In Reply Refer To:
Docket:
50-298/84-02
APR 161984
Nebraska Public Power District
"
ATTN:
J.<M. Pilant, Manager, Technical
-
Staff-Nuclear Power Group
P.O. Box.499 .
Columbus, Nebraska 68601.
'
Gentlemen:
kThisreferstotheinspectionconductedbyMessrs.M.E.MurphyandM.E.Skow
'
'of this' office during the period February 27-March 2, 1984, of activities
'
authorized by NRC Operating License DPR-46 for Cooper Nuclear Station, and to
~ i the discu:ision of.our findings with Mr. P. Thomason, and other members of your
staff at the conclusion of the inspection.
,
,
,; Areas, examined during the inspection included:
1) maintenance program,
,2) quality assurance program annual review, 3) organization and administration,
"
-and 4) QA records storage. Within these areas, the inspection consisted of
,
' selective examination of procedures and representative records, interviews
"'
.with personnel, ano-observations by the inspectors.
These findings are documented
in'the enclosed inspection report.
,
>Within the scope of the inspection, no violations or deviations were
identified.
-One unresolved item is identified in paragraph 6 of the enclosed inspection
report.
As discussed in the exit interview, we understand that you will respond
with additional information that will enable us to resolve this item.
We have'also examined actions you have taken with regard to previously
identified inspection findings. The status of these_ items is identified in
paragraph 2 of the-enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days'of the date of this letter, and submit written
application to withhold information contained therein within 30 days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
r
O
/
4
MSkok[
RPSC,fg
RPSC
RPB1 N
RPB2 Y
RPSC T
.MMurpdy:jd
WJoh on
JJa on
EHJohnson
EHJohnson
j/(,/84
Y/3/84
3 /$/84
4////84
4 /tL/84
4/ t2/84
8406180371 840416
PDR ADOCK 05000298
G
- -
-
- -
.
-
._
.
4
,
- ,
Nebraska Publ'ic Power Distric't
-2 '
.
Should you'have any questions concerning this inspection, we will be pleased
to discuss them with you.
t
Sincerely,
. >
Original Signed By,
'
E. H. Johnsort
'
E. H. Johnson, Chief
Reactor Project Branch 1
Enclosure:
Appendix - NRC Inspection Report
50-298/84-02
,
cc w/ enclosure:
'
Paul V. Thomason, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P.O. Box 98
Brownville, Nebraska 68321
bec to DMB (IE01)
-bcc distrib.' by RIV:
RPB1
Resident Inspector
J. Collins, RA