'U..S.
NUCLEAR REGULATORY COMMISSION
REGION III
J Report No.'50-461/89025(DRSS)
Docket-No; 50-461'
License No. NPF-62 Licenseei Illinois PowerL Company 500 South 27th Street
.Decatur, IL 62525 Facility'Name: Clinton Power. Station, Clinton Illinois
. Inspection At: Clinton Power Station
>
Inspection. Conducted: July 17-28,1989 Onsite.
. August 2,.1989.in NRC Region III Office vType of-Inspection: Announced Physical Security Inspection and Allegation Review Date of Previous Security inspection: May 22-June 7, 1989
~
Inspector:
1.T hd k o_
8/13/93 G. L-J Pirtle Date.
Physical Security Inspector-Approved By:he k,1,
o -
3/g a /83 TJamesR. Creed,-Chief Date Safeguards Section Inspection Summary Inspection between July 17.and August 2,1989 (Report No. 50-461/89025(DRSS))
- Areas Inspected:
Included Security Program Management Effectiveness; General Requirements of the Security Force Training and Qualification Program; and
"
Review of Allegations.
'Results: The licensee was in compliance with NRC requirements in the areas inspected, except as noted below:
Compensatory Measures:
Compensatory measures for a vital area barrier were-ineffective.because the security officer at the barrier was found to be inattentive when checked by a supervisor.
The Security Force Training and Qualification Program was adequate. However, some lesson plans and job analysis worksheets required. revision to meet L
criteria contained within the S.ecurity Force Training and Qualification Plan Attachment Contains Upon Separation This g S2 g Q h081]g1 oogp Page is Decontrolled Y
. = _
_:
_. _ -
___
_ _ _... _.
.. -
- ,~
.
,
_,
' (SFT&Q?). The Security Force Personnel Screening Program was being adequately administered, but. screening case files required more attention to detail in some cases to assure all required. documentation was within the case file and properly completed. More formal planning for security force staffing was considered appropriate and security management prepared a detailed action plan to address security force staffing.
Five security-related allegations were reviewed. As a result of the review, a
- violation was cited for ineffective compensatory measures-at a vital area barrier.
(Details - UNCLASSIFIED )
Attachment Contains Upon Separation This