ML20207S784

From kanterella
Revision as of 21:37, 11 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Preliminary Review of 870301 Changes to Fundamental Nuclear Matl Control Plan Reveals Measures Taken Not Consistent w/10CFR70.32(c)
ML20207S784
Person / Time
Site: Westinghouse
Issue date: 03/17/1987
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Lock E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 8703200268
Download: ML20207S784 (1)


Text

-

a MAR 171987 Westinghouse Electric: Corporation ATTN: .Mr.-E..P. Loch, Manager-Columbia Plant Commercial Nuclear Fuel Division Drawer R Columbia, SC 29250

-Gentlemen:

SUBJECT:

DOCKET NO. 70-1151 Our preliminary review of the ' change to your Fundamental Nuclear riaterial Control Plan, submitted by your letter of ' March 1,1987, revealed .that the measures you 'have taken are not consistent with the provisions of

'10 CFR 70.32(c). Accordingly, since this change involves a matter which was the subject of a discussion between your staff and the NRC Office of Nuclear Materials Safety and Safeguards (NMSS), we have forwarded your letter to NMSS-

'for action.

S'ncerely, J. Philip Stohr, Director Division of Radiation Safety and Safeguards bec: NMSS' Docket Room, 70-1151, 396-SS Document Control Desk (RG02), 42-P Chief, Safeguards Material Licensing and International Activities Branch, 881-SS

[ Chief, Safeguards and Materials l Program Branch, 305-EWS Region II Licensing File, (22VM),

(70-1151), TAB-B State of South Carolina G. Troup, Project Inspector i

[.

l RII RII I EMcATpine GT a WCline 5 03/17/87 03/6 /87 03 87 p i 8703200268 870317 '

PDR ADOCK 07001151 C PDR _