ML20154P459

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 70-1151/88-06 on 880425-28.No Violations or Deviations Noted
ML20154P459
Person / Time
Site: Westinghouse
Issue date: 05/20/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Loch E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20154P464 List:
References
NUDOCS 8806030341
Download: ML20154P459 (2)


Text

. _ - _ _ _ _ _ _ _ _ -

gpaa_a a M 2 01gn Docket No. 70-1151 License No. SNM-7107 Wystinghouse Electric Corporation

@TTN: Mr. E. P. Loch, Manager Columbia Plant Commercial Nuclear Fuel Division Drawer R Columbia, SC 29250 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT N0. 70-1151/88-06 This refers to the Nuclear Regulatory Coninission (NRC) inspection conducted by S. Adamovitz on April 25-28, 1988. The inspection included a review of activities authorized for your Westinghouse facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of-activities in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and any reply will be placed in the NRC Public Document Room. If you wish to withhold information contained therein, please notify this office by telephone within ten days of the date of this letter and promptly thereafter submit a written application to withhold information contained therein. Such ,

application must be consistent with the requirement of 10 CFR 2.790(b)(1). If we do not hear from you in this regard within the period specified above, this ,

letter, its enclosures, and any reply will be made available to the public and be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, j

\ 51 Douglas M. Collins, Chief Emergency Preparedness and

. Radiological Protection Branch hb0 DOCK O 51 Division of Radiation Safety C DCD and Safeguards Enclosura: l NRC Inspection Report j bec: (See page 2) sNl 25 4 f

. HM' 2 0198g Westinghouse Electric Corporation 2 bcp w/o enc 1:

tL4 cense Fee Management Branch DRS Technical Assistant bec w/ encl:

Document Control Desk State of South Carolina l

l R11 R1 R11 R11

( ')l/[(

SA abovitz:es J e T G@r6up NW EMcAlpine 5/ (V88 5[q/88 5/19/88 5/li/88