IR 05000409/1986015

From kanterella
Jump to navigation Jump to search
Partially Withheld Physical Security Insp Rept 50-409/86-15 on 861117-21 & 24 (Ref 10CFR73.21).Major Areas Inspected: Security Plan/Implementing Procedures,Security Organization, Records & Repts & Testing & Maint
ML20212A255
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/15/1986
From: Christoffer G, Creed J, Drouin B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20212A224 List:
References
50-409-86-15, NUDOCS 8612220341
Download: ML20212A255 (2)


Text

. U. S. NUCLEAR REGULATORY COMMISSION

REGION III

Report-No. 50-409/86-015(DRSS)

Docket No. 50-409 License No. DPR-45 Licensee: Dairyland Power Cooperative 2615 East Avenue - South Lacrosse, WI 54601 Facility Name: Lacrosse Boiling Water Reactor (LACBWR) i Inspection At: LACBWR Site, Genoa, Wisconsin Inspection Conducted: November 17-21 and 24, 1986 Date of Last Physical Security Inspection: March 24-28, 1986 Type of Inspectio : Una 4.$nouncedPhysicalSecurityInspection Inspectors:

Ph luff G. M. Christoffer Security Inspector Date

/ /

M //J/M

. o n #" l /

'

b Phys al Security Inspector Date '

Approved By: . . eed, Chief 17 /I O b afeguards Section Date '

. Inspection Summary Inspection on November 17-21 and 24, 1986 (Report No. 50-409/86015(DRSS))

Areas Inspected: Included a review of the licensee's action on Previous Inspection Findings; Security Plan / Implementing Procedures; Security Organization; Records and Reports; Testing and Maintenance; Physical Barriers - Protected and Vital Areas; Lighting; Assessment Aids; Access Control Personnel; Alarm Stations; Training and Qualification - General Requirements; Safeguards Contingency Plan, and Protection of Safeguards Informatio g PDR g $o$oko9 PDR G

,

EncTosure contai SAFEGUARDS INFORitATION Upon separation this pace is Decontrolled

.__-. .

_-

,

. . .

Results: The licensee was found to be in compliance with NRC requirements within the areas examined, except as noted below:

Physical Protection Safeguards Information: Failure to adequately protect Safeguards Informatio (UNCLASSIFIED ).

.

.,

l

!

!

EneTosure contains 2 Upon separation this page is Decontrolled

..

. _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ .