NRC Inspection Report No. 05000409/2022001(DRSS)
ML22356A186
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/27/2022
From: Dave Hills, Pamela Lee
NRC/RGN-III/DRSS/DRIHP
To: Sauger J
EnergySolutions
References
IR 2022001
Download: ML22356A186 (1)


Text

December 27, 2022

SUBJECT:

LA CROSSE BOILING WATER REACTOR - NRC INSPECTION REPORT NO. 05000409/2022001(DRSS)

Dear Mr. Sauger:

On December 8, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the La Crosse Boiling Water Reactor (LACBWR) in Genoa, Wisconsin.

The purpose of the inspection was to determine whether the decommissioning facility was maintained safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with Mr. S. Zoller of your staff on December 8, 2022.

The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection included problem identification and resolution; decommissioning performance and status review; occupational radiation exposure; radioactive waste treatment, and effluent and environmental monitoring; waste management and transportation; and final status surveys. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.

Based on the results of this inspection, the NRC did not identify any violations.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding. We will gladly discuss any questions you have concerning this inspection. If you have anyquestions, please contact Dr. Peter Lee of my staff at 630-829-9870.

Sincerely, Signed by Hills, David on 12/27/22 David E. Hills, Chief Decommissioning, Reactor, and Independent Spent Fuel Storage Installation Health Physics Branch Division of Radiological Safety and Security Docket No. 50-409 License No. DPR-45 Enclosure:

IR No. 05000409/2022001(DRSS)

cc w/encl: Distribution via LISTSERV