IR 05000409/1986004
| ML20198D098 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 05/15/1986 |
| From: | Christoffer G, Creed J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML20198D088 | List: |
| References | |
| 50-409-86-04, 50-409-86-4, NUDOCS 8605230136 | |
| Download: ML20198D098 (1) | |
Text
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
.
Report No. 50-409/86004(DRSS)
,
Docket No. 50-409 License No. DPR-45 Licensee: Dairyland Power Cooperative 2615 East Avenue - South La Crosse, WI 54601 Facility Name:
La Crosse Boiling Water Reactor (LACBWR)
Inspection At:
LACBWR Site, Genoa, WI Inspection Conducted: March 24-28, 1986 Date of Last Physical Protection Inspection:
September 30 through October 4, 1985 Type of Inspection: Unannounced Physical Security Inspection Inspector:
h
,
G. M. Christoffer l' F Date
'
Physical Security Inspector Approved By:
/
l
. R. Creed, Chief Date Safeguards Section Inspection Summary Inspection on March 24-28, 1986 (Report No. 50-409/86004(DRSS))
Areas Inspected:
Included a review of the licensee's action on Previous Inspection Findings; Allegation Followup; Information Notice 85-79; Security Program Audit; Physical Barriers-Protected Areas; Security System Power Supply; Lighting; Compensatory Measures; Access Control - Packages and Vehicles; and Communications. The inspection began during the day shift.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined, except as noted below:
Compensatory Measures - Failure to implement adequate compensatory measures.
(Details - UNCLASSIFIED )
Enclosure contains SAFEGUARDS INFORMATIOR 8605230136 860526 UPon Separation thisy
$DR ADOCM 05000409 Page is Decontrolled PDR