ML20196K570
| ML20196K570 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 06/03/1999 |
| From: | Robert Williams WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | Gaskins C NRC |
| Shared Package | |
| ML20196K432 | List: |
| References | |
| NUDOCS 9907090075 | |
| Download: ML20196K570 (2) | |
Text
_. _ _ - _ _ _ _ _ _ _
- Williams, Robert A.
From:
Williams, Robert A.
Sent:
Thursday, June 03,1999 9:42 AM To:
'cegi@NRC. gov' Cc:
Goodwin, Wilbur L.
Subject:
INTENT TO CHANGE LICENSE ANNEX Please see attached Westinghouse intent to change the License Annex for the Columbia Plant Ventilation System:
W'
-uv2,,
I 4
l 9907090075 990623
{
PDR ADOCK 07001151 B
PDR l
Page 1
INTENT TO CHANGE LICENSE ANNEX i
On June 2,1999, Westinghouse Columbia Fuel Fabrication Facility (CFFF) Regulatory Management approved a project that will require a change to the License Annex submitted in support of the Plant Ventilation System Integrated Safety Assessment (TAC NO. L31180).
)
)
Project Description Remove moisture knockout pots, associated solenoid operated drain valves, drain lines, and air-operated damper valves in the 6-inch diameter duct vent lines of pellet grinder ventilation lines 1,2,3,4, and 5. Replace knockout pots with "Y"-type transition duct sections, and replace existing grinder hoods to facilitate 6-inch diameter ducting with 3-inch-by-12-inch hood exhaust openings (including creep restrictors).
Regulatory Review Project approved for startep and operation (by Manager, Regulatory Affairs).
l 1
Necessary changed pages to the License Annex for the Plant Ventilation System will be l
submitted on or before July 2,1999 for docketing.
Robert A. Williams Licensing Project Manager Westinghouse CFFF 1
i