Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000409/1999002 | 13 August 1999 | Insp Rept 50-409/99-02 on 990726-28.No Violations Noted. Major Areas Inspected:Mgt & Control,Sf Safety & Radiological Safety | |
IR 05000409/1999001 | 5 May 1999 | Insp Rept 50-409/99-01 on 990414-16.No Violations Noted. Major Areas Inspected:Aspects of Licensee Mgt & Control, Spent Fuel Safety & Radiological Safety | Offsite Dose Calculation Manual |
IR 05000409/1998005 | 17 December 1998 | Insp Rept 50-409/98-05 on 981207-10.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Sf Safety & Radiological Safety | |
IR 05000409/1998004 | 13 October 1998 | Insp Rept 50-409/98-04 on 980921-22.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Sf Safety & Radiological Safety | |
IR 05000409/1998003 | 17 August 1998 | Insp Rept 50-409/98-03 on 980811-12.No Violations Noted. Major Areas Inspected:Implementation of Physical Security Plan | Safeguards Contingency Plan |
IR 05000409/1998001 | 7 May 1998 | Insp Rept 50-409/98-01 on 980420-23.No Violations Noted. Major Areas Inspected:Mgt & Control,Spent Fuel Safety & Radiological Safety | Offsite Dose Calculation Manual Spent Fuel Pool Instrumentation |
IR 05000409/1997001 | 19 January 1998 | Insp Rept 50-409/97-01 on 971209-980107.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety | High Radiation Area Zebra Mussel |
IR 05000409/1993001 | 6 October 1993 | Insp Rept 50-409/93-01 on 930903-24.Violations Noted.Major Areas Inspected:Operational Safety,Fire Protection & Prevention,Radwaste Mgt & Transportation | |
IR 05000409/1990001 | 5 October 1990 | Insp Rept 50-409/90-01 on 900917-18.No Violations Noted. Major Areas Inspected:Operational Safety,Maint,Surveillance, Nonlicensed Staff Training,Audits,Licensee Review of Info Notices & Changes in Organizational Structure & Staffing | |
IR 05000409/1989002 | 1 September 1989 | Insp Rept 50-409/89-02 on 890801-11.No Violations Noted. Major Areas Inspected:Operational Safety,Maint,Surveillance, Nonlicensed Staff Training,Plant Procedures,Audits,Review of Info Notices & Fire Protection & Prevention Programs | Safeguards Contingency Plan |
IR 05000409/1989001 | 22 May 1989 | Insp Rept 50-409/89-01 on 890508-11.No Violations or Deviations Noted.Major Areas Inspected:Licensee post- Shutdown Radiation Protections & Radwaste Mgt Programs, Including Organization,Mgt Controls & Training | |
IR 05000409/1988009 | 16 November 1988 | Partially Withheld Physical Security Insp Rept 50-409/88-09 on 881021-26 & 1101 (Ref 10CFR2.790(d).Major Areas Insp: Implementation of Newly Approved Physical Security Plan for SNM Possession Only Site | |
IR 05000409/1988005 | 3 August 1988 | Insp Rept 50-409/88-05 on 880501-0731.Violations Noted.Major Areas Inspected:Operation Safety,Maint,Surveillance, Transportation,Multiple Action Items & Bulletins | Hydrostatic Scram Discharge Volume Safeguards Contingency Plan |
IR 05000409/1988006 | 2 June 1988 | Insp Rept 50-409/88-06 on 880517-20.Violations Noted.Major Areas inspected:post-shutdown Radiation Protection & Radwaste Mgt,Including Organization,Mgt Controls,Training External & Internal Exposure Controls & Solid Radwaste | |
IR 05000409/1988002 | 25 April 1988 | Insp Rept 50-409/88-02 on 880321-22.No Violations Noted. Major Areas Inspected:Allegations Received Re Alarm Operators Being Told to Disregard Alarms to Clean Work Area. Results of Insp:Allegations Not Substantiated | |
IR 05000409/1988003 | 1 April 1988 | Insp Rept 50-409/88-03 on 880207-0320.Violation Noted.Major Areas Inspected:Operational Safety,Maint,Surveillance & Surveillance Procedures & Records,Lers,Bulletins,Special Repts & Organization & Administration | Safe Shutdown |
IR 05000409/1988001 | 23 February 1988 | Insp Rept 50-409/88-01 on 871206-880206.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Licensee Actions on Previous Insp Findings,Monthly Maint Observation,Monthly Surveillance Operation & QA Program | |
IR 05000409/1987014 | 30 October 1987 | Insp Rept 50-409/87-14 on 871013-16.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection & Radwaste Mgt Programs,Past Open Items,Plans for post-shutdown Staffing & Incidents & Events | |
IR 05000409/1987011 | 23 October 1987 | Insp Rept 50-409/87-11 on 870822-1016.No Violations Noted. Major Areas Inspected:Previous Insp Findings,Operational Safety Verification,Monthly Maint & Surveillance Observation,Ler Followup,Tmi Open Items & Organization | |
IR 05000409/1987012 | 24 September 1987 | Partially Withheld Insp Rept 50-409/87-12 on 870908-16(ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Licensee Action on Previous Inspection Findings & Security Plan & Implementing Procedures | |
IR 05000409/1987010 | 28 August 1987 | Insp Rept 50-409/87-10 on 870718-0821.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Monthly Maint & Surveillance Observations,Ler Followup, Design Changes & Mods,Reviews & Audits & Organization | Hydrostatic Emergency Lighting |
IR 05000409/1987009 | 24 July 1987 | Insp Rept 50-409/87-09 on 870601-0717.No Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety Verification,Monthly Maint Observation, Monthly Surveillance Observation & LERs | |
IR 05000409/1987008 | 12 June 1987 | Insp Rept 50-409/87-08 on 870415-0530.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operation Safety Verification,Monthly Maint & Surveillance Observations,Ler Followup & IE Info Notices | Stroke time |
IR 05000409/1987006 | 11 May 1987 | Insp Rept 50-409/87-06 on 870407-09.Violation Noted:Licensee Failure to Isolate Waste Tanks Which Resulted in Release of Unanalyzed Liquid | Grab sample Fuel cladding |
IR 05000409/1987007 | 29 April 1987 | Partially Withheld Security Insp Rept 50-409/87-07 on 870413-16.No Noncompliance Noted.Open Findings Identified: False Alarm & Security Computer Outage Rates Inappropriate. Major Areas Inspected:Security Plan & Procedures | |
IR 05000409/1987003 | 21 April 1987 | Insp Rept 50-409/87-03 on 870221-0415.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation | Hydrostatic |
IR 05000409/1987005 | 8 April 1987 | Insp Rept 50-409/87-05 on 870316-20.No Violations or Deviations Noted.Major Areas Inspected:Qa/Qc of Analyses in Lab,Internal Audits,Training & Qualifications of Chemistry Staff & Review of Previously Identified Open Items | |
ML20212M715 | 5 March 1987 | Insp Rept 50-409/87-02 on 870105-0302.Deficiencies Noted: Environ Qualification File for GE RTV Sealants Not in Auditable Form & Lack of Adequate Participation of QA Personnel in Environ Qualification Training Program | Safe Shutdown |
IR 05000409/1986017 | 27 February 1987 | Insp Rept 50-409/86-17 on 861206-870220.No Violation Noted. Major Areas Inspected:Operational Safety Verification, Monthly Maint & Surveillance,Ler Followup,Ie Bulletins & Notices & Training & Qualification Effectiveness | |
IR 05000409/1986018 | 21 January 1987 | Insp Rept 50-409/86-18 on 861217 & 30.Violation Noted: Failure of Engineering to Review Support Design Changes | |
ML20207F549 | 2 January 1987 | Safety Insp Rept 50-409/86-16 on 861208-16.No Violations or Deviations Noted.Major Areas Inspected:Confirmatory Measurements Program,Including Sample Split,Onsite Analysis W/Region III Mobile Lab & Previously Identified Open Items | |
IR 05000409/1986011 | 23 December 1986 | Insp Rept 50-409/86-11 on 861201-04.No Noncompliance, Deficiencies or Deviations Noted.Major Areas Inspected: Emergency Preparedness Exercise | |
IR 05000409/1986013 | 17 December 1986 | Insp Rept 50-409/86-13 on 860927-1205.No Violations Noted. Major Areas Inspected:Action on Previous Insp Findings, Operational Safety Verification & Generic Ltrs.Item Re Containment Integrity Requirements Inadequately Addressed | Power change |
IR 05000409/1986015 | 15 December 1986 | Partially Withheld Physical Security Insp Rept 50-409/86-15 on 861117-21 & 24 (Ref 10CFR73.21).Major Areas Inspected: Security Plan/Implementing Procedures,Security Organization, Records & Repts & Testing & Maint | Safeguards Contingency Plan |
IR 05000409/1986014 | 7 November 1986 | Insp Rept 50-409/86-14 on 861027-30.No Violation or Deviation Noted.Major Areas Inspected:Resolution of IE Bulletin 79-02, Pipe Support Baseplate Design Using Concrete Expansion Anchor | |
IR 05000409/1986009 | 14 October 1986 | Insp Rept 50-409/86-09 on 860614-0926.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint Activities,Licensee Event Repts Followup,Bulletins,Plant Trips & Open Items | Power change |
IR 05000409/1986012 | 23 September 1986 | Insp Rept 50-409/86-12 on 860902-05.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection & Radwaste Mgt Programs,Including Organization, Qualifications & Mgt Controls & Training | High Radiation Area |
IR 05000409/1986010 | 10 September 1986 | Insp Rept 50-409/86-10 on 860724-0828.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Activities,Licensee Action on Generic Ltr 84-11 & DHR Pump Suction Line Repair | Nondestructive Examination Liquid penetrant |
IR 05000409/1986008 | 26 August 1986 | Insp Rept 50-409/86-08 on 860804-08 & 14.Violations Noted: Failure to Notify State & Local Govt Agencies within 15 Minutes of Unusual Event & to Maintain Emergency Kit Supplies | Siren |
IR 05000409/1986006 | 26 June 1986 | Insp Rept 50-409/86-06 on 860407-0613.No Violations Noted. Major Areas Inspected:Operational Safety Verification,Maint Activities,Ler Followup,Plant Trips,Forced Manual Shutdowns & Startup Testing - Refueling | Shutdown Margin Fire Barrier |
IR 05000409/1986007 | 13 June 1986 | Safety Insp Rept 50-409/86-07 on 860512-30.No Violation or Deviation Noted.Major Areas Inspected:Nonlicensed Personnel Training,Effectiveness of Licensed Operator Training & Followup on Radiation Safety Officer Training | |
IR 05000409/1986005 | 5 June 1986 | Insp Rept 50-409/86-05 on 860408-12 & 0528.No Violation Noted.Major Areas Inspected:Hpcs Bundle Reinstallation & Engineering Evaluation of Tube Stress | |
IR 05000409/1986004 | 15 May 1986 | Partially Withheld Physical Security Insp Rept 50-409/86-04 on 860324-28 (Ref 10CFR73.21).Violation Noted:Failure to Implement Adequate Compensatory Measures | |
IR 05000409/1986002 | 10 April 1986 | Insp Rept 50-409/86-02 on 860217-0404.No Violation Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operational Safety Verification,Maint Activities & LER Followup | |
IR 05000409/1986003 | 28 March 1986 | Insp Rept 50-409/86-03 on 860310-14.Violation Noted:Failure to Follow Procedure Requiring Establishment of Beta Exposure Rates in Reactor Head Cavity Area | |
IR 05000409/1985022 | 21 February 1986 | Insp Rept 50-409/85-22 on 851217-860214.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Operational Safety Verification,Monthly Maint Observation,Ler Followups & TMI Action Items | Systematic Assessment of Licensee Performance Weak link |
IR 05000409/1985021 | 16 January 1986 | Insp Rept 50-409/85-21 on 851216-19.No Noncompliance or Deviation Noted.Major Areas Inspected:Confirmatory Measurements Program,Including Sampling,Lab Qc,Followup on Open Items & Regulatory Improvement Items | |
IR 05000409/1985020 | 4 December 1985 | Insp Rept 50-409/85-20 on 851112-15.No Violation or Deviation Noted.Major Areas Inspected:Gaseous & Liquid Radioactive Program,Including Effluent Release Records,Repts of Effluents & Effluent Control Instrumentation | Grab sample Post Accident Monitoring Fuel cladding |
IR 05000409/1985019 | 19 November 1985 | Insp Rept 50-409/85-19 on 851023-25.No Violations or Deviations Noted.Major Areas Inspected:Followup on Alert Declared by Licensee & Actions Re Confirmatory Action Ltr on Flux Level Alarm Failing to Scram on 851023 | Failure to Scram |
IR 05000409/1985017 | 5 November 1985 | Insp Rept 50-409/85-17 on 851023-1101.No Violation or Deviation Noted.Major Areas Inspected:Followup of IE Bulletin 84-03,inservice Testing Program Implementation & Inservice Testing of Pumps,Valves & Test Instruments | Stroke time Earthquake Power Operated Valves |