Alarm on the Main Control Room Air Intake Process Radiation Monito The licensee identified the cause of this event to be electrical connection and grounding problems at the detector-interface box mounted in a location exposed to the outside environment. A plant modification (AR-26) added a positive ground to the detector-interface box and an environmental seal was provide The licensee plans to revise the process radiation monitor trip logic from the current one-out-of-four to a one-out-of-two takentwicelogic(PlantModificationPR-20). This LER is close (3) (Closed) LER 86-024-00 (461/86024-LL) [ ENS No. 07152]:
Automatic Closure of Group I Containment Isolation Valves 821-F016 and B21-F019 Due to Personnel Erro The licensee identified the cause of this event was an inadequate review by maintenance planners and engineering personnel when preparing the impact matrix for a maintenance I work request. A group I isolation signal was generated due to a low condenser vacuum when the turbine stop valves actuated their open limit switches during testing. Generic corrective action for this type of personnel error was being addressed by the licensee in LER 86-021-00. This LER is close _ _ _ _ _ .
t e
.
(4) (0 pen) LER 87-001-00 (461/87001-LL) [ ENS No. 07359]: Automatic Initiation of Division II ECCS Due to Spurious Reactor Vessel Water Level Signal The licensee is planning to provide a supplemental report on this event. This matter will be reviewed further with the supplemental repor No violations or deviations were identified, Onsite Followup Of Written Reports Of Nonroutine Events At Power Reactor Facilities (92700)
For the LER listed below, the inspector performed an onsite followup inspection of the LER to determine whether response to the event was adequate and met regulatory requirements, license conditions, and commitments and to determine whether the licensee had taken corrective actions as stated in the LE (Closed)LER 86-022-00and86-022-01(461/86022-LL)[ENSNo.07060]:
Inadvertent Withdrawal of Control Rod Due to Utility Operator Erro The licensee identified the cause for this event to be personnel error when a reactor operator unknowingly pushed the rod withdraw pushbutton. This action resulted in control rod 24-21 moving one notch from the "00" position to the "02" positio The inspector verified by direct field observation that a guard was in place over the rod withdraw switch with the instructions as stated in the licensee's report. The additional corrective action to revise the Clinton Power Station procedure governing inadvertent rod movement (CPS No. 4007.02) was not yet implemented at the conclusion of this report period. However, the licensee had a CCT item 044103 to assure the procedure was revised. This LER is close No violations or deviations were identifie . Monthly Maintenance Observation (62703)
Station maintenance activities of safety related systems and components listed below were observed / reviewed to ascertain that they were conducted in accordance with approved procedures, regulatory guides and industry codes or standards and in conformance with technical specification The following items were considered during this review: limiting conditions for operation were met while components or systems were removed from service; approvals were obtained prior to initiating the
, work; activities were accomplished using approved procedures and were inspected as applicable; quality control records were maintained; activities were accomplished by qualified personnel; parts and materials used were properly certified; radiological controls were implemented; and fire prevention controls were implemente &
.
.
The inspector observed maintenance activities being performed in accordance with Maintenance Work Request (MWR) C-49479. This MWR provided instructions for replacement of Intermediate Range Monitor (IRM) detectors B and F at core locations 14-11 and 30-35 respectivel The inspector noted that the maintenance procedure in use at the job site "IRM Detector String Removal and Replacement", CPS No. 8818.01, revision 8, dated October 7, 1986, was the current revision and was
properly identified as an Official Working Copy. The inspector verified through review of the MWR package in the field that required QC hold points were adhered to; the pre-installation resistance and voltage checks met the acceptance criteria; the post-installation resistance and voltage checks met the acceptance criteria; and the acceptance criteria for the drive tube pressure checks was met. The inspector verified test equipment in use was within the calibration due date The inspector noted that personnel performing this maintenance activity were knowledgeable of the maintenance procedure and were qualified to perform the task. Since the reactor plant had not yet achieved initial criticality, the radiological controls in place at the work sta'. ion were less than what would be anticipated after reactor operation. Howeve l the inspector noted that personnel were in compliance with plant procedures for entry into the Radiological Control Area (RCA).
No violations or deviations were identifie . Monthly Surveillance Observation (61726)
Station surveillance activities of safety related systems and components listed below were observed / reviewed to ascertain they were conducted in accordance with technical specification (TS) requirements.
i The following items were considered during this review: limiting conditions for plant operations were met while components or systems were removed from service; approvals were obtained prior to start of the surveillance; test instrumentation was calibrated; the system was properly restored to service; the test documentation was reviewed and discrepancies were rectified; the test results met TS requirements; the testing was done by qualified personnel; and the surveillance schedule
was met and conformed with TS requirement ! The inspector observed performance of a monthly channel functional test j
!
'
required by Clinton Power Station Technical Specification table 4.3.3.1-1, item D.2 (4.16 KV Emergency Bus Undervoltage). Surveillance Procedure CPS No. 9333.01, " Division I 4.16 KV Bus Undervoltage Relay Calibration", section 8.4, provided the necessary instructions to conduct this surveillance. The inspector noted that surveillance personnel ( obtained approval from the shift supervisor prior to performance of the t
test; the shift supervisor adhered to plant technical specification by returning division III ECCS to an operable state (HPCS had been temporarily removed from service to allow cleaning in the suppression pool) before authorizing this surveillance to start; and the surveillance procedure (CPS No. 9333.01, revision 21) in use at the job site was the l
i
l
- - . - - - -- .- ._- _ _ -
.
l current revision. The inspector verified that the test equipment in use was within its calibration due date; and the system was returned to service in accordance with the restoration steps contained in the surveillance procedure. The inspector noted that personnel performing this surveillance were qualified based on test observation and questionin The surveillance observed identified no discrepancies. The inspector reviewed vaulted test results of this surveillance activity for the last five monthly tests and noted that discrepancies that had been identified in the past were corrected in accordance with the licensee's approved progra No violations or deviations were identifie . Operational Safety Verification (71707)
The inspector observed control room operations, attended selected pre-shift briefings, reviewed applicable logs, and conducted discussions with control room operators during the inspection period. The inspectors verified the operability of selected emergency systems and verified tracking of LCOs. Routine tours of the auxiliary, fuel, containment, control, diesel generator and turbine buildings and the screenhouse were conducted to observe plant equipment conditions including potential for fire hazards, fluid leaks, and operating conditions (i.e., vibration, process parameters, operating temperatures, etc). The inspector verified that maintenance requests had been initiated for discrepant conditions observed. The inspector verified by direct observation and discussion with plant personnel that security procedures and radiation protection (RP) controls were being properly implemente During the report period, the inspector observed the actions taken by the licensee to upgrade performance of personnel responsible for plant operations. The steps taken by the licensee are detailed below in paragraph 10. The inspector noted through interviews and direct observation that operation's personnel responded favorably to the licensee's initiatives. The inspector noted an increased attention to detail in maintaining the Control Room Operator log with particular attention to system operations and technical specification requirement The inspector accompanied the Assistant Power Plant Manager on a tour of
'
the Containment Dry Well prior to its final closeout in preparation to enter mode 2 operation. In addition, the inspector observed general plant housekeeping / cleanliness conditions. No discrepancies were noted.
,
No violations or deviations were identifie . Onsite Followup of Events at Operating Reactors (93702)
, General i
'
The inspector performed onsite followup activities for events which occurred during the inspection period. Followup inspection J
!
l
- -- -- - --. - - - . - - - _ _ , --- . , _ - - . - - - , - - - - _ - - - - . -
_ ________________ ________ _ _
o
.
included one or more of the following: reviews of operating logs; procedures; condition reports; direct observation of licensee actions; and interviews of licensee personnel. For each event, the inspector reviewed one or more of the following: the sequence of actions; the functioning of safety systems required by plant conditions; licensee actions to verify consistency with plant procedures and license conditions; and attempted to verify the nature of the event. Additionally, in some cases, the inspector verified that licensee investigation had identified root causes of equipment malfunctions and/or personnel errors and were taking or had taken appropriate corrective actions. Details of the events and licenseo corrective actions noted during the inspector's followup are provided in paragraph b. belo b. Details (1) Engineered Safety Feature (ESF) Actuation - Shift of High Pressure Core Spray Suction (ENS No. 07424)
The inspectors review of this event was initially documented in Inspection Report 50-461/87002, paragraph 10.b.(3). Subsequent to that report, the licensee determined that the High Pressure Core Spray (HPCS) suction shift from its preferred source (RCIC storage tank) to the suppression pool was not reportable under 10 CFR 50.7 The inspector reviewed IP memorandum Y-204135, dated February 4, 1987, which documented the licensee's basis for determining this event was not reportable under 10 CFR 50.7 Since the apparent cause for the HPCS suction valve shift to the suppression pool was due to a specific transmitter failure; the HPCS " system" was not actuated nor did the suction valve shift prevent the HPCS system from performing its ESF function; and the HPCS suction valve shift to the suppression pool did not violate the plant technical specifications, the inspector concluded that the licensee's determination not to report this event under 10 CFR 50.73 was reasonabl The inspector noted that the licensee had reported a similar event in LER 50-461/86020-00. At the time that this LER was reported, the licensee suspected the root cause for the HPCS suction valve shift to be rust particulate found inside the transmitter. Final determination by the licensee as to the root cause for the HPCS suction valve shift on November 11, 1986(LER86020-00), and the root cause for the HPCS suction valve shift on January 9,1987, is considered an open item pending the inspector's review of the licensee's investigation (461/87007-01).
__
__ - __ __ _-____ _ __ __ __ -_
1 .
l ?, , l
,
,
(2) Inadvertent ESF Actuation During Alternate Rod Insertion Surveillance Test (ENS No. 07468) ,
.
'- The inspector's review of this event was initially documented-in Inspection Report 50-461/87002, paragraph 10.b.(4).
L Subsequent to that report, the licensee determined that this
~
event was not reportable under 10 CFR 50.7 The inspector reviewed IP memorandum Y-204135, dated February 4,~1987, which documented the licensee's basis for
, determining this event was not reportable under 10 CFR 50.73.
i The subject event concerned the closure of scram discharge
'
volume (SDV) vent and drain valves during a routine surveillance of the nonsafety related Alternate Rod Insertion
(ARI) system. Due to a procedural deficiency, personnel
performing the ARI surveillance did not reset a seal-in logic prior to returning a test switch at the ARI cabinets to norma This resulted in closure of the SOV vent and drain valves; i
'
however, a control room operator immediately. identified the
' cause for the ARI actuation and reset the seal-in logic. This action returned the ARI valves to their original positio l opened the SDV vent and drain valves, and prevented the scram i
,
valves from openin '
1 . .
- Since the scram discharge volume vent and drain valves are not
,
'
defined as an ESF in the licensee's Final Safety Analysis -
Report and the Reactor Protection System (scram valves) did '
not actuate, the inspector concluded that the licensee's determination that this was not a reportable event under
,
10 CFR 50.73 was reasonable. No additional information from i
! -the licensee concerning this event was requested.
I (3) Loss of Emergency Response Facility (ENS No. 07472)
t
!
The inspector's review of this event was initially reported in I
- Inspection Report 50-461/87002, paragraph 10.b.(5). This event l or was (b)(1)rep (v)ted whenby thethe licensee licensee in accordance experienced a losswith 10 CFR of power 50.72 to the Emergency Offsite Facility (EOF) for two hours on January 14, 1987. Since 10 CFR 73 does not require the licensee to submit i a LER for this event (reference NUREG 1022, supplement 1), no additional information from the licensee concerning this event ;
was requested.
'
(4) Desraded Emercency Response Capability Due to Snow (EP5 No. 07520)
!
The inspector's in Inspection review Report of this event 50-461/87002, was initially paragraph 10.b. 6).(documented This l
j event was reported by the licensee in accordance with i i 10 CFR 50.72 (b)(1)(iii) when a local snowstorm hampered l
. personnel access to the Clinton Power Station for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and '
,
14 i i
l-
- - .. -- - - - - . - - _ . . - _ _ - _ -
-
!
.
.
20 minutes on January 19, 1987. The inspector discussed with the licensee their determination that this event was not reportable under 10 CFR 50.73. Based on the inspector's review of NUREG-1022 Supplement No. 1, question 5.2, the licensee's determination not to report this event under 10 CFR 50.73 was reasonable. No additional information from the licensee concerning this event was requeste (5) ESF Actuation - Closure of Shutdown Cooling Suction Valve (ENS No. 07565)
The inspector's in Inspection review Report of this event 50-461/87002, was initially paragraph 10.b. 9).(documented Subsequent to that report, the licensee determined that this event was not reportable under 10 CFR 50.7 The inspector reviewed IP memorandum Y-204135, dated February 4,1987, which documented the licensee's basis for determining this event was not reportable under 10 CFR 50.7 The subject event concerned the unexpected closure of the inboard Residual Heat Removal (RHR) suction valve 1E12-F009 during restoration of the RHR system following an operational pressure test of the reactor coolant system. During performance of the pressure test, valve 1E12-F009 had been opened and its associated motor operator controller was deenergized to prevent the valve from closing when reactor coolant system pressure was raised above a close signal interlock. This lineup was to allow the operational pressure test to include that portion of the RHR system designed to see reactor pressure. Following performance of the pressure test, the system pressure was reduced to ambient and the motor controller for valve 1E12-F009 was reenergized. However, the close signal interlock was sealed in and valve 1E12-F009 actuated close The interlock that actuated the close signal was intended to prevent operation of the RHR system in the Shutdown Cooling Mode at elevated pressures. The Low Pressure Coolant Injection (LPCI) mode of the RHR system was not actuated nor did closure of valve 1E12-F009 prevent the LPCI mode from operating. The inspector concluded that the licensee's determination not to report this event under 10 CFR 50.73 was reasonabl However, the inspector noted a contributor to this event was the unannunciated seal-in logic that was present when control power to valve 1E12-F009 was restored. A similar seal-in trip logic was the subject of LER No. 86-004-00 which remains open pending additional information from the licensee. The inspector requested the licensee to evaluate the unannunciated seal-in logic which resulted in valve 1E12-F009 closure as it relates to LER No. 86-004-00. This will remain an open item pending the inspector's review of the licensee's evaluation (461/87007-02).
t-
.
e (6) Safety Relief Valve (SRV) Failure (ENS No. 07628)
At about 10:30 p.m. CST on January 29, 1987, the licensee was performing an operational pressure test of the reactor coolant system. At the same time, C&I technicians were troubleshooting a failure in a SRV logic circuit. During troubleshooting a
fuse was replaced and the SRV opened causing loop pressure to drop from 1060 psi to atmospheric (primary loop was solid and approximately 150 degrees F). A reactor water cleanup isolation also occurred during the event due to differential flo ; Air was bled off the SRV to slowly close the valve rather
than risk seat damage by operating the valve electrically.
<
Subsequent licensee review indicated a second failure in the SRV logic circuitr (7) ESF Actuation - Due to Shift of Control Room Ventilation (ENS No. 07744)
At about 1:10 a.m. CST on February 12, 1987, the licensee experienced an ESF actuation when the Control Room Ventilation (VC) system shifted to the chlorine mode. The VC shift to the chlorine mode occurred when an auxiliary operator attempted to troubleshoot a failed indicating light at a local chlorine detection pane During performance of a routine surveillance (each shift), the operator noted the flow indicating light at
,
the local panel was extinguished but actual flow was still indicated by the local flow meter. The operator attempted to determine if the flow indicating light " bulb" had failed by removing the indicating light bulb for the optics circuit and I
placing it in the flow indication socket. When this light bulb was removed, it interrupted the optics circuit (i.e. the indication light bulb and optics light were in series) and caused the VC system to shift to the chlorine mode. The plant operators reset the VC train to its normal mode at about 1:30 a.m. CST. The licensee notified the NRC Operations Center of this event at about 3:30 a.m. CST on February 12, 198 (8) ESF ACTU? TION - Due to Containment Isolation Valve Closure (ENS No. 07757)
At about 8:40 a.m. CST on February 13, 1987, the licensee identified that a containment isolation valve (Main Steam Line drain valve 1821-F016) had actuated close At the time of this event, the reactor plant was in mode 4 and the Main Steam Line drain valves were open to provide a vent path to the main condenser. The immediate cause of the valve closure was unknown; however, when the licensee attempted to reopen the drain valve a trip seal-in was still presen .
'
_ . . __
_ _ . _ _ _ _ _-_ _ . _ _ . _ _ _ _ . _ _ _ - . _ . _ _ - -
__ ___ _ _-
t
.
The licensee completed troubleshooting and determined the cause of the isolation was a failed logic circuit card (NS4-2) in the Nuclear Steam Supply Shutoff System (NS4).
The failed logic card generated a single trip signal when the (Clinton unique) Self Test System pulsed onto the division 3 logic. Since the card failure was downstream of the sensing circuits, no division 3 annunciator was alarmed. When a routine surveillance generated a second trip signal in the division 2 logic, the 2 out of 4 coincident circuit was satisfied and the containment isolation valve actuated closed. The licensee replaced the failed logic card and restored the system to servic The licensee notified the NRC Operations Center of this event at 11:56 a.m. CST on February 13, 198 (9) ESF Actuation - Due to Automatic Shift of Control Room Ventilation (ENS No. 07799 and 07802)
At about 8:50 a.m. and again at 12:30 p.m. CST on February 18, 1987, the licensee experienced ESF actuations when the control room ventilation (VC) system shifted to its chlorine mod The first event occurred during the conduct of a routine surveillance when an operator attempted to verify proper operation of a chlorine detector paper tape. When the operator placed the local panel switch in the unload position, VC train B shifted to the chlorine mode. Placing the local panel switch in the unload position was a routine operation and the subsequent shift to the chlorine mode was unexpected. The licensee restored the VC system to its normal lineup at about 9:30 a.m. while investigating the cause for the first actuation. At about 12:30 p.m. the second shift of VC train B to its chlorine mode occurred. The' licensee determined the trip signal was generated by the same local panel that caused the first actuation. The licensee had taken the local chlorine detector panel out of service while continuing to troubleshoot the root cause of these actuations. The reactor plant was in mode 4 at the time of these events. The licensee notified the NRC Operations Center of these events at 11:49 a.m. and 2:52 p.m. CST on February 18, 198 No violations or deviations were identifie . Implementation of Strike Plans (92710)
On February 23, 1987, the licensee informed the inspector that 12 of 15 operators (licensed and nonlicensed) had failed to report to work for the first shift. The licensee stated that all 12 individuals had telephoned in sick. The licensee's attempts to call in either offshift personnel or personnel scheduled for second shift were unsuccessfu The inspector confirmed by direct observation that the licensee was meeting technical specification shift manning requirements with supervisory licensed operators, and nonlicensed operators that had been
t
.
e scheduled for training. The inspector confirmed the licensee had established a contingency plan that met technical specifications manning requirements in the event additional personnel failed to report to work on subsequent shift The inspector noted that the normal compliment of shift operators reported to work on subsequent shift No violations or deviation were identifie . Management Meeting (30702) On January 30, 1987, NRC management met with IP management at the Region III Office in Glen Ellyn, IL to discuss NRC concerns related to plant operations in mode 4, tenninating the Project Control Center (PCC), and configuration control of electrical panels. Key personnel attending this meeting are identified by (#) in paragraph 1 of this repor (1) NRC concerns related to the conduct of plant operations in mode 4 resulted from the sequence of events that led up to an inadvertent actuation of Division I Emergency Core Cooling (ECCS) systems on January 21, 1987. The failure of plant operators to use administrative controls to operate the Reactor Recirculation system under abnormal conditions and the failure to document required surveillances prior to starting Reactor Recirculating Pumps was the subject of this concern. This event was discussed in inspection report 50-461/87002, Paragraph 10.b(7).
The licensee presented their evaluation of the sequence of events that led up to the Division I ECCS actuation on January 21, 1987. Following that presentation, the licensee discussed the lessons learned and the corrective actions planned in response to their review. Corrective actions planned included the following:
(a) A Plant Manager's Standing Order was initiated to provide guidance on overriding interlock (b) The need for procedural compliance and use of existing administrative controls when operating systems in an abnormal mode was to be stressed to p'. ant operator (c) The need to enhance log keeping practices was to be stressed to plant operator (d) Increased management presence on shif (2) NRC concerns related to the termination of the Project Control l
Center (PCC) was the potential increased work load placed on
'
the operating shift crews.
l I
1 L
_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
?
o e
The licensee explained their reasons for terminating the PCC was due to the decreased construction, testing, and maintenance activities as the plant approaches the operational phase. The licensee had a Shift Outage Manager, Assistant Plant Manager -
Operations, and Assistant Plant Manager - Maintenance that were effectively supporting the operating shift crew In addition, the licensee stated their improved scheduling and reduced scope of work justified the termination of the PC (3) NRC concerns related to the configuration control of electrical panels resulted from recent NRC inspection findings that identified discrepancies in drawings versus as-built configura-tion, posting of design change documents, and design drawing accurac The licensee presented preliminary results of a walkdown inspection performed on 46 class IE electrical panels. The licensee discussed the types of discrepancies identified and the significance of each type. The licensee agreed to parform a more detailed analysis of these discrepancies and present their conclusions and corrective action plan to the NR NRC management met again with IP management on February 11, 1987, to discuss the licensee's actions regarding this subjec The results of that meeting are documented in Inspection Report 50-461/8700 On February 13, 1987, NRC management met with IP management at the Clinton Power Station to discuss the status of the facility, the licensee's Monthly Performance Monitoring Management Report and actions being taken to enhance the licensee's performance in several areas. Personnel attending the meeting are identified by (0) in paragraph 1 of this repor The licensee discussed the status of preparations for initial criticality noting the remaining surveillance tests and maintenance items; the licensee identified that all deferred test activities for initial criticality were complete; and the licensee discussed the plant operator's readiness to commence initial criticalit The licensee then provided the status of testing deferred beyond initial criticality; the status of their maintenance / modernization program plan during power ascension; and the schedule for power ascensio The licensee discussed the status of actions being taken to address recent NRC concerns related to the configuration control of electrical panels. The licensee provided an overview of their plan to inspect 92 class 1E electrical panels. The licensee stated that the inspection procedures had been prepared and personnel performing the inspections were trained. The licensee stated that this inspection effort would commence on February 14, 198 t
,
e The licensee discussed actions being taken to improve performance of plant operators. As stated by the licensee, these actions included, management monitoring of special evolutions, INP0 monitoring of -
control room activities, ongoing operations monitoring, plant manager briefings, sirwlator training, and enhanced critiques of event NRC (Region III) management acknowledged the licensee's status and plans. The meeting ciencluded with a tentative agreement to meet again on March 13, 1987, at the Clinton Site with a similar agend . IP Management Change (71707)
On February 16, 1987, the licensee announced that the IP Manager -
Nuclear Planning and Support (NP&S) was taking a lateral transfer to replace the Manager - Nuclear Station Engineering (NSED). The fonner Manager - NSED had resigned to accept employment with another compan The licensee was not planning to fill the vacated position of Manager - '
NP&S at the conclusion of this report period. Those responsibilities formerly carried out by the Manager - NPAS will be performed by two directors within the NP&S departmen . Open Items Open items are matters which have been discussed with the licensee, which will be reviewed further by the inspector, and which will involve some action on the part of the NRC or 'icensee or both. Two oper. Items disclosed during the irspection were discussed in paragrarh ,
13. Exit Meetings (30703)
The inspector met with licensee representativee. (denoted in paragraph 1)
throughout the inspection and at the conclusion of the inspection on February 24, 1987. The inspector summarized the scope and findirgs of the inspection activities. The licensee acknowledged the inspection finding The inspectors also discur. sed the likely informational content of' ;he inspection report with regard to documents or processes reviewed by the inspectors during the inspection. The licensee did not identify any such documents / processes as proprietar The resident inspector attended exit meetings held between Region III based inspectors and the licensee as follows:
Inspector (s) Date DuPont 01/29/87 Gardner 02/10/87 Falevi ts OP/1N87 Falevits 02/20/87 20