IR 05000461/1989025

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp & Allegation Review Rept 50-461/89-25 on 890717-0802 (Ref 10CFR 73.21). Violations Noted.Major Areas Inspected:Security Program Mgt Effectiveness & Review of Allegations
ML20246D276
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/18/1989
From: Creed J, Pirtle G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20246D272 List:
References
50-461-89-25, NUDOCS 8908250310
Download: ML20246D276 (2)


Text

. _ _ , _ _ - ..

-

  • '

s

.

'

, *

,g

'U.. NUCLEAR REGULATORY COMMISSION J

REGION III

Report No.'50-461/89025(DRSS)

Docket-No; 50-461' License No. NPF-62 Licenseei Illinois PowerL Company 500 South 27th Street

.Decatur, IL 62525 Facility'Name: Clinton Power. Station, Clinton Illinois

. Inspection At: Clinton Power Station

>

Inspection. Conducted: July 17-28,1989 Onsit . August 2,.1989.in NRC Region III Office vType of-Inspection: Announced Physical Security Inspection and Allegation Review

~

Date of Previous Security inspection: May 22-June 7, 1989 Inspector: 1 .T hd k o_ 8/13/93 G. L-J Pirtle Dat Physical Security Inspector-Approved By:he k,1 , o- 3/g a /83 TJamesR. Creed,-Chief Date Safeguards Section Inspection Summary Inspection between July 17.and August 2,1989 (Report No. 50-461/89025(DRSS))

Areas Inspected: Included Security Program Management Effectiveness; General

"

Requirements of the Security Force Training and Qualification Program; and Review of Allegation 'Results: The licensee was in compliance with NRC requirements in the areas inspected, except as noted below:

Compensatory Measures: Compensatory measures for a vital area barrier were-ineffective.because the security officer at the barrier was found to be inattentive when checked by a superviso The Security Force Training and Qualification Program was adequate. However, some lesson plans and job analysis worksheets required. revision to meet L criteria contained within the S.ecurity Force Training and Qualification Plan Attachment Contains Upon Separation This g S2 g Q h081]g1 oogp Page is Decontrolled Y .=_ _: _ . _ -

___ _ _ _ . . . _ .

..-

.

  • ,~

,

_,

' (SFT&Q?) . The Security Force Personnel Screening Program was being adequately administered, but. screening case files required more attention to detail in some cases to assure all required. documentation was within the case file and properly completed. More formal planning for security force staffing was considered appropriate and security management prepared a detailed action plan to address security force staffin Five security-related allegations were reviewed. As a result of the review, a

- violation was cited for ineffective compensatory measures-at a vital area barrie (Details - UNCLASSIFIED )

Attachment Contains Upon Separation This 2 Page is Decontrolled

,

_ - _ _ _ _ _ _ _ _ _ _ - ..