IR 05000298/1984002

From kanterella
Revision as of 10:20, 23 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IE Insp Rept 50-298/84-02 on 840227-0302.No Violations or Deviations Noted.Major Areas Inspected:Maint Program,Qa Program Organization & Administration & QA Records Storage
ML20197H227
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/11/1984
From: Jaudon J, Johnson W, Murphy M, Skow M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20197H224 List:
References
50-298-84-02, 50-298-84-2, NUDOCS 8406180374
Download: ML20197H227 (7)


Text

.

. .

.

APPENDIX U. S. NUCLEAR REGULATORY COMMISSION

REGION IV

..

NRC Inspection Report: 50-298/84-02 Docket: 50-298 License: DPR-46 Licensee: Nebraska Public-Power District (NPPD)

P. O. Box 499 Columbus, Nebraska 68601 Facility Name: Cooper Nuclear Station Inspection At: Cooper Nuclear Station, Brownville, Nebraska Inspection Conducted: February 27-March 2, 1984 Inspectors: - V FV M.'E. Murph 6 deac(or JKspector Date/

Reactor Project Section C U/lD -

4 , F(eactor Irppgor 4/)D/RO M. E. S)(9 e D' ate'

Reacto M rojec ectioVC/

/

Approved: _

/

fw M Y /

. udon, Chief, R actor Project Section A, Date Rroj t Branch 1

/2//) e 4d'0[84 W. D. p iison, Chief, Reactor Project Section C DatE 8406180374 840416 DRADOCK0500Cg

.. .- . _ - . .

Inspection Summary Inspection Con' ducted February 27-March 2, 1984 (Report 50-298/84-02)

'

l Areas-inspected: , Routine, unannounced inspection of maintenance program, QA-program, organization and administration, and QA records storage. The inspection

_

involved 60 inspector-hours onsite by two NRC inspector ,

,

'

-

-Results: Within the.four areas inspected, no violations or deviations were

,

, identified

, e s

,

.' T

. . -

,

,.3 '-

, 3

e DETAILS Persons Contacted

' Principal Licensee Personnel Nebraska Public Power District R. Bellke,. Training Manager

' Black,-Assistant to Operations Supervisor

'

C.' Goings, Regulatory Compliance Specialist

< *P.-Thomason, Nuclear Operations Division Manager G. Trevors, Quality Assurance Division Manager

.J.-Weaver,'-Licensing and Safety

  • K. Wire, Operations. Manager

._ Wolken, Outage Coordinator

  • V.i Wolstenholm, Quality Assurance Manager - CNS The NRC inspectors also contacted other plant personnel including '

administrative, clerical, engineering, and operation * Denotes' presence at the exit interview conducted March 2, 198 . Licensee Action On Previous Inspection Findings -

(0 pen). Violation (298/8229-01)i lThis.violationcitedthelicenseefor

'

~

failure to meet record retention requirements. Fu'rther discussion of this and other related items is' contained in paragraph '

$ This item'is ope '

.

, .

,

'

-(0 pen) Unresolved Item (298/8229-03): Th'is item was unresolved pending-a detailed review of site vault designs and' submittal of proposed record storage for NRC_ review and approval. Further discussion of this and other related items is contained in paragraph ar This item is ope .

(Closed) Open Item (298/8316-02): This item was open pending_ issue of a revision to licensee Procedure 1.5, " Selection and Training of Station Personnel," incorporating minimum educational and experience levels for positions listed in ANSI N18.1-1971, including' provisions for handling

, possible exceptions. The NRC inspectors reviewed Revision 11 dated January 24, 1984, of Procedure 1.5 and determined that it does include the required informatio .This item is close (0 pen) Violation.(298/8320-01): This violation cited the licensee with failure to include fire door P105 in both monthly and annual inspection +

,

v

'

, . -

4 e

, ,,

,

. > .. - \

7:

'

.

'

, 4

,

The licensee stated in the response to this violation, dated October 17,

.19,83, that:

'"The June 28, 1983, Appendix R exemption requests to the NRC from Pilant to Vassallo describes the service water pump room and the

' fact that the area is bounded by a nonrated door. An exemption was granted for this area in a December 14, 1982, letter from Vassallo-to Pflant in spite of the nonrated door . . . . In order to eliminate any.more confusion, we will include the exterior door to the service water pump room in our Surveillance Procedures (SP) 6.4.5.1 and SP 6.4.5.2 for completeness of our procedures. The procedures will also' state that the door is not a rated fire door, but does not need to be, as stated above."

The.NRC inspectors reviewed SPs 6.4.5.1 and 6.4.5.2 and determined that door P105 had been deleted and the outer security door P106 was now included. However, the procedures do not " . . . state that the door is not a rated fire door .... "

The NRC inspectors also found, during-review of Procedure 1.4, "St~ation Rules of Practice," that Attachment "F" had not been revised to delete door P105 and incorporate P10 This item is ope (Closed) Unresolved Item (298/8324-02): This item was open pending review of licensee action to establish effective control over the snubber surveil-lance records. The NRC inspectors reviewed P.rocedure 6.3.10.9.1, Revision 10, dated January 10, 1984, and determined that a detailed procedure with.well defined criteria is now included that will be used for selection of snubbers for test at the next refuelin This item is close (Closed) Open Item (298/8326-05): This item was open pending NRC review of the revision to' Procedure QAI-4, " General Guidelines-QA Surveillance," that would bring Procedure QAI-4 into agreement with QAI-5, " General Guidelines -

QA Audits," with' respect to assignment of corrective action responsibilit The NRC inspector reviewed QAI-4, Revision 12, dated January 30, 1984. This procedure is now in agreement with QAI-5 with respect to assignment of corrective action responsibilit This item is close (Closed) Deviation (298/83'26-06): The licensee was cited with this deviation for failure to issue a revision to Procedure QAI-7, " Quality Records Retention

,' Storage and Disposition," prior to August 31, 1983, as committed in a response

.

-

to a Notice of Violation dated January 6, 1983. The NRC inspector determined

that the committed revision was issued as of November 1, 198 '

lhis item is close .

.

,

. .

5 Maintenance Program This inspection was to determine that the licensee is implementing a maintenance. program that is in conformance with Technical Specifications, regulatory requirements, and industry guides or standards. The NRC

. inspectors reviewed the following licensee procedures:

N Title Re Date Station Rules of Practice 49 11/28/83 Personnel and Equipment Safety 24 12/24/83 1. Work Item Tracking - Corrective 6 12/29/83 Maintenance 1. Work Item Tracking - Preventative 3 8/30/83 Maintenance

~

~

1. Special Maintenance Procedures

1 8/26/83 1. Maintenance Quality Control Program 0 2/19/82 1. Work Item Tracking - Equipment History 1 8/26/83 7.10 Flame. Process Control- 1 5/1/82 This review determined that the licensee's maintenance program included the following elements:

'

Provides for administrative controls; assignment of responsibility; and scheduling of corrective, preventative, and special process maintenanc Provides housekeeping and cleanliness control *

Provides for removal of equipment and systems from service for p maintenanc Provides for compliance to Technical Specifications during maintenance of equipment and system *

Provides for returning equipment and systems to service.

i

~There were no violations or deviations identified in this area of the inspection.-

.

-

P

. .

4. Quality Assurance Program Annual Review This area of inspection was reported in NRC Inspection Report 50-298/83-26, dated December 6, 1983. Subsequently, an inspection of the onsite review committee was performed by the NRC senior resident inspector and reported in NRC Inspection Report 50-298/83-34, dated January 20, 1984. There were no violations or deviations found. This completes the QA program annual review for 198 . Organization and Administration The inspection was to determine that changes made to the licensee's onsite organizations are in conformance with the requirements of the Technical Specification This area of inspection was first attempted in July 1933, and discussed in NRC Inspection Report 50-298/83-16. Completion of the inspection was delayed since the licensee had just instituted significant organizational changes in both site and corporate management. A followup inspection was made in October 1983, and discussed in NRC Inspection Report 50-298/83-2 During that inspection, it was found that many vacancies still existed in the organization structure and the request for a change in the Technical Specifications had not been submitte During this inspection, the NRC inspectors found that the licensee submitted a proposed change to the Technical Specifications on October 26, 1983. A further review disclosed that the majority of the organization vacancies had been fille Personnel qualification levels are in conformance with applicable code There were no violations or deviations found in this area of the inspectio . QA Records Storage As a followup to the records problems discussed in NRC Inspection Reports 50-298/82-29, 50-298/83-24, and 50-298/83-26, the NRC inspectors reviewed the licensee's actions on various open items, unresolved items, deviations, and violations. This review resulted in the closure of only one item, Deviation 8326/06. -This deviation cited the licensee for failure to issue a revision to Procedure QAI-7, " Quality Records Reten-tion Storage and Disposition," as committed in a response to a Notice of Violation dated January 6,1983. The committed revision was issued

'

November 1, 198 The results of this review were discussed with licensee representative The NRC inspectors observed that the licensee has not submitted a proposal for records storage facilities to meet their commitment to ANSI N45.2.9-1974 and Regulatory Guide 1.88. The NRC inspectors were infori..ad that a revision i

m

. . .

'

toth'equalityassurancepolicydo'cumentwasinpreparationandthatthe reyised document would address all issues with records storage facilities and records. retention. Pending revision, this will be considered an unresolved item (298/8402-01). Unresolved Items Unresolved items are matters.about which more information is required in order to ascertain whether they are acceptable items, violations, or deviations. One unresolved item disclosed during this inspection is di.scussed in paragraph . Exit Interview

~

An exit interview was held March 2, 1984, with the personnel denoted in paragraph 1 of this report. The NRC senior resident inspector also attended this meeting. At this' meeting the scope of the inspection and the findings were summarizdd.-

-

ng V

w

~

/

s

>

...

+

'O %

.

MI

, ;, ..