Monthly Operating Rept for May 1986
ML20214K051
Person / Time
Site: Beaver Valley
Issue date: 05/31/1986
From: Boyle R, Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8608150301
Download: ML20214K051 (5)


Text

L -

7.7 4

NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE MAY 1986 May 1 The Station was in Operational Mode 1 with reactor through power coastdown in effect prior to beginning a May 14 refueling outage. The Reactor Coolant System was at normal operating pressure and temperature.

May 15 A power reduction to 35 percent began at through 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> on the 15th to increase steamline May 16 pressure to facilitate Main Steam Safety Valve Tes ting . The Station was taken off-line at 2312 hours0.0268 days <br />0.642 hours <br />0.00382 weeks <br />8.79716e-4 months <br /> on the 16th'in preparation for Reactor Shutdown for the Fifth Refueling.

May 17 The Station was in Operational Mode 2 with reactor through shutdown in progress. A high-source range May 18 trip occurred at 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> on the 17th. After the reactor trip, the Station entered Mode 3.

With cooldown in progress the Station entered Mode 4 at 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on the 17th. The Station entered Mode 5 at 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br /> on the 18th.

4 May 19 The Station was in Operational Mode 5 in preparation through for refueling.

May 29 May 30 The Station entered Operational Mode 6 at 0555 through hours on the 30th with Reactor Coolant Pressure at May 31 atmospheric and temperature at 112* F.

l l

l l

f 1

( 8608150301 860531 4 PDR ADOCK 0500 l "

i Ig$

llt

4 .

OPERATING DATA REPORT DOCKET NO.- 50-334 REPORT DATt;: 06/05/86 COMPLETED BY: R.N. BOYLE TELEPHONE: (412) 643-1825 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD: MAY 1986
3. LICENSED THERMAL POWER (MWt): 2660
4. NAMEPIATE RATING (Gross MWe): 923
5. DESIGU ELECTRICAL RATING (Net MWe): 835
6. MAX DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe); None
10. REASONS FOR RESTRICTIONS. IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 744.0 3623.0 88391.0
12. NO. OF HRS. REACTOR WAS CRITICAL: 384.5 3220.1 48821.1
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
14. HOURS GENERATOR WAS ON LINE: 383.2 3217.5 47352.3
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 825172.4 8049760.4 111073191.5
17. GROSS ELECT. ENERGY GEN. (MWH): 274430.0 2638550.0 35419950.0 l

' 18. NET ELECTRICAL ENERGY GEN. (MWH): 253950.0 2486140.0 33012443.0

19. UNIT SERVICE FACTOR: (PERCENT) 51.5 88.8 56.1
20. UNIT AVAIIABILITY FACTOR:(PERCENT) 51.5 88.8 56.1
21. UNIT CAPACITY FACTOR (MDC): PCT 42.1 84.7 49.7
22. UNIT CAPACITY FACTOR (DER): PCT 40.9 82.2 48.2
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 1.4 22.6
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTilS (TYPE,DATE,AND DURATION OF ZACH):

Fifth Refueline. May 16. 1986. Scheduled 93 Days

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 8-17-86
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

l FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

I l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-314 UNIT NAME BVPS UHIL Il DATE June 5, 1986 REPORT MONIH MAY COh.'LETs!D sy R. N. Boyle TELErilONE ( a l ?) 6at1R75

'l an

  • 60 o a **

0, e 08t Licensee ,, "$* Cause & Corrective tio . Date ". %E e 3UE Event 0. EE Action to y j5 ".

j,} neport #

"[=3 ja Provent Recurrence a

6 860515 F 0 B 5 N/A CC VALVEX Power reduction to increase steamline pressure for Main Steam Valve testing.

7 860517 S 360.8 C 2 N/A ZZ ZZZZZZ Shutdown for Fifth Refueling 1

1 2 F: F.used 3 4 Reasim: Hethod: 1:mlubst G Insisussiivis S Seh afeil A. Equipment failuse(I.mplaint t-Manurit fos Psepasa8 ion al Da J B Maintenance e.i Test 2-Manual scram I sels) Shee85 l'a I hen 5cc C Refueling 3-Automatic Scres Fsent Hepius ti l Hll eic lNilHI G D-Regsdaten) Resnicti4Hs 4. Continued FTOm Frew!OuS NOnth tiltil l l O scsains i isainseg A 1.isense l'xasussoasios 5-Reduction I Adnsanisisalive 9-Other 5 ,

G Opes.assussal l esos il aplassel I sinius ! Sainc N iie.c l'8/771 11 Othes il spl.susi 8

AVERAGE DAJL UNIT POWER LEVEL  ;

DOCKET NO.80-331 3'OS 'J.1:: ;'l UNIT DATE June 5, 1986 COMPLETED SY R. N. Bovie TELEPHONE (412) 643-1825 MAY 1986 MONTH DAY AVERAGE DAILY POWER LEVEL DAY- AVERAGE DAILY POWER LEVEL (MWe-NetI (MWe-Neti '

738 0

,7 742 2 la 0 733 0 3 19 4 733

- 2g 0

$ 721 0 21 6

712 0 22 721 0 7 ~ n 700 ,

0 a

9 696 25 0 688 0 10 24 683 0 11 p 12 679 0 28 13 679 0 29 675 0 14 30 558 0 15 3, 16 235 ,

INSTRUCTIONS On this format.!ist the ac age d:ily unit power lese!in MWe. Net for each day in the reportine munrh. Compute to the nearest whole megawatt.

1 1

(4/77) J 1

2- 3 4

'Af Telephone (412; 393-6000 N."o*.Yo'x l #

""""" " June 11, 1986 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director, Of fice of Management Information & Program Control Washington, D. C. 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of May,1986.

Very truly yours, (KL b(.

l J. J. Carey i Vice President Nuclear Group rw Enclosures cc: NRC Regional Office King of Prussia, PA v