ML20196B042
| ML20196B042 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 11/23/1998 |
| From: | Gaskin C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Robert Williams WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| References | |
| TAC-L31095, TAC-L31096, TAC-L31097, TAC-L31104, TAC-L31110, NUDOCS 9811300231 | |
| Download: ML20196B042 (3) | |
Text
.
m m ~
r70 -/IS/
p CE k
UNITED STATES 5
j NUCLEAR REGULATORY COMMISSION
% gg +;t WASHINGTON, D.C. 20066-0001 November 23, 1998 i
Mr. Robert A. Williams Safeguards Coordinator Columbia Fuel Fabrication Facility Westinghouse Electric Company Drawer R Columbia, South Carolina 29250
SUBJECT:
ACKNOWLEDGMENT OF RECEIPT OF LICENSE ANNEX SUBMITTALS
Dear Mr. Williams:
We have received License Annex submittals for several operating systems at your plant. The following is a list of those submittals we have received, the dates of the documents, and their assigned TAC Numbers:
License Annex Document Date TAC Numbers IFBA Fuel Rod Gystem 7/31/98 L31095
=
ADU Fuel Rod System 7/31/98 L31096 ADU Conversion 7/31/98 L31097 UN Bulk Storage System 8/17/98 L31104 Cylinder Washing 8/31/98 L31110 Please reference the associated TAC Numbers in any future correspondence associated with these submittals. This acknowledgment letter also closes out TAC Number L31079, which is replaced by the submittal associated with TAC Number L31104.
We have completed the initial review of these License Annexes with no administrative omissions or deficiencies identified. Please note that the complete technical review of the License Annexes will be primarily associated with the high-risk systems (ADU Conversion, UN Bulk Storage System, URRS Dissolver, and Powder Blending). Accordingly, we will review the l
ADU Conversion and UN Bulk Storage System Annexes first, and the remainder of the high-risk systems when you submit them. We anticipate completing our review of the ADU Conversion and UN Bulk Storage System by May 30,1999. In addition, our reviews may identify omissions f,,
in the submittal information or technical issues that require additional information.
i When we have received the other two high-risk system License Annex submittals, we will provide you with our projection of the technical review schedule. Our review schedule could
. change depending on the findings of our technical review, urgent assignments, or other factors.
g We will promptly communicate any significant changes to this schedule.
\\
l
~"9 l
9811300231 981123 f7 r ' - i, n ' " "_-
[~
~
_a-.
1 !J. Y$
PDR ADOCK 07001151; C
PDRL I
l A
l Mr. Robert A. Williams 2
in addition, copies of your submittals have been forwarded to the License Fee and Accounts Receivable Branch, Office of the Chief Financial Officer, who will contact you separately for billing, since these reviews are subject to full cost fee recovery.
If you have any questions, I can be reached on (301) 415-8116 or E-mail at ceg1 @nrc. gov.
Sincerely, Original signed by HFelsher for:
Charles E. Gaskin, Project Manager Licensing Section 1 Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1151 License SNM-1107 cc: Mr. W. L Goodwin Manager Regulatory Affairs Columbia Fuel Fabrication Facility Westinghouse Electric Company Drawer R Columbia, South Carolina 29250 Distribution: (Control No. 880S, 890S, 900S, 910S, 920S) [ PARTIAL) & (Control No. 840S) (CLOSED)
Docket 70-1151 PUBLIC NRC File Center NMSS r/f FCSS r/f FCLB r/f Region ll DAyers, Rll HAstwood PMDA
[g:\\wecisa11.ack)
- See Previous Concurrence OFC FCLB C
FCLB C
FCLB 2E FCLB
- d.,
MAdamhh NAME CGaskin
- HFelsher
- PShea
- DATE 11/13/98 11/13/98 11/16/98 11/23 /98 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY i
l
l I
i
,f '
Mr. Robert A. Williams 2
i in addition, copies of your submittals have been forwarded to the License Fee and Accounts Receivable Branch, Office of the Chief Financial Officer, who will contact you separately for billing, since these reviews are subject to full cost fee recovery.
t if you have any questions, I can be reached on (301) 415-8116 or E-mail at ceg1 @nrc. gov.
Sincerely, Charles E. Gaskin, Project Manager '
Licensing Section 1 Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS I
Docket 70-1151 License SNM-1107 cc: Mr. W. L. Goodwin Manager Regulatory Affairs f
Columbia Fuel Fabrication Facility l
Westinghouse Electric Company l
Drawer R Columbia, South Carolina 29250'
}
l i
c
[
I t
l;,
i l
[
t r
_ - - -