Insp Rept 50-409/88-01 on 871206-880206.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Licensee Actions on Previous Insp Findings,Monthly Maint Observation,Monthly Surveillance Operation & QA Program
ML20147C485
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 02/23/1988
From: Jackiw I, Ridgway K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20147C454 List:
References
50-409-88-01, 50-409-88-1, NUDOCS 8803030093
Download: ML20147C485 (7)


Text

,

.

.

.;

,.,.-

.U.S. NUCLEAR REGULATORY COMMISSION'-

REGION III

' Report No. 50-409/88001(DRP)

Docket No. 50-409

.

License'No. DPR-45

~~

Licensee: Dairyland Power Cooperative 2615 East Avenue -South

,

La Crosse, WI 54601 Facility Name: La Crosse Boiling Water Reactor-

-Inspection At: .La Crosse Site, Genoa, Wisconsin Inspection Conducted: December 6, 1987 through February 6, 198 Inspector: -J3-8P T - C/

'

Approved By: I. K Jackiw

.

tef J -2 3 -TV Reactor Pr ects Section 28 Date Inspection Summary Inspection from December 6, 1987 through February 6, 1988 Report No. 50-409/88001(ORP))

Areas Inspected: Routine, unannounced inspection by the resident inspector of Licensee Actions on Previous Inspection Findings: Operational Safety Verification; Monthly Maintenance Observation; Monthly Surveillance Observation; Quality Assurance Program; and Procedure Results: No violations or significant safety issues were identifie "

8803030093 880224 PDR ADOCK 05000409 ,

O DCD

gje?

M

. ; <

-,

.

>

,

-

DETAILS Persons Contacted J*J. Parkyn, Plant Superintendent

  • G.' Boyd, Operations Supervisor L.' Nelson, Health'and Safety Supervisor

-* R. Wery, Quality Assurance Supervisor

'

R. Cota, Shift Supervisor (Training)

The inspector' also interviewed other licensee personnel during the course of the inspectio * Denotes those attending exit interviews during the' inspection perio . General The La Crosse Boiling Water Reactor (LACBWR) was permanently shutdown on

' April 30, 1987 by authorization of the Dairyland Power Cooperative (DPC)

Board. The operating License was changed to a possession-only license by Amendment No. 56, dated August 4, 1987. The reactor is defueled with water in the primary system and is considered to be in Operating Condition 4 (Cold Shutdown) until Technical Specifications (TS) changes are made or the Decommissioning Plan TS are accepte Minimum TS staffing requirements for Condition 4, a Shift Supervisor, a licensed Reactor Operator and an Auxiliary Operator, are being met by utilizing experienced maintenance personnel who have completed Auxiliary Operator (AO) training and have been certified as A0 On January 4, 1988, Amendment No. 58 to the provisional license revising the Technical Specifications was issued. This amendment reduces the fire brigade from five members to three, reassigr s fire brigade training from the Mechanical Engineer to a qualified Technical Support Engineer, deletes the position of Training Supervisor and reassigns training program responsibilities to a qualified Shift Supervisor, changes the Operations Review Committee membership due to the reduction in staff, and changes the Facility Organization Char In an organizational change on January 4,1988, the Quality Assurance Department, which formerly reported to the LACBWR Plant Superintendent, now reports to the Assistant General Manager for Operations. The department, consisting of the Quality Assurance Director and four QA/QC Technicians, will devote approximately fifty percent of their effort to the LACBWR program On December 21, 1987, DPC submitted their proposed Decommissioning Plan, the preliminary Decontamination Plan, and a supplement to the Environmental Report. The new TS for SAFSTOR will be submitted separately in February 198 . . _ _ _ _ _ . _ _ - _ _ _ - _

o 6,

. .

.

y - '

v Demineralized water flushes of reactor systems continues. The forced circulation systems are started and flushed periodically. Flushing of

.the 4500 gallon waste tank has been stopped until a more_ productive method can be-develope A temporary plastic' cover has been installed'over the Fuel. Element Storage Well-(FESW) to help reduce the low-level surface contamination on the refueling deck. Previous levels in the 50k-60k cpm range near the FESW have been reduced to near 7k cpm and the number of personnel contaminations were reduced from 34 in December 1987 to 14 in January

'198 . Licensee Actions on Previous Inspection Findings (Closed) Open Item 409/85013-08: Licensee committed to installing an area-wide fire detection system in the control room. The licensee has installed and tested three fire detectors in the control room and three in the adjacent office area. This work was completed under Facility Change No. 06-87-24 and Maintenance Request 307-87-06.

Operational Safety Verification The inspector reviewed applicable logs and conducted discussions with control room operators. The inspector verified the operability of !

selected emergency systems, reviewed tagout records, and verified proper return to service of affected components. Tours of the crib house, reactor building, and turbine building were conducted to observe plant equipment conditions, including potential fire hazards, and fluid leaks, and to verify that maintenance requests had been initiated for equipment in need of maintenance. By observation and direct interview the inspector verified that the physical security plan was being implemented in accordance with the station security pla The inspector observed plant housekeeping / cleanliness conditions and verified implementation of radiation protection controls. The inspector walked down portions of the High Pressure Service Water System, and Fire Protection System to verify operabilit ,

r No violations were identifie . Monthly Maintenance Observation Station maintenance activities of selected systems and components were observed / reviewed to ascertain that they were conducted in accordance with approved procedures, regulatory guides and industry codes or standards and in conformance with technical specification The following items were considered during this review: approvals were obtained prior to initiating the work; activities were accomplished using apnroved procedures and were inspected as applicable; functional testing and/or calibrations were performed prior to returning components or i

,

-

.- - - -

<

. '

e .. - b --

'

- ,

r

.

~

systems to service; quality control records were maintained; activities were accomplished by' qualified personnel; parts and materials used were-properly certified; radiological controls were implemented; and, fire prevention controls were implemente Work requests were reviewed to determine status of outstanding jobs and to assure that priority was assigned to the maintenance of SAFSTOR equipment which could affect plant safet No violations were identifie . Monthly Surveillance Observation The inspector reviewed the licensee's surveillance program to~ assure that required surveillances had been performed and test records were availabl The licensee has reviewed the surveillance program in light of their shutdown status and has stopped performing those tests on instruments and equipment not needed for TS Operating Condition 4. Surveillances on systems such as the Control Rods and Safety System, the Emergency Service Water Supply System, Reactor Pressure and Power Instrumentation, High Pressure Core Spray and Boron Systems, Alternate Core Spray (not including the backup fire protection portion) are no longer performe The licensee has submitted a proposed amendment to delete these systems from the T .The inspector observed the semiannual fire detector testing conducted on December'7, 198 No violations were identifie . Quality Assurance Program (QAp)

The inspector reviewed the licensees organization and management controls for implementing their quality assurance program, as described, in their Quality Assurance Program Description (QAPD),

Revision 5, dated December 21, 198 This QAPD revision, submitted af ter the LACBWR Provisional Operating License was changed to a possession-only mode of operation, modifies the plan to acknowledge the change to a possession-only license with the significant reduction in potential risks to the health and safety of the public. The modifications include deletion of references to an operational plant status, safety related systems, inservice inspections, and physics testing. The QAPO still addresses all 18 criteria of 10 CFR 50, Appendix The following documents were reviewed:

Administrative Control Procedures (ACPs)

ACP-03.1 Quality Assurance Department, Issue 4, 10/10/86

.

-

- - - -

,

,

,

i ' p ,

. . 9.r :. ,

' ' ~

.

'ACP-17.1 Incident Reports,LIssue'19,'12/23/86

'-

ACP-18.1 Collection, Storage and Maintenance'of LACBWR QA Records, Issue 4,~4/28/87-

. Quality Assurance Instructions (QAI)-

QAI-1 ' Preparation, Issuance and Distribution of the QAPD, Issue 4, 10/10/87 QAl-2 Preparations and Issuance of QA Documents, Issue 3, 1/24/86 QAI-3 Controlled Distribution of QA Documents, Issue 3, 1/24/86 QAI-7 Requirements for Issuance and Control of Deficiency Reports and Disposition of Nonconforming Materials, Parts, and Equipment, Issue 4, 3/6/87

'

QAI-8 QA/QC Personnel Qualification and Training Program, Issue 5, 10/8/86  :

QAI-2, above, establishes Quality Assurance Inspection Reports (QAIR) to >

document important or significant QA activities or events which might not be documented by nonconformance reports. To close out the QAIR, required actions are specified with follow-up and closure. QAIRs are consecutively numbered and maintained in a log as an official QA file. The QAIR Log was reviewed and indicated 45 had been issued in 1986 and only eight in 1987. Most of the 1987 QAIRs concerned verification of modification or maintenance completio QAI-7, above, establishes requirements for the issuance and control of Deficiency Reports (DR) and required corrective actions. The DRs for the years 1986 and 1987 were reviewed to determine if adequate corrective actions had been taken in a timely manner. .The 26 DRs of 1986 had been closed where only one of the five in 1987 had been closed. The four open DRs were concerned with safety equipment not now required to safely .

'

maintain the shutdown facility, but will be closed by the license The Quality Assurance Program appears to be in conformance with the QAPD and implementing procedure No violations were identifie . Procedures The inspector reviewed selected procedures concerning operations, maintenance, health and safety, and administration areas to determine if the procedures were reviewed, approved and changed in accordance with TS requirements and internal procedure controls. The following procedures were reviewed:

+ __L __

+ ,

I-

'(![ -*

La Administrative Control Procedures ( ACP)~

-ACP-01.1_ -Preparation, Format, and Content'of ACPs,- 13, 5/20/87 ACP-06.1' Preparation and Use of Procedures, 12, 12/16/87

<

ACP-0 Procedure Adherence-and-Temporary Changes, 9, 3/30/87-ACP-06.3' LACBWR Operating' Manual Review, 11,-12/22/87 ACP-02.13 Operations Review Committee, 3, 7/28/86

- ACP-0 Review, Approved, and. Issuance of LACBWR Controlling Documents, 3,~ 7/28/86 LACBWR Operating Manual VOL II 11 Fuel Element Storage Well System, July 1986 VOL II 13 Component Cooling System, December 1986 VOL II 15 Overhead Storage Tank, July 1986 VOL'V 6 Low Pressure Service Water, December 1986

,

V0L V 7 High Pressure Service Water System, July 1986 VOL XI 3.5.6 Electrical Penetration;, March 1987 VOL XI 3.5.7 Electrical Penetrations, March 1987 Mechanical Maintenance Procedures

- M-02-01 Sling Inspection, 2/18/86 M-37-01 LACBWR Crane Inspection, 2/18/86 Instrument and Electrical Procedure I&E-45-01 Adjustment of Radiation Monitoring Devices During Biweekly Tests, 2/13/86 I&E-78-04 Diesel Generator Building 6-month Battery Test Discharge, 1/24/06 Health and Safety Procedures HSP-0 Installed Radiation Monitors Source Checks and Functional Tests, 5/20/87 HSP-02.11 Radiological Signs and Markers, 3/1/87

. _ _ _ _ _ _ _ - _ _ _ _

_

4'

'

'!' a;.

f

.

Operating Manual Procedures have been reviewed and updated periodicall Procedures for many systems which are no longer in use are being retained

,

in' case the systems need future modifications or valve line-up changes needed for system flushing. The periodic reviews and procedure updsbes have been processed in accordance with the ACP-06.3, and reviewed by the Operations Review Committee following ACP-02.13. A review of the Temporary Change Log indicated only six temporary changes processed in 1987 as compared to 44 in 1986. The' changes have been processed in accordance with ACP-0 The inspector noted that many Instrument and Electrical Procedures were due for their two year review. The licensee stated that these procedures were currently being processed and that those procedures no longer needed, due to the permanent shutdown, would be removed from the system, but a master set would be retained in records for possible future use The above procedure systems appear to be maintained in accordance with TS and ACP requirement No violations were identifie . Exit Interview The inspector met with licensee representatives (denoted in Paragraph 1)

throughout the inspection period and at the conclusion of the inspection summarized the scope and findings of the inspection activities. The licensee acknowledged the findings as reported herein and did not identify such documents or processes as proprietary.

.i

i