Notice of Violation from Insp on 930903-24.Violation Noted: Licensee Failed to Have Three Mechanics & Two Instrument & Control Technicians Reporting to Plant Manager
ML20057G098
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/06/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20057G085 List:
References
50-409-93-01, 50-409-93-1, NUDOCS 9310200166
Download: ML20057G098 (1)


Text

.

i.

U.S. NUCLEAR REGULATORY COMMISSION REGION III 1

Report No. 50-409/92001(DRSS)

Docket No. 50-409 License No. DPR-45 a

Licensee: Dairyland Power Cooperative 2615 East Avenue-South Lacrosse, WI 54601 Facility Name:

La Crosse Boiling Water Reactor a

Inspection At:

La Crosse Site, Genoa, Wiscensin l

Inspection Conducted:

September 3 and September 22-24, 1993 Inspectors:

c3 x /

O J

1 e

R. Al iPaul g

Date '

M/feodurw d' &J C ~. Cox /

Date '

Approved By:

M h)

J.' W. MdCormick-rams s,// Chief ger Date '

Radiological Pr ection 1

Inspection summarv Inspection on September 3 and September 22-24. 1993 (Report No. 50-409/93001 (DRSS))

Areas Inspected:

Routine announced inspectior: of the licensee's program during the SAFSTOR phase of the Decommissioning Plan including operational safety (IP 71701), fire protection and prevention (IP 64704), radioactive waste management and transportation (IP 86750 and 84101), occupational exposure (IP 83100), emergency preparedness (IP 82701), management control (IP 83722) and training and qualification programs (IP 83723).

The Decommissioning Plan was implemented in December 1991.

Results:

One violation was identified in staffing levels for the LACBWR SAFSTOR organization.

Only one mechanic and one instrument and control (I&C) technician remained on the LACBWR staff when the Decommissioning Plan required three mechanics and two I&C technicians.

No other problems were noted and with the exception of the staffing levels, the licensee appeared to be successfully implementing the SAFSTOR phase of the decommissioning program.