Partially Withheld Physical Security Insp Rept 50-409/88-09 on 881021-26 & 1101 (Ref 10CFR2.790(d).Major Areas Insp: Implementation of Newly Approved Physical Security Plan for SNM Possession Only Site
ML20206J504
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/16/1988
From: Creed J, Funk D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20206J496 List:
References
50-409-88-09, 50-409-88-9, NUDOCS 8811290008
Download: ML20206J504 (1)


Text

-- . - - _ ~- .

. ,

. . :~ . .

U.S. NUC' JAR REGULATORY COMMISSION j REGION III ,

.

Report No. 50-409/88009(ORSS)

Docket No. 50-409 License No. DPR-45 Licensee: Dairyland Power Cooperative .

2615 East Avenue - South t Lacrosse, WI 54601  !

!

Facility Name: Lacrosse Boiling Water Reactor (LAC 8WR)  !

Inspection At: LACBWR Site, Genoa, Wisconsin [

Inspection Conducted: October 24-26, 1988 Onsite ',

October 21 and November 1, 1988, In-Office Review NRC Region III Type of Inspection: Announced Physical Security Inspection ,

Dates of Previous Security Inspection: September 8-16, 1987 Inspector:

r k/bh 0/ F.. Funk, J Date

////0[88 '

7 fhysical Security Inspector  :

Approved By: th II[/k[88 James R. Creed, Chief Date S4feguards Section Inspection Summary Inspection on October 21-26 and November 1, 1988 (Report No. 50-409/88009(ORSS))

Areas Inspected: The licensee's implementation of the newly approved physical security plan for a Special Nuclear Material "possession - only" site was  ;

reviewed. Specific inspection included Licensee's Action on Previous  ;

Inspection Findings; Management Support, Security Program Plans, and Audits;  ;

Protected Area Physical Barriers, Detection and Assessment Aids; Protected i Area Access Control of Personnel and Packages; Alarm Stations and Communications; Power Supply; Testing, Maintenance and Compensatory Measures; j and Security Training and Qualificatio Rv_sul ts : Two previous inspection findings and one security event report were ,

closed (No. 409/84017-01; 409/86015-01 and LER 87-S10). Certain commitments  !

in the new security plan required clarification. The implementation of the nLw physical security plan is adequat l n i Details: (10 CFR 2.790(d) INFORMATION) Enclosure Contains 10 CFR 2.790 INFORMATION l Upon Separation This l gg[tq@8@@$$bo g? Page is Decontrolled o ,  ;