Forwards Insp Rept 50-458/98-01 on 980210-13.No Violations Noted.Insp Included Implementation of Emergency Plan & Procedures During Biennal Emergency Preparedness Exercise. One Exercise Weakness Identified
ML20203L879
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/04/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
Shared Package
ML20203L882 List:
References
50-458-98-01, 50-458-98-1, NUDOCS 9803060282
Download: ML20203L879 (3)


See also: IR 05000458/1998001

Text

_ - - _ _ - _ _ _ _ _ - _ _ _ _ _

=

g>* M Gg

f \, UNITED STATES

{'sc p, NUCLEAR REGULATORY COMMISSION

Ei ;j REGloN IV

0, S 611 RYAN PLAZA DRIVE suite 400

D

%, ' % ,o ARLINGTON TEXA5 760118064

          • March 4, 1998

John R. McGaha, Vice President - Operations '

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisvitie, Louisiana 70775

SUBJECT: NRC INSPECTION REPORT 50-458/98-01 ,

Dear Mr. McGaha:

From February 10 to 13,1998, an announced, emergency preparedness inspection wws

conducted at your River Bend Station reactor facility. The enciesed report presents the scope

and results of that inspection.

The inspection included implementation of your emergency plan and procedures during your

biennial smergency preparedness exercise. Overall, performance during the bierinial exercise

was generally very good; however, one exercise weakness was identified. The exercise

weakness involved the operations support center's failure to promptly and properly dispatch

inplant repair teams.

Exercise weaknesses, according to 10 CFR Part 50, - i.iV.F.2.g, are inspection

findings that need to be corrected by the licensee. Tturwoit.. you are requested to provide this

offica with a description of your corrective measures and your schedule for completing these

f. actions within 30 days after receipt of this letter.

In addition to the exercise weakness, an unresolved item was identified conceming whether

Regulatory Guide 8.13 trainin0 (protection of the embryo / fetus) was conducted in cecordance

with the Updated Safety Analysis Report. This matter is discussed in Section P5 of the enclosed

report. The item is unresolved pending determination of whether the Regulatory Guide 8.13

subject matter was covered as part of other required training.

In accordance with 10 CFR 2.790 of tha NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Should you have any questions conceming this inspection, we will be pleased to discuss them

with you.

Sincerely,

hyhfY l

Blaine Murray, Chief

Plant Support Branch \

ador Safey

9803060282 980304

PDR ADOCK 05000458

0 PDR

lf! k k!! !!,!

, .

  • ,

Entergy Operations, Inc. -3-

The Honorable Richard P. leyoub

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, Louisiana 70804-9005

H Anne Plottinger

3456 Villa Rose Drive

Baton Rouge, Louisiana 70806

President of West Feliciana

Police Jury .

P.O. Box 1921

St. Francisville, Louisiana 70775

William H. Spell, Administrator

Louisiana Radiation Protection Division

P.O. Box 82135

<'

Baton Rouge, Louidana 70884 2135

'

Training, Exercises, a Evaluation

Branch Chief-

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, Texas 76201-3698

i

m __

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . - __

  • .

Entergy Operations, Inc. -4-

E-Mail report to T. Frye (TJF)

E Mail repori to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (lE35)

bec distrib. by RIV:

Regional Administrator Senior Resident inspector (Grand Gulf)

DRS Director DRS Deputy Directory

DRP Director DRS-PSB

Branch Chief (DRP/C) MIS System

Project Engineer (DRP/C) RIV File

Branch Chief (DRP/TSS) Resident inspector

Action item File - Goines (Al #98-G-4()

!

DOCUMENT NAME: R:\._RB\RB801RP.GMG

To voceive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:SEPA\PSB E RE\03 E, RS\PSB E RS\PSB C:09BC

GMGood:nh (gV M2MurphfW THAndrews-tw MCHay acf- ECdlIfi'nf

umuu I

C:DRS\PSEL

BMy rray "(J'

OltM98 s

OFFICIAL RECORD COPY

,

-__.

.

-.

.

..

Entergy Operations, Inc. -4-

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE35)

bec distrib. by RIV:

Regional Administrator Senior Resident inspector (Grand Gulf)

DRS Director DRS Deputy Directory

DRP Director DRS-PSB

Branch Chief (DRP/C) MIS System

Project Engineer (DRP/C) RIV File

Branch Chief (DRP/TSS) Rerident inspector

Action item File - Goines (Al #98-G-40

I

3

.

r.

l- (

DOCUMENT NAME: R:\_RB\RB801RP.GMG

To receive copy of document. Ind:cate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No ety

RIV:SEPA\PSB E RE\OB E, RS\PSB E RS\PSB C:DEC l _

GMGood:nh (onV MEMurphy)44*/ THAndrews-rw MCHay ad EC61f&

mass  !!I  :====

C:DRS\PSBs

BMy rray (

J'f~'

'

QRM98

~

OFFICIAL RECORD COPY