ML20197H218

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-298/84-02 on 840227-0302.No Violations or Deviations Noted
ML20197H218
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/16/1984
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20197H224 List:
References
NUDOCS 8406180371
Download: ML20197H218 (2)


See also: IR 05000298/1984002

Text

I

"

y{t 1

g,; ,,ll

'a

.

In Reply Refer To:

Docket:

50-298/84-02

APR 161984

Nebraska Public Power District

"

ATTN:

J.<M. Pilant, Manager, Technical

-

Staff-Nuclear Power Group

P.O. Box.499 .

Columbus, Nebraska 68601.

'

Gentlemen:

kThisreferstotheinspectionconductedbyMessrs.M.E.MurphyandM.E.Skow

'

'of this' office during the period February 27-March 2, 1984, of activities

'

authorized by NRC Operating License DPR-46 for Cooper Nuclear Station, and to

~ i the discu:ision of.our findings with Mr. P. Thomason, and other members of your

staff at the conclusion of the inspection.

,

,

,; Areas, examined during the inspection included:

1) maintenance program,

,2) quality assurance program annual review, 3) organization and administration,

"

-and 4) QA records storage. Within these areas, the inspection consisted of

,

' selective examination of procedures and representative records, interviews

"'

.with personnel, ano-observations by the inspectors.

These findings are documented

in'the enclosed inspection report.

,

>Within the scope of the inspection, no violations or deviations were

identified.

-One unresolved item is identified in paragraph 6 of the enclosed inspection

report.

As discussed in the exit interview, we understand that you will respond

with additional information that will enable us to resolve this item.

We have'also examined actions you have taken with regard to previously

identified inspection findings. The status of these_ items is identified in

paragraph 2 of the-enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days'of the date of this letter, and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

r

O

/

4

MSkok[

RPSC,fg

RPSC

RP

RPB1 N

RPB2 Y

RPSC T

.MMurpdy:jd

WJoh on

JJa on

EHJohnson

EHJohnson

j/(,/84

Y/3/84

3 /$/84

4////84

4 /tL/84

4/ t2/84

8406180371 840416

PDR ADOCK 05000298

G

PDR

- -

-

- -

.

-

._

.

4

,

- ,

Nebraska Publ'ic Power Distric't

-2 '

.

Should you'have any questions concerning this inspection, we will be pleased

to discuss them with you.

t

Sincerely,

. >

Original Signed By,

'

E. H. Johnsort

'

E. H. Johnson, Chief

Reactor Project Branch 1

Enclosure:

Appendix - NRC Inspection Report

50-298/84-02

,

cc w/ enclosure:

'

Paul V. Thomason, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P.O. Box 98

Brownville, Nebraska 68321

bec to DMB (IE01)

-bcc distrib.' by RIV:

RPB1

Resident Inspector

J. Collins, RA

RPB2

Section Chief-(RPB1/A)

MIS System

TPB-

. _

R. Denise, DRS&P

RIV File

- KANSAS STATE DEPT. HEALTH

fn,n)qeph7

NEBRASKA STATE DEPT. HEALTH

m. Sko w

.

4

1

1