ML20214P367

From kanterella
Revision as of 00:20, 19 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Contentions on Rev 2 of State of Nh State & Local Radiological Emergency Response Plans.Intervenor Will Submit Filing That Will Complete Contentions on Rev 2 as Soon as Possible
ML20214P367
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 11/26/1986
From: Curran D
HARMON & WEISS, NEW ENGLAND COALITION ON NUCLEAR POLLUTION
To: Harbour J, Hoyt H, Luebke E
Atomic Safety and Licensing Board Panel
Shared Package
ML20214P369 List:
References
CON-#486-1712 OL, NUDOCS 8612040173
Download: ML20214P367 (1)


Text

, - <  :- =n FLCD. & UTIL FAC..

i _44; 4gx

.~..w m m. =-

HARMON & WEISS DCLKEILI l

2001 S STREET.N.W. U9jPC SUITE 430 GAaL McGREEVY HARMON PHONE-E..LvN R. wet S S (2O2)328-3500 01 AN" CU R A AN I oNEA c?rEasTER WW2n M,hgfM;g,7 . ,f;c7 BR Ah, u Helen F. Hoyt, Es q .

Dr. Emmeth A. Luebke Dr. Jerry Harbour Administrative Judges Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C. 20555 S UBJ ECT: Seabrook operating license case:

offsite emergency planning issues

Dear Administrative Judges:

I am enclosing copies of NECNP CONTENTIONS ON REVISION 2 QF THE THE NEW HAMPSHIRE STATE AND LOCAL RADIOLOGICAIs EMERGENCY RESPONSE PLANS. Copies have been served on the parties to this proceeding.

Because of the time constraints imposed by the Board's schedule, NECNP was not able to complete the preparation of its contentions on Revision 2. The Board now has before it a motion by the Coalition for reconsideration of the filing dedline and an extension of the deadline until January 2, 1986. NECNP intends to submit as soon as possible a filing that will complete its contentions on Revision 2.

Sincerely, Diane Curran cc: service list 8612040173 861126 PDR ADOCK 05000443 G PDR t

b ]