Category:INSPECTION REPORT
MONTHYEARIR 05000282/19990141999-10-19019 October 1999 Insp Repts 50-282/99-14 & 50-306/99-14 on 990920-22. Violations Noted.Major Areas Inspected:Heat Sink Performance IR 05000282/19990121999-10-0606 October 1999 Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000282/19990071999-09-28028 September 1999 Insp Repts 50-282/99-07 & 50-306/99-07 on 990721-0831. Non-cited Violations Noted.Major Areas Inspected:Followup Y2K Readiness Review IR 05000282/19990101999-09-10010 September 1999 Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12. Non-cited Violations Noted.Major Areas Inspected:Physical Protection Cornerstone,Within Safeguards Strategic Assessment Area IR 05000282/19990111999-09-0909 September 1999 Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.NCV Noted.Major Areas Inspected:Public Radiation Safety & Included Review of Performance Indicators for Occupational & Public Radiation Safety IR 05000282/19990091999-08-17017 August 1999 Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22. Violations Noted.Major Areas Inspected:Reactor Safety, Emergency Preparedness & Review of Performance Indicators for Reactor Safety & Emergency Preparedness IR 05000282/19990061999-08-12012 August 1999 Insp Repts 50-282/99-06 & 50-306/99-06 on 990601-0720.One NCV Occurred.Major Areas Inspected:Activities Related to Reactor Safety,Verification of Performance Indicators,Event Followup & Compliance with Commission Rules & Regulations IR 05000282/19990041999-06-30030 June 1999 Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19990051999-05-25025 May 1999 Insp Repts 50-282/99-05 & 50-306/99-05 on 990426-30.No Violations Noted.Major Areas Inspected:Review of Licensee Radiation Protection Performance During Unit 1 Refueling Outage,Shutdown Chemistry & Crud Burst IR 05000282/19990021999-05-0404 May 1999 Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07200010/19990011999-04-29029 April 1999 Insp Rept 72-0010/99-01 on 990308-0413.No Violations Noted. Major Areas Inspected:Direct Observation of Various Portions of Loading of Eighth & Ninth Dry Fuel Storage Casks from SFP to ISFSI Located Away from Main Protected Area of Site IR 05000282/19990031999-04-16016 April 1999 Insp Repts 50-282/99-03 & 50-306/99-03 on 990322-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000282/19990011999-03-18018 March 1999 Insp Repts 50-282/99-01 & 50-306/99-01 on 990115-0225.No Violations Noted:Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19980231999-01-29029 January 1999 Insp Repts 50-282/98-23 & 50-306/98-23 on 981204-990114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980201998-12-18018 December 1998 Insp Repts 50-282/98-20 & 50-306/98-20 on 981023-1203.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000306/19980211998-12-17017 December 1998 Insp Rept 50-306/98-21 on 981116-24.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage Cycle 19 IR 05000282/19980221998-12-0101 December 1998 Insp Repts 50-282/98-22 & 50-306/98-22 on 981116-20.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Performance During Unit 2 Refueling Outage IR 05000282/19980181998-11-18018 November 1998 Insp Repts 50-282/98-18 & 50-306/98-18 on 980911-1022.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980191998-10-29029 October 1998 Insp Repts 50-282/98-19 & 50-306/98-19 on 981013-16.No Violations Noted.Major Areas Inspected:Review of Chemistry Program Re Plant Water Quality & Analytical Capabilities ML20154J9881998-10-0909 October 1998 Insp Repts 50-282/98-16 & 50-306/99-16 on 980810-28. Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected:Review of Fire Protection Project self- Assessment IR 05000282/19980151998-10-0909 October 1998 Insp Repts 50-282/98-15 & 50-306/98-15 on 980731-0910. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000282/19980131998-08-21021 August 1998 Insp Repts 50-282/98-13 & 50-306/98-13 on 980727-31.No Violations Noted.Major Areas Inspected:Review of Physical Security Program IR 05000282/19980091998-08-19019 August 1998 Insp Repts 50-282/98-09 & 50-306/98-09 on 980619-0730.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980121998-08-14014 August 1998 Insp Repts 50-282/98-12 & 50-306/98-12 on 980720-24.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000282/19980141998-08-11011 August 1998 Insp Repts 50-282/98-14 & 50-306/98-14 on 980720-24.No Violations Noted.Major Areas Inspected:Review of Pcp,Storage & Processing of Solid Radwaste & Shipment & Disposal of Radioactive Matl ML20236P0111998-07-10010 July 1998 Insp Repts 50-282/98-10 & 50-306/98-10 on 980605-12. Violations Noted.Major Areas inspected:on-site Insp Into Circumstances Surrounding Unit 1 Rt Due to Dropped CR & Actions Taken for Recovery to Safe Shutdown on 980605 ML20236G9011998-06-28028 June 1998 Insp Repts 50-282/98-08 & 50-306/98-08 on 980512-0618.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980071998-06-0505 June 1998 Insp Repts 50-282/98-07 & 50-306/98-07 on 980329-0511. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000282/19980061998-05-26026 May 1998 Insp Repts 50-282/98-06 & 50-306/98-06 on 980330-0409.No Violations Noted.Major Areas Inspected:Conduct of Operations Which Included Continuous 72 H Period of Control Room Observation IR 05000282/19980051998-04-0606 April 1998 Insp Repts 50-282/98-05 & 50-306/98-05 on 980225-0328.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000282/19980041998-04-0101 April 1998 Insp Repts 50-282/98-04 & 50-306/98-04 on 980210-13 & 0316-20.No Violations Noted.Major Areas Inspected:Rp Performance During Unit 1 Refueling Outage & Unit 2 Forced Outage,Calibration of Radiation Monitoring Sys ML20216E4841998-03-12012 March 1998 Insp Repts 50-282/98-03 & 50-306/98-03 on 980114-0224. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20202C0581998-01-30030 January 1998 Insp Repts 50-282/97-23 & 50-306/97-23 on 971203-980113. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20198A4441997-12-23023 December 1997 Insp Repts 50-282/97-19 & 50-306/97-19 on 970929-1003,21-23 & 1202.Violations Noted.Major Areas Inspected:Licensed Reactor Operator & SRO Requalification Training Program IR 05000282/19970211997-12-15015 December 1997 Insp Repts 50-282/97-21 & 50-306/97-21 on 971022-1202.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19970201997-12-0505 December 1997 Insp Rept 50-282/97-20 on 971026-30 & 1117-19.No Violations Noted.Major Areas Inspected:Licensee Steam Generator Insp Program IR 05000282/19970221997-11-24024 November 1997 Insp Repts 50-282/97-22 & 50-306/97-22 on 971028-31.No Violations Noted.Major Areas Inspected:Plant Support Performance Re Refueling Outage,Surveys to Unconditionally Release Turbine Components & Shut Down Chemistry IR 05000282/19970181997-11-14014 November 1997 Insp Repts 50-282/97-18 & 50-306/97-18 on 970910-971021.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19970121997-10-14014 October 1997 Insp Repts 50-282/97-12 & 50-306/97-12 on 970519-1001. Violations Noted.Major Areas Inspected:Fire Protection Program & Several App R Issues IR 05000282/19970171997-10-0404 October 1997 Insp Repts 50-282/97-17,50-306/97-17 & 72-0010/97-17 on 970825-29 & 970908-12.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program IR 05000282/19970161997-09-25025 September 1997 Insp Repts 50-282/97-16,50-306/97-16 & 72-0010/97-16 on 970806-0909.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000282/19970151997-09-19019 September 1997 Insp Repts 50-282/97-15,50-306/97-15 & 72-0010/97-15 on 970626-0805.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000282/19970141997-08-21021 August 1997 Insp Repts 50-282/97-14 & 50-306/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program,W/Emphasis on Listed Areas ML20151J8381997-07-24024 July 1997 Insp Repts 50-282/97-11 & 50-306/97-11 on 970514-0625. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19970131997-07-18018 July 1997 Security Insp Repts 50-282/97-13 & 50-306/97-13 on 970602-06.No Violations Noted.Major Areas Inspected:Physical Security Program ML20149F3191997-07-16016 July 1997 Insp Repts 50-282/97-08 & 50-306/97-08 on 970414-0613. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering for AFW Sys & Parts of Control Room Ventilation IR 05000282/19970101997-07-0101 July 1997 Insp Repts 50-282/97-10 & 50-306/97-10 on 970519-29.No Violations Noted.Major Areas Inspected:Ep Program,Including Emergency Response Facilities,Equipment & Supplies IR 05000282/19970091997-06-0202 June 1997 Insp Repts 50-282/97-09,50-306/97-09 & 72-0010/97-09 on 970405-0513.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000282/19970051997-05-0101 May 1997 Insp Repts 50-282/97-05,50-306/97-05 & 72-0010/97-05 on 970221-0404.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support ML20138H1011997-04-30030 April 1997 Insp Repts 50-282/97-07 & 50-306/97-07 on 970407-08 & 970416.No Violations Noted.Major Areas Inspected:Review of Vehicle Barrier System 1999-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000282/19990141999-10-19019 October 1999 Insp Repts 50-282/99-14 & 50-306/99-14 on 990920-22. Violations Noted.Major Areas Inspected:Heat Sink Performance IR 05000282/19990121999-10-0606 October 1999 Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000282/19990071999-09-28028 September 1999 Insp Repts 50-282/99-07 & 50-306/99-07 on 990721-0831. Non-cited Violations Noted.Major Areas Inspected:Followup Y2K Readiness Review IR 05000282/19990101999-09-10010 September 1999 Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12. Non-cited Violations Noted.Major Areas Inspected:Physical Protection Cornerstone,Within Safeguards Strategic Assessment Area IR 05000282/19990111999-09-0909 September 1999 Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.NCV Noted.Major Areas Inspected:Public Radiation Safety & Included Review of Performance Indicators for Occupational & Public Radiation Safety IR 05000282/19990091999-08-17017 August 1999 Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22. Violations Noted.Major Areas Inspected:Reactor Safety, Emergency Preparedness & Review of Performance Indicators for Reactor Safety & Emergency Preparedness IR 05000282/19990061999-08-12012 August 1999 Insp Repts 50-282/99-06 & 50-306/99-06 on 990601-0720.One NCV Occurred.Major Areas Inspected:Activities Related to Reactor Safety,Verification of Performance Indicators,Event Followup & Compliance with Commission Rules & Regulations IR 05000282/19990041999-06-30030 June 1999 Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19990051999-05-25025 May 1999 Insp Repts 50-282/99-05 & 50-306/99-05 on 990426-30.No Violations Noted.Major Areas Inspected:Review of Licensee Radiation Protection Performance During Unit 1 Refueling Outage,Shutdown Chemistry & Crud Burst IR 05000282/19990021999-05-0404 May 1999 Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07200010/19990011999-04-29029 April 1999 Insp Rept 72-0010/99-01 on 990308-0413.No Violations Noted. Major Areas Inspected:Direct Observation of Various Portions of Loading of Eighth & Ninth Dry Fuel Storage Casks from SFP to ISFSI Located Away from Main Protected Area of Site IR 05000282/19990031999-04-16016 April 1999 Insp Repts 50-282/99-03 & 50-306/99-03 on 990322-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000282/19990011999-03-18018 March 1999 Insp Repts 50-282/99-01 & 50-306/99-01 on 990115-0225.No Violations Noted:Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19980231999-01-29029 January 1999 Insp Repts 50-282/98-23 & 50-306/98-23 on 981204-990114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980201998-12-18018 December 1998 Insp Repts 50-282/98-20 & 50-306/98-20 on 981023-1203.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000306/19980211998-12-17017 December 1998 Insp Rept 50-306/98-21 on 981116-24.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage Cycle 19 IR 05000282/19980221998-12-0101 December 1998 Insp Repts 50-282/98-22 & 50-306/98-22 on 981116-20.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Performance During Unit 2 Refueling Outage IR 05000282/19980181998-11-18018 November 1998 Insp Repts 50-282/98-18 & 50-306/98-18 on 980911-1022.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980191998-10-29029 October 1998 Insp Repts 50-282/98-19 & 50-306/98-19 on 981013-16.No Violations Noted.Major Areas Inspected:Review of Chemistry Program Re Plant Water Quality & Analytical Capabilities ML20154J9881998-10-0909 October 1998 Insp Repts 50-282/98-16 & 50-306/99-16 on 980810-28. Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected:Review of Fire Protection Project self- Assessment IR 05000282/19980151998-10-0909 October 1998 Insp Repts 50-282/98-15 & 50-306/98-15 on 980731-0910. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000282/19980131998-08-21021 August 1998 Insp Repts 50-282/98-13 & 50-306/98-13 on 980727-31.No Violations Noted.Major Areas Inspected:Review of Physical Security Program IR 05000282/19980091998-08-19019 August 1998 Insp Repts 50-282/98-09 & 50-306/98-09 on 980619-0730.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980121998-08-14014 August 1998 Insp Repts 50-282/98-12 & 50-306/98-12 on 980720-24.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000282/19980141998-08-11011 August 1998 Insp Repts 50-282/98-14 & 50-306/98-14 on 980720-24.No Violations Noted.Major Areas Inspected:Review of Pcp,Storage & Processing of Solid Radwaste & Shipment & Disposal of Radioactive Matl ML20236P0111998-07-10010 July 1998 Insp Repts 50-282/98-10 & 50-306/98-10 on 980605-12. Violations Noted.Major Areas inspected:on-site Insp Into Circumstances Surrounding Unit 1 Rt Due to Dropped CR & Actions Taken for Recovery to Safe Shutdown on 980605 ML20236G9011998-06-28028 June 1998 Insp Repts 50-282/98-08 & 50-306/98-08 on 980512-0618.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980071998-06-0505 June 1998 Insp Repts 50-282/98-07 & 50-306/98-07 on 980329-0511. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000282/19980061998-05-26026 May 1998 Insp Repts 50-282/98-06 & 50-306/98-06 on 980330-0409.No Violations Noted.Major Areas Inspected:Conduct of Operations Which Included Continuous 72 H Period of Control Room Observation IR 05000282/19980051998-04-0606 April 1998 Insp Repts 50-282/98-05 & 50-306/98-05 on 980225-0328.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000282/19980041998-04-0101 April 1998 Insp Repts 50-282/98-04 & 50-306/98-04 on 980210-13 & 0316-20.No Violations Noted.Major Areas Inspected:Rp Performance During Unit 1 Refueling Outage & Unit 2 Forced Outage,Calibration of Radiation Monitoring Sys ML20216E4841998-03-12012 March 1998 Insp Repts 50-282/98-03 & 50-306/98-03 on 980114-0224. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20202C0581998-01-30030 January 1998 Insp Repts 50-282/97-23 & 50-306/97-23 on 971203-980113. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20198A4441997-12-23023 December 1997 Insp Repts 50-282/97-19 & 50-306/97-19 on 970929-1003,21-23 & 1202.Violations Noted.Major Areas Inspected:Licensed Reactor Operator & SRO Requalification Training Program IR 05000282/19970211997-12-15015 December 1997 Insp Repts 50-282/97-21 & 50-306/97-21 on 971022-1202.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19970201997-12-0505 December 1997 Insp Rept 50-282/97-20 on 971026-30 & 1117-19.No Violations Noted.Major Areas Inspected:Licensee Steam Generator Insp Program IR 05000282/19970221997-11-24024 November 1997 Insp Repts 50-282/97-22 & 50-306/97-22 on 971028-31.No Violations Noted.Major Areas Inspected:Plant Support Performance Re Refueling Outage,Surveys to Unconditionally Release Turbine Components & Shut Down Chemistry IR 05000282/19970181997-11-14014 November 1997 Insp Repts 50-282/97-18 & 50-306/97-18 on 970910-971021.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19970121997-10-14014 October 1997 Insp Repts 50-282/97-12 & 50-306/97-12 on 970519-1001. Violations Noted.Major Areas Inspected:Fire Protection Program & Several App R Issues IR 05000282/19970171997-10-0404 October 1997 Insp Repts 50-282/97-17,50-306/97-17 & 72-0010/97-17 on 970825-29 & 970908-12.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program IR 05000282/19970161997-09-25025 September 1997 Insp Repts 50-282/97-16,50-306/97-16 & 72-0010/97-16 on 970806-0909.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000282/19970151997-09-19019 September 1997 Insp Repts 50-282/97-15,50-306/97-15 & 72-0010/97-15 on 970626-0805.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000282/19970141997-08-21021 August 1997 Insp Repts 50-282/97-14 & 50-306/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program,W/Emphasis on Listed Areas ML20151J8381997-07-24024 July 1997 Insp Repts 50-282/97-11 & 50-306/97-11 on 970514-0625. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19970131997-07-18018 July 1997 Security Insp Repts 50-282/97-13 & 50-306/97-13 on 970602-06.No Violations Noted.Major Areas Inspected:Physical Security Program ML20149F3191997-07-16016 July 1997 Insp Repts 50-282/97-08 & 50-306/97-08 on 970414-0613. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering for AFW Sys & Parts of Control Room Ventilation IR 05000282/19970101997-07-0101 July 1997 Insp Repts 50-282/97-10 & 50-306/97-10 on 970519-29.No Violations Noted.Major Areas Inspected:Ep Program,Including Emergency Response Facilities,Equipment & Supplies IR 05000282/19970091997-06-0202 June 1997 Insp Repts 50-282/97-09,50-306/97-09 & 72-0010/97-09 on 970405-0513.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000282/19970051997-05-0101 May 1997 Insp Repts 50-282/97-05,50-306/97-05 & 72-0010/97-05 on 970221-0404.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support ML20138H1011997-04-30030 April 1997 Insp Repts 50-282/97-07 & 50-306/97-07 on 970407-08 & 970416.No Violations Noted.Major Areas Inspected:Review of Vehicle Barrier System 1999-09-09
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000282/19990141999-10-19019 October 1999 Insp Repts 50-282/99-14 & 50-306/99-14 on 990920-22. Violations Noted.Major Areas Inspected:Heat Sink Performance IR 05000282/19990121999-10-0606 October 1999 Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000282/19990071999-09-28028 September 1999 Insp Repts 50-282/99-07 & 50-306/99-07 on 990721-0831. Non-cited Violations Noted.Major Areas Inspected:Followup Y2K Readiness Review IR 05000282/19990101999-09-10010 September 1999 Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12. Non-cited Violations Noted.Major Areas Inspected:Physical Protection Cornerstone,Within Safeguards Strategic Assessment Area IR 05000282/19990111999-09-0909 September 1999 Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.NCV Noted.Major Areas Inspected:Public Radiation Safety & Included Review of Performance Indicators for Occupational & Public Radiation Safety IR 05000282/19990091999-08-17017 August 1999 Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22. Violations Noted.Major Areas Inspected:Reactor Safety, Emergency Preparedness & Review of Performance Indicators for Reactor Safety & Emergency Preparedness IR 05000282/19990061999-08-12012 August 1999 Insp Repts 50-282/99-06 & 50-306/99-06 on 990601-0720.One NCV Occurred.Major Areas Inspected:Activities Related to Reactor Safety,Verification of Performance Indicators,Event Followup & Compliance with Commission Rules & Regulations IR 05000282/19990041999-06-30030 June 1999 Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19990051999-05-25025 May 1999 Insp Repts 50-282/99-05 & 50-306/99-05 on 990426-30.No Violations Noted.Major Areas Inspected:Review of Licensee Radiation Protection Performance During Unit 1 Refueling Outage,Shutdown Chemistry & Crud Burst IR 05000282/19990021999-05-0404 May 1999 Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07200010/19990011999-04-29029 April 1999 Insp Rept 72-0010/99-01 on 990308-0413.No Violations Noted. Major Areas Inspected:Direct Observation of Various Portions of Loading of Eighth & Ninth Dry Fuel Storage Casks from SFP to ISFSI Located Away from Main Protected Area of Site IR 05000282/19990031999-04-16016 April 1999 Insp Repts 50-282/99-03 & 50-306/99-03 on 990322-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000282/19990011999-03-18018 March 1999 Insp Repts 50-282/99-01 & 50-306/99-01 on 990115-0225.No Violations Noted:Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19980231999-01-29029 January 1999 Insp Repts 50-282/98-23 & 50-306/98-23 on 981204-990114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980201998-12-18018 December 1998 Insp Repts 50-282/98-20 & 50-306/98-20 on 981023-1203.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000306/19980211998-12-17017 December 1998 Insp Rept 50-306/98-21 on 981116-24.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage Cycle 19 IR 05000282/19980221998-12-0101 December 1998 Insp Repts 50-282/98-22 & 50-306/98-22 on 981116-20.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Performance During Unit 2 Refueling Outage IR 05000282/19980181998-11-18018 November 1998 Insp Repts 50-282/98-18 & 50-306/98-18 on 980911-1022.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980191998-10-29029 October 1998 Insp Repts 50-282/98-19 & 50-306/98-19 on 981013-16.No Violations Noted.Major Areas Inspected:Review of Chemistry Program Re Plant Water Quality & Analytical Capabilities ML20154J9881998-10-0909 October 1998 Insp Repts 50-282/98-16 & 50-306/99-16 on 980810-28. Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected:Review of Fire Protection Project self- Assessment IR 05000282/19980151998-10-0909 October 1998 Insp Repts 50-282/98-15 & 50-306/98-15 on 980731-0910. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000282/19980131998-08-21021 August 1998 Insp Repts 50-282/98-13 & 50-306/98-13 on 980727-31.No Violations Noted.Major Areas Inspected:Review of Physical Security Program IR 05000282/19980091998-08-19019 August 1998 Insp Repts 50-282/98-09 & 50-306/98-09 on 980619-0730.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980121998-08-14014 August 1998 Insp Repts 50-282/98-12 & 50-306/98-12 on 980720-24.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000282/19980141998-08-11011 August 1998 Insp Repts 50-282/98-14 & 50-306/98-14 on 980720-24.No Violations Noted.Major Areas Inspected:Review of Pcp,Storage & Processing of Solid Radwaste & Shipment & Disposal of Radioactive Matl ML20236P0111998-07-10010 July 1998 Insp Repts 50-282/98-10 & 50-306/98-10 on 980605-12. Violations Noted.Major Areas inspected:on-site Insp Into Circumstances Surrounding Unit 1 Rt Due to Dropped CR & Actions Taken for Recovery to Safe Shutdown on 980605 ML20236G9011998-06-28028 June 1998 Insp Repts 50-282/98-08 & 50-306/98-08 on 980512-0618.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980071998-06-0505 June 1998 Insp Repts 50-282/98-07 & 50-306/98-07 on 980329-0511. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000282/19980061998-05-26026 May 1998 Insp Repts 50-282/98-06 & 50-306/98-06 on 980330-0409.No Violations Noted.Major Areas Inspected:Conduct of Operations Which Included Continuous 72 H Period of Control Room Observation IR 05000282/19980051998-04-0606 April 1998 Insp Repts 50-282/98-05 & 50-306/98-05 on 980225-0328.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000282/19980041998-04-0101 April 1998 Insp Repts 50-282/98-04 & 50-306/98-04 on 980210-13 & 0316-20.No Violations Noted.Major Areas Inspected:Rp Performance During Unit 1 Refueling Outage & Unit 2 Forced Outage,Calibration of Radiation Monitoring Sys ML20216E4841998-03-12012 March 1998 Insp Repts 50-282/98-03 & 50-306/98-03 on 980114-0224. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20202C0581998-01-30030 January 1998 Insp Repts 50-282/97-23 & 50-306/97-23 on 971203-980113. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20198A4441997-12-23023 December 1997 Insp Repts 50-282/97-19 & 50-306/97-19 on 970929-1003,21-23 & 1202.Violations Noted.Major Areas Inspected:Licensed Reactor Operator & SRO Requalification Training Program IR 05000282/19970211997-12-15015 December 1997 Insp Repts 50-282/97-21 & 50-306/97-21 on 971022-1202.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19970201997-12-0505 December 1997 Insp Rept 50-282/97-20 on 971026-30 & 1117-19.No Violations Noted.Major Areas Inspected:Licensee Steam Generator Insp Program IR 05000282/19970221997-11-24024 November 1997 Insp Repts 50-282/97-22 & 50-306/97-22 on 971028-31.No Violations Noted.Major Areas Inspected:Plant Support Performance Re Refueling Outage,Surveys to Unconditionally Release Turbine Components & Shut Down Chemistry IR 05000282/19970181997-11-14014 November 1997 Insp Repts 50-282/97-18 & 50-306/97-18 on 970910-971021.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19970121997-10-14014 October 1997 Insp Repts 50-282/97-12 & 50-306/97-12 on 970519-1001. Violations Noted.Major Areas Inspected:Fire Protection Program & Several App R Issues IR 05000282/19970171997-10-0404 October 1997 Insp Repts 50-282/97-17,50-306/97-17 & 72-0010/97-17 on 970825-29 & 970908-12.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program IR 05000282/19970161997-09-25025 September 1997 Insp Repts 50-282/97-16,50-306/97-16 & 72-0010/97-16 on 970806-0909.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000282/19970151997-09-19019 September 1997 Insp Repts 50-282/97-15,50-306/97-15 & 72-0010/97-15 on 970626-0805.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000282/19970141997-08-21021 August 1997 Insp Repts 50-282/97-14 & 50-306/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program,W/Emphasis on Listed Areas ML20151J8381997-07-24024 July 1997 Insp Repts 50-282/97-11 & 50-306/97-11 on 970514-0625. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19970131997-07-18018 July 1997 Security Insp Repts 50-282/97-13 & 50-306/97-13 on 970602-06.No Violations Noted.Major Areas Inspected:Physical Security Program ML20149F3191997-07-16016 July 1997 Insp Repts 50-282/97-08 & 50-306/97-08 on 970414-0613. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering for AFW Sys & Parts of Control Room Ventilation IR 05000282/19970101997-07-0101 July 1997 Insp Repts 50-282/97-10 & 50-306/97-10 on 970519-29.No Violations Noted.Major Areas Inspected:Ep Program,Including Emergency Response Facilities,Equipment & Supplies IR 05000282/19970091997-06-0202 June 1997 Insp Repts 50-282/97-09,50-306/97-09 & 72-0010/97-09 on 970405-0513.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000282/19970051997-05-0101 May 1997 Insp Repts 50-282/97-05,50-306/97-05 & 72-0010/97-05 on 970221-0404.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support ML20138H1011997-04-30030 April 1997 Insp Repts 50-282/97-07 & 50-306/97-07 on 970407-08 & 970416.No Violations Noted.Major Areas Inspected:Review of Vehicle Barrier System 1999-09-09
[Table view] Category:UTILITY
MONTHYEARIR 05000306/19900151990-11-0202 November 1990 Safety Insp Rept 50-306/90-15 on 900904-05,17-19 & 1029.No Violations Noted.Major Areas Inspected:Review of Programs, Procedures,Observation of Work Activities & Data Review IR 05000282/19900141990-11-0101 November 1990 Insp Repts 50-282/90-14 & 50-306/90-14 on 900814-0924.Notice of Violation Not Issued for Licensee Identified Violations. Major Areas Inspected:Licensee Action on Previous Items, Plant Operational Safety,Maint & Surveillance IR 05000282/19900151990-10-25025 October 1990 Insp Repts 50-282/90-15 & 50-306/90-16 on 900917-1005.No Violations Noted.Major Areas Inspected:Design Changes & Mods IR 05000282/19900121990-08-27027 August 1990 Insp Repts 50-282/90-12 & 50-306/90-12 on 900703-0813. Violations Noted.Major Areas Inspected:Plant Operational Safety,Maint,Surveillance,Regional Initiatives,Lers & Previous Insp Items IR 05000282/19890221989-08-31031 August 1989 Insp Repts 50-282/89-22 & 50-306/89-22 on 890814-18.No Violations or Deviations Noted.Major Areas Inspected: Implementation of the ATWS Rule,Including Design, Installation & Testing of ATWS Mitigation Actuation Sys IR 05000282/19890201989-08-28028 August 1989 Insp Repts 50-282/89-20 & 50-306/89-20 on 890702-0812.No Violations Noted.Major Areas Inspected:Followup of LERs & Generic Ltrs,Plant Operational Safety,Maint,Surveillance & Miscellaneous Licensing Matters IR 05000282/19890181989-07-13013 July 1989 Insp Repts 50-282/89-18 & 50-306/89-18 on 890528-0701. Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillances,Esf Sys,Security,Qa Programs,& Followup of LERs & Generic Ltrs IR 05000282/19890191989-07-0606 July 1989 Enforcement Conference Insp Repts 50-282/89-19 & 50-306/89-19 on 890608.Major Areas Discussed:Actions Taken to Determine That Commercial Grade Components Discussed on Pages 4-6 of Vendor Branch Insp Rept 50-282/88-200 IR 05000282/19890041989-06-21021 June 1989 Insp Repts 50-282/89-04 & 50-306/89-04 on 890604-08.No Violations,Deviations,Deficiencies or Open Items Noted.Major Areas Inspected:Emergency Preparedness Exercise & Followup on Previously Identified Items IR 05000282/19890171989-06-20020 June 1989 Insp Repts 50-282/89-17 & 50-306/89-17 on 890416-0526. Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillances,Esf Sys,Security,Qa Programs & Followup of LERs & Generic Ltrs IR 05000282/19890101989-06-0606 June 1989 Insp Repts 50-282/89-10 & 50-306/89-11 on 890411-13.No Violations Noted.Major Areas Inspected:Plant Design Changes & Mod Program Improvement in Light of Issues Identified in Monticello Insps.Some Corrective Measures Not Timely IR 05000282/19890111989-05-12012 May 1989 Partially Withheld Insp Rept 50-282/89-11 on 890404-05 & 24- 27.(ref 10CFR73.21 & 2.790).No Violations Noted.Major Areas Inspected:Protected & Vital Area Physical Barriers,Detection & Assessment Aids,& Security Training/Qualification IR 05000282/19890141989-05-0404 May 1989 Insp Repts 50-282/89-14 & 50-306/89-15 on 890417-21 & 27. Violations Noted.Major Areas Inspected:Containment Integrated Leak Rate Test Procedure,Containment Integrated Leak Rate Test Result Review & Local Leak Rate Test Program IR 05000282/19890081989-05-0202 May 1989 Partially Withheld Insp Repts 50-282/89-08 & 50-306/89-08 on 890305-0415 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Operational Safety,Maint,Security,Refueling & Temporary Instructions IR 05000306/19890101989-05-0101 May 1989 Insp Rept 50-306/89-10 on 890403-06 & 24.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Activities,Including Review of Program,Procedures, Observation of Work Activities & Data Review IR 05000282/19890091989-04-27027 April 1989 Insp Repts 50-282/89-09 & 50-306/89-09 on 890403-17.No Violations Noted.Major Areas Inspected:Radwaste/ Transportation Program,Including,Organization & Mgt Control, Training & Qualifications,Gaseous Radwaste & Solid Radwaste IR 05000282/19890071989-03-30030 March 1989 Insp Repts 50-282/89-07 & 50-306/89-07 on 890306-10.No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training & Primary & Secondary Sys Water QC Programs IR 05000282/19890031989-03-28028 March 1989 Insp Repts 50-282/89-03 & 50-306/89-03 on 890129-0309.No Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillances,Esf Sys,Security,Qa Programs & Followup of LERs IR 05000282/19880181988-11-30030 November 1988 Insp Repts 50-282/88-18 & 50-306/88-18 on 880919-22.No Violations Noted.Major Areas Inspected:Concerns Associated W/Allegation RIII-A-0111 IR 05000282/19880161988-11-17017 November 1988 Insp Repts 50-282/88-16 & 50-306/88-16 on 880916-1026. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Containment Integrated Leak Rate Test (Cilrt) & Cilrt Performance Witnessing & Results Review IR 05000282/19880201988-10-26026 October 1988 Insp Repts 50-282/88-20 & 50-306/88-20 on 881003-07.No Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training & Verification of Commitments Made by Licensee Re Generation Test Items IR 05000282/19880141988-10-17017 October 1988 Insp Repts 50-282/88-14 & 50-306/88-14 on 880807-0924.No Violations Noted.Major Areas Inspected:Plant Operational Safety,Maint,Surveillances,Esf Sys,Ler Followup,Refueling Activities & Closeout of Temporary Instructions IR 05000282/19880171988-10-11011 October 1988 Insp Repts 50-282/88-17 & 50-306/88-17 on 880921-22. Violations Noted.Major Areas Inspected:Facility Mods Resulting from Ongoing Review of IE Bulletin 79-14 & Licensee Actions on Previous Insp Findings IR 05000282/19880151988-09-19019 September 1988 Insp Rept 50-282/88-15 on 880901-02 & 15-16.No Violations Noted.Major Areas Inspected:Inservice Insp Activities IR 05000282/19880121988-08-22022 August 1988 Insp Repts 50-282/88-12 & 50-306/88-12 on 880625-0806. Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillances,Esf Sys,Ler Followup & Preparation for Refueling IR 05000282/19880131988-08-19019 August 1988 Insp Repts 50-282/88-13 & 50-306/88-13 on 880718-22.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Insp Findings Re App R & Fire Brigade Annual Training Program IR 05000282/19880111988-08-0404 August 1988 Insp Repts 50-282/88-11 & 50-306/88-11 on 880620-23 & 0711- 15.No Violations Noted.Major Areas Inspected:Licensee Activities Re IE Bulletin 85-003, Motor-Operated Valve Common Mode Failure During Plant Transients Due To.. IR 05000282/19880061988-07-11011 July 1988 Insp Repts 50-282/88-06 & 50-306/88-06 on 880622-24.No Violations,Deficiencies or Deviations Noted.Major Areas Inspected:Emergency Preparedness Exercise IR 05000282/19880101988-07-11011 July 1988 Insp Repts 50-282/88-10 & 50-306/88-10 on 880606-21. Violations Noted.Major Areas Inspected:Verification That Emergency Operating Procedures Technically Correct & Specified Actions Accomplished Using Existing Equipment IR 05000282/19880081988-07-0707 July 1988 Insp Repts 50-282/88-08 & 50-306/88-08 on 880515-0625.No Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillances,Esf Sys,Ler Followup & Spent Fuel Pool Activities IR 05000282/19880091988-06-30030 June 1988 Insp Repts 50-282/88-09 & 50-306/88-09 on 880526-0617.No Violations or Deviations Noted.Major Areas Inspected:Action on Previously Identified Concerns Re Piping Operability Analysis IR 05000282/19880071988-06-15015 June 1988 Partially Withheld Physical Security Insp Repts 50-282/88-07 & 50-306/88-07 on 880523-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Testing & Maint & Locks & Keys IR 05000282/19880051988-06-0101 June 1988 Insp Repts 50-282/88-05 & 50-306/88-05 on 880403-0514. Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillance,Esf Sys & Licensed Operator Training IR 05000282/19880041988-04-18018 April 1988 Insp Repts 50-282/88-04 & 50-306-88-04 on 880214-0402. Violation Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillances,Esf Sys,Ler Followup & Compliance Bulletin Followup IR 05000282/19870181988-03-18018 March 1988 Insp Repts 50-282/87-18 & 50-306/87-17 on 871216-880308.No Violations or Deviations Noted.Major Areas Inspected: Activities on IE Bulletin 79-14 & Licensee Action on Previously Identified Items IR 05000282/19880031988-02-18018 February 1988 Special Safety Insp Repts 50-282/88-03 & 50-306/88-02 on 880120-0210.No Violations or Deviations Noted.Major Areas Inspected:Verification of Implementation of Actions Described in Amend 1 to Confirmatory Action Ltr RIII-87-13 IR 05000282/19870171988-01-15015 January 1988 Insp Repts 50-282/87-17 & 50-306/87-16 on 871115-880102.No Violations or Deviations Noted.Major Areas Inspected:Plant Operational Safety,Maint,Surveillances,Esf Sys,Preparation for Refueling,Training,Followup of LERs & Staff Changes IR 05000282/19870161987-12-29029 December 1987 Safety Insp Repts 50-282/87-16 & 50-306/87-15 on 871004-1114.Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillances, Spent Fuel Pool Activities & Meetings W/Corporate Mgt IR 05000282/19870141987-10-20020 October 1987 Insp Repts 50-282/87-14 & 50-306/87-13 on 870823-1003.No Violations Noted.Major Areas Inspected:Plant Operational Safety,Maint,Surveillances,Esf Sys,Cooling Water Sys Difficulties,Spent Fuel Pool Activities & LER Followup IR 05000282/19870151987-10-0909 October 1987 Insp Repts 50-282/87-15 & 50-306/87-14 on 870831-0924.No Violations or Deviations Noted.Major Areas Inspected: Implementation of Generic Ltr 83-28 in Areas of Equipment Classification,Vendor Interface & post-maint Testing IR 05000282/19870121987-09-0404 September 1987 Insp Repts 50-282/87-12 & 50-306/87-11 on 870712-0822.Three Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillances,Esf Sys,Facility Mods,Fire Protection & Training IR 05000282/19870131987-09-0202 September 1987 Insp Repts 50-282/87-13 & 50-306/87-12 on 870803-06.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on IE Bulletin 79-02 Pipe Support Baseplate Design (& Const) of Concrete Expansion Anchor Bolts IR 05000282/19870091987-07-28028 July 1987 Insp Repts 50-282/87-09 & 50-306/87-09 on 870531-0711.No Violations Noted.Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operational Safety Verification,Maint Observations & Emergency Plan Exercise IR 05000282/19870111987-07-0808 July 1987 Safety Insp Rept 50-282/87-11 on 870618-0702.One Apparent Violation Noted Re Inoperability of Safety Injection Pump. Major Areas Inspected:Failure of Safety Injection Pump 11 to Start During Testing on 870618 IR 05000282/19870081987-06-17017 June 1987 Insp Repts 50-282/87-08 & 50-306/87-08 on 870520.No Violations Noted.Major Areas Inspected:Licensee Action to Determine Cause of Emergency Generator D2 Lower Crankshaft Thrust Bearing Failure & Plan to Monitor Bearings IR 05000282/19870051987-06-16016 June 1987 Insp Repts 50-282/87-05 & 50-306/87-05 on 870419-0530.No Violations Noted.Major Areas Inspected:Previous Insp Findings,Plant Operational Safety,Maint,Surveillances,Esf Sys,Refueling,Facility Mods,Training & Followup on LERs IR 05000263/19870081987-06-0808 June 1987 Mgt Meeting Repts 50-263/87-08,50-282/87-10 & 50-306/87-10 on 870526.Areas Discussed:Operator Licensing Program Implementation & Methods to Improve Performance in Operator Licensing IR 05000282/19870071987-06-0505 June 1987 Partially Withheld Insp Repts 50-282/87-07 & 50-306/87-07 on 870511-15 (Ref 10CFR73.21).No Noncompliance Noted.One Open Item Identified Re Physical Location of Alarm Station.Major Areas Inspected:Mgt Effectiveness & Security Organization IR 05000282/19870031987-04-30030 April 1987 Insp Repts 50-282/87-03 & 50-306/87-03 on 870215-0418. Violations Noted:Both Shield Bldg Maint Airlock Doors Found Open W/Reactor Coolant Temp Greater than 200 F & No Conditions of Tech Spec 3.6 Satisfied IR 05000282/19870041987-04-15015 April 1987 Insp Repts 50-282/87-04 & 50-306/87-04 on 870302-06. Violations Identified:Lack of Breaker Coordination,Redundant Fusing Re Associated Circuits & Emergency Lighting Units in Two Plant Areas 1990-08-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000282/19990141999-10-19019 October 1999 Insp Repts 50-282/99-14 & 50-306/99-14 on 990920-22. Violations Noted.Major Areas Inspected:Heat Sink Performance IR 05000282/19990121999-10-0606 October 1999 Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000282/19990071999-09-28028 September 1999 Insp Repts 50-282/99-07 & 50-306/99-07 on 990721-0831. Non-cited Violations Noted.Major Areas Inspected:Followup Y2K Readiness Review IR 05000282/19990101999-09-10010 September 1999 Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12. Non-cited Violations Noted.Major Areas Inspected:Physical Protection Cornerstone,Within Safeguards Strategic Assessment Area IR 05000282/19990111999-09-0909 September 1999 Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.NCV Noted.Major Areas Inspected:Public Radiation Safety & Included Review of Performance Indicators for Occupational & Public Radiation Safety IR 05000282/19990091999-08-17017 August 1999 Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22. Violations Noted.Major Areas Inspected:Reactor Safety, Emergency Preparedness & Review of Performance Indicators for Reactor Safety & Emergency Preparedness IR 05000282/19990061999-08-12012 August 1999 Insp Repts 50-282/99-06 & 50-306/99-06 on 990601-0720.One NCV Occurred.Major Areas Inspected:Activities Related to Reactor Safety,Verification of Performance Indicators,Event Followup & Compliance with Commission Rules & Regulations IR 05000282/19993011999-07-0202 July 1999 NRC Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) (Including Completed & Graded Tests) for Tests Administered During Week of 990517-21.Two Applicants Passed All Sections of Exam & Were Issued Licenses IR 05000282/19990041999-06-30030 June 1999 Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19990051999-05-25025 May 1999 Insp Repts 50-282/99-05 & 50-306/99-05 on 990426-30.No Violations Noted.Major Areas Inspected:Review of Licensee Radiation Protection Performance During Unit 1 Refueling Outage,Shutdown Chemistry & Crud Burst IR 05000282/19990021999-05-0404 May 1999 Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07200010/19990011999-04-29029 April 1999 Insp Rept 72-0010/99-01 on 990308-0413.No Violations Noted. Major Areas Inspected:Direct Observation of Various Portions of Loading of Eighth & Ninth Dry Fuel Storage Casks from SFP to ISFSI Located Away from Main Protected Area of Site IR 05000282/19990031999-04-16016 April 1999 Insp Repts 50-282/99-03 & 50-306/99-03 on 990322-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000282/19990011999-03-18018 March 1999 Insp Repts 50-282/99-01 & 50-306/99-01 on 990115-0225.No Violations Noted:Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19980231999-01-29029 January 1999 Insp Repts 50-282/98-23 & 50-306/98-23 on 981204-990114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support PNO-III-99-001, on 990105,Unit 1 Station Auxiliary Transformer Exploded Ignited Oil Fire.Fire Extinguished within 15 Minutes by Onsite Fire Brigade.Unit 2 Operating at 60 Percent Power,Was Not Affected by Explosion & Fire1999-01-0606 January 1999 PNO-III-99-001:on 990105,Unit 1 Station Auxiliary Transformer Exploded Ignited Oil Fire.Fire Extinguished within 15 Minutes by Onsite Fire Brigade.Unit 2 Operating at 60 Percent Power,Was Not Affected by Explosion & Fire IR 05000282/19980201998-12-18018 December 1998 Insp Repts 50-282/98-20 & 50-306/98-20 on 981023-1203.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000306/19980211998-12-17017 December 1998 Insp Rept 50-306/98-21 on 981116-24.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage Cycle 19 IR 05000282/19980221998-12-0101 December 1998 Insp Repts 50-282/98-22 & 50-306/98-22 on 981116-20.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Performance During Unit 2 Refueling Outage IR 05000282/19980181998-11-18018 November 1998 Insp Repts 50-282/98-18 & 50-306/98-18 on 980911-1022.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-III-98-051, on 981029,Prairie Island Unit 1 Automatically Tripped from 100 Percent Power Due to Negative Flux Rate Reactor Flux Rate Trip Signal.Nrc Resident Inspectors Are Monitoring Licensee Investigation & Repair Activities1998-11-0202 November 1998 PNO-III-98-051:on 981029,Prairie Island Unit 1 Automatically Tripped from 100 Percent Power Due to Negative Flux Rate Reactor Flux Rate Trip Signal.Nrc Resident Inspectors Are Monitoring Licensee Investigation & Repair Activities IR 05000282/19980191998-10-29029 October 1998 Insp Repts 50-282/98-19 & 50-306/98-19 on 981013-16.No Violations Noted.Major Areas Inspected:Review of Chemistry Program Re Plant Water Quality & Analytical Capabilities IR 05000282/19980151998-10-0909 October 1998 Insp Repts 50-282/98-15 & 50-306/98-15 on 980731-0910. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20154M0691998-10-0909 October 1998 Notice of Violation from Insp on 980731-0910.Violation Noted:On 980901,maint Workers Failed to Follow Procedural Requirements,Of Sp 1180.2,Rev 8,Steps 7 & 8,when Workers Did Not Gain Access to Both Sides of Filter Bank ML20154J9881998-10-0909 October 1998 Insp Repts 50-282/98-16 & 50-306/99-16 on 980810-28. Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected:Review of Fire Protection Project self- Assessment IR 05000282/19980131998-08-21021 August 1998 Insp Repts 50-282/98-13 & 50-306/98-13 on 980727-31.No Violations Noted.Major Areas Inspected:Review of Physical Security Program IR 05000282/19980091998-08-19019 August 1998 Insp Repts 50-282/98-09 & 50-306/98-09 on 980619-0730.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980121998-08-14014 August 1998 Insp Repts 50-282/98-12 & 50-306/98-12 on 980720-24.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000282/19980141998-08-11011 August 1998 Insp Repts 50-282/98-14 & 50-306/98-14 on 980720-24.No Violations Noted.Major Areas Inspected:Review of Pcp,Storage & Processing of Solid Radwaste & Shipment & Disposal of Radioactive Matl ML20236N9941998-07-10010 July 1998 Notice of Violation from Insp on 980605-12.Violation Noted: on 980605,emergency Operating Procedure 1ES-0.1,rev 13 Lacked Adequate Guidance for Dumping Steam Using SG Power Operated Relief Valves W/Ms Isolation Valves Closed ML20236P0111998-07-10010 July 1998 Insp Repts 50-282/98-10 & 50-306/98-10 on 980605-12. Violations Noted.Major Areas inspected:on-site Insp Into Circumstances Surrounding Unit 1 Rt Due to Dropped CR & Actions Taken for Recovery to Safe Shutdown on 980605 ML20236G9011998-06-28028 June 1998 Insp Repts 50-282/98-08 & 50-306/98-08 on 980512-0618.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-III-98-032, on 980605,unit 1 Experienced Automatic Reactor Trip When Control Rod Dropped Into Reactor Core. Caused by Blown Fuse on Stationary Gripper Coil Due to Ground in Wiring to Coil1998-06-0909 June 1998 PNO-III-98-032:on 980605,unit 1 Experienced Automatic Reactor Trip When Control Rod Dropped Into Reactor Core. Caused by Blown Fuse on Stationary Gripper Coil Due to Ground in Wiring to Coil IR 05000282/19980071998-06-0505 June 1998 Insp Repts 50-282/98-07 & 50-306/98-07 on 980329-0511. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20248M1341998-06-0505 June 1998 Notice of Violation from Insp on 980329-0511.Violation Noted:Licensee Identified & Took Corrective Actions of Concerns W/Potential Effects of Flooding from Feedwater Line Break on Ability of Main Isolation Valves to Close ML20248J4971998-06-0404 June 1998 Notice of Violation from Investigation Rept 3-97-034, Completed on 980211.Violation Noted:Suppl 2,dtd 970212,to License Amend Request,Dtd 970129, Amend of Cooling Water Sys Emergency Intake Design Basis, Was Not Complete IR 05000282/19980061998-05-26026 May 1998 Insp Repts 50-282/98-06 & 50-306/98-06 on 980330-0409.No Violations Noted.Major Areas Inspected:Conduct of Operations Which Included Continuous 72 H Period of Control Room Observation ML20248B3061998-05-26026 May 1998 Notice of Violation from Insp on 980330-0409.Violation Noted:On 980401,inspectors Observed Plant Operator Hang Secure Tag Associated W/Wo 9801216 on Number 21 Safety Injection Pump Motor Control Ctr W/O Performing Dead Test IR 05000282/19980011998-05-0101 May 1998 SALP Repts 50-282/98-01 & 50-306/98-01 for 960218-980328 IR 05000282/19980051998-04-0606 April 1998 Insp Repts 50-282/98-05 & 50-306/98-05 on 980225-0328.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000282/19980041998-04-0101 April 1998 Insp Repts 50-282/98-04 & 50-306/98-04 on 980210-13 & 0316-20.No Violations Noted.Major Areas Inspected:Rp Performance During Unit 1 Refueling Outage & Unit 2 Forced Outage,Calibration of Radiation Monitoring Sys ML20216E4841998-03-12012 March 1998 Insp Repts 50-282/98-03 & 50-306/98-03 on 980114-0224. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20216E4621998-03-12012 March 1998 Notice of Violation from Insp on 980114-0224.Violation Noted:On 980121,instructions in Work Order 9800310, Isolate Breaker 1H3, Were Not Appropriate to Circumstances Because Loss of Offsite Power Source to Unit 2 Occurred PNO-III-98-011A, on 980124,licensee Shut Down Unit 2 to Investigate Reactor Coolant Leak Associated with Control Rod Drive Mechanism G-9.Licensee Identified Source of Leak as 3/4 Inch through-wall Crack in Manufacturing Weld1998-02-13013 February 1998 PNO-III-98-011A:on 980124,licensee Shut Down Unit 2 to Investigate Reactor Coolant Leak Associated with Control Rod Drive Mechanism G-9.Licensee Identified Source of Leak as 3/4 Inch through-wall Crack in Manufacturing Weld ML20202C0451998-01-30030 January 1998 Notice of Violation from Insp on 971203-980113.Violation Noted:On 971210,Maint Procedure D32,Rev 6,was Not Allowed for Unit 1 When RO & Nuclear Engineer Coordinating Procedure on Two Occasions,Failed to Do Five Degree Cooldown & Heatup ML20202C0581998-01-30030 January 1998 Insp Repts 50-282/97-23 & 50-306/97-23 on 971203-980113. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support PNO-III-98-011, on 980123,unidentified Leakage Increased by Approx 10 to 0.2 Gallons Per Minute.Licensee Began Preparations to Shut Down & Repair Leak in Canopy Seal1998-01-26026 January 1998 PNO-III-98-011:on 980123,unidentified Leakage Increased by Approx 10 to 0.2 Gallons Per Minute.Licensee Began Preparations to Shut Down & Repair Leak in Canopy Seal ML20198A4171997-12-23023 December 1997 Notice of Violation from Insp on 970929-1003.Violations Noted:On 960724,licensee Implemented Procedure Swi O-10, Operations Manual Usage, Rev 28,section 6.11.9,which Contained Inadequate Instructions ML20198A4441997-12-23023 December 1997 Insp Repts 50-282/97-19 & 50-306/97-19 on 970929-1003,21-23 & 1202.Violations Noted.Major Areas Inspected:Licensed Reactor Operator & SRO Requalification Training Program IR 05000282/19970211997-12-15015 December 1997 Insp Repts 50-282/97-21 & 50-306/97-21 on 971022-1202.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support 1999-09-09
[Table view] |
Text
.
.
.
. -
. .
. .
U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-282/88011(DRS); 50-306/88011(DRS)
-
Docket Nos. 50-282; 50-306 Licenses No. OPR-42; DPR-6 Licensee: Northern States Power Company 414 Nicollet Mall Minneapolis, MN 55401 Facility Name: Prairie IslarA Nuclesr Generating Plant Units 1 and 2 Inspection At: Prairie Island Site, Red Wing, Minnesota Inspection conducted: June 20-23, and July 11-15, 1988
~
Inspectors: #M . A,o
.
P. Huber
'
[
q
'
Dat6
. ed
, J. F. Smith 8/M86 (/ Date Approved By:
bf./ M W D. H. Danielson, Chief f!#/7 Materials and Processes Section Date Inspection Summary
Inspection on June 20-23 and July 11-15, 1988 (Reports No. 50-282/88011(DRS);
No. 50-306/88011(0RS))
Areas Inspected: Special safety inspection of the licensee's activities with respect to IE Bulletin 85-03 "Motor Operated Valve (MOV) Common Mode Failure During Plant Transients Due to Improper Switch Settings" (25573).
3esults: Of the areas inspected, no violations or deviations were identifie * Program implementation was completed, however administrative controls on the valve program needed improvemen * Maintenance craftsmen / technicians appeared knowledgeable and conscientious in their work, in spite of the weak procedures which will be correcte * Engineering support provided to the personnel performing work on the valves was goo * The bulletin will remain open pending further review on the part of the licensee and future inspection to be conducted by the NR gDR ADOCK 05000282 PDC
,
.
~
' *
. .
'
DETAILS 1. Persons Contacted Northern States Power (NSP)
R. A. Lindsey, Assistant to Plant Manager
- 0. Mendele, Plant Superintendent, Engineering and Radiation Protection
- R. G. Fraser, Lead Production Engineer
- A. A.-Hunstad, Staff Engineer NRC
- Moser, Resident Inspector
- Denotes those attending the exit meeting held on July 15, 198 The inspectors also contacted other licensee personnel during the course of the inspectio . Licensee Action on IE Bulletins (0 pen) TI 2515/73 and IE Bulletin 85-03 (282/85003-BB; 306/85003-88):
Motor-0perated Valve (MOV) Common Mode Failures During Plant Transients Due to Improper Switch Setting ' Limitorque-Operated, Rising Stem, Gate and Globe Valve Switch Setting Evaluation IE Bulletin 85-03 concerns the proper setting of switches controlling the operation of motor-operated valves. Action Item b of the bulletin requires that correct switch settings be established; Item c requires differential pressure testing preferably, or other justification to demonstrate operability with the settings from Item i l
Because of prevalent industry practice, most valves covered by the bulletin are Limitorque-operated, rising stem, gate or globe valves, as was the case at Prairie Islan Below is a list of the switches involved and concerns for their proper setting, typical setting approaches that have been taken in the industry, and either the resolution adopted at the Prairie Island plant or an identification of the need for additional information or other actio The switches discussed are named: 1
.
.
.
.
Open indication !
Open torque switch bypass !
Close-limit l Close indication ,
Close torque switch bypass l i
(1) Thermal Overload Relay !
,
Discussion: Thermal overloads protect motor winding insulation from high temperature breakdown. These devices consist of hesters which trip a heat sensitive relay at the motor control cente The contacts of the relay either interrupt current to the contactor closure coil (which stops the motor) or initiate an overload alarm, or bot Circuit designs used to eliminate the threat of inadvertent motor trips include: (1) removing the heaters or relay contacts from use; (2) using the relay contacts for alarm only; (3) bypassing the relay contacts during all operating modes except when a valve is being exercised for testing; (4) bypassing the relay contacts only during the presence of an automatic safety actuation signal; and (5) oversizing the thermal overload Each method has advantages and disadvantage Although the thermal overload relay is intended to protect the motor windings from thermal damage, its remote location (at the motor control center), prevents it from sensing actual winding temperature. In addition, the motor has a long thermal decay time in comparison to that of the relay. These two factors combine to compromise the effectiveness of thermal overload protection during valve setup and testing when frequent stroking can result in exceeding the motor duty cycle. The i solution to this problem is to know valve running currents and stroke times, and to limit the frequency of valve stroke cycles accordingl Site Specifics: Thermal overloads are a permanent feature at Prairie Island, stopping valve motion on relay tri No bypass features are use J The licensee's thermal overload devices were set, based on motor current assumptions, to assure a conservative heater selection so that inadvertent thermal overload trips should not be a problem. Thermal overload devices and settings used ,
at Prairie Island were established using the criteria outlined i in General Electric Overload Heater Selection Tables and l Predicted Relay Tripping Time Curve '
l l
l-i I
,
I
_
'
l
.
.
- >
The licensee's administrative procedures control the frequency with which valves may be cycled during setup and testing. The need for measurement of motor current and for timirg the running time have been avoided in these documents by limiting the number of times that a valve of a given size may be stroked in a given period. The NRC inspectors identified areas in the administrative procedures which failed to provide explicit instructions to cover every application. The licensee acknowledged the oversight and initiated a change to the document.before the inspection was ,
completed. This item will be included in the open item for MOV administrative procedures discussed subsequently in this repor In the final response to IE Bulletin 85-03, the licensee stated that thermal overload settings are sized at 70% of full load current and that this setting provides motor protection, should the motor run in excess of the allowable period (15 minutes) at full load curren In reviewing the General Electric Curves of Projected Relay Tripping Times, none of the curves extended I into the fifteen minute regio Any prediction in this area would require extrapolation beyond the data provided by General
'
Electric. When such extrapolation was attempted by the NRC inspectors, it indicated that a motor running at full load current might be expected to trip in as little as three minutes in an ambient of 104* In addition to providing clarification of the tripping time of the relay at full motor load, the licensee was also requested to provide some form of assurance that the relay would not~
trip prematurely when a motor operated valve drew high current on startu In the worst case, a motor might require a very high current while the disk unseat The NRC inspector's interpretation of data on the GE curve indicates that at l high current and high ambient temperature, a properly sized relay might trip in as little as eight second The licensee
, was requested to provide assurance that a properly sized thermal l overload will not trip prematurely while the valve disk is still
'
moving out of contact with the sea The licensee recognized l the problem and will provide a resolutio This item will also be included in the open item for administrative procedures discussed subsequently in this repor (2) Open Torque Switch Discussion: This switch is normally used as a mechanical fuse to limit the mechanical thrust applied to a valve or operator when stroking the valve in the open directio It generally provides no normal control function and is a backup for some l
other failure that may cause its nee This switch is usually bypassed during the initial valve unseating, which is the most challenging portion of the open
! stroke. Failure to set it (or its bypass) properly can cause valve failures.
l l
-
.
.
. .
. ,
.
'
.
If the switch is used, it must be set properly to enable the valve operator to apply adequate thrust on the valve stem to operate the valve against the limiting differential pressure (dp).
A process pump can be used to test the valves against dp to determine the torque switch setting adequacy. Diagnostic testing can determine the valve thrust available for a given torque switch setting without dp, however it is necestary to show the adequacy of the calculated requirement against which it is compare Site Specifics: The open torque switch at Prairie Island is j wired into the circuit but is bypassed for no less than 20% 1 of valve stroke. This setting accounts for the-unseating of
'
the valve and highest den:and portion with respect to thrust )
requirements, and is sufficient to prevent the torque i switch from actuatin Following the bypassed portion of the stroke, the torque switch is part of the circui The licensee established open torque switch settings, using the Motor Operated Valve Analysis and Test System, Inc. (M0 VATS) calculation techniques or the maximum torque switch setting as provided by Limitorque, if it was more conservative than the MOVATS settin l MOVATS Inc. diagnostic equipment was used at Prairie Island to adjust the torque switch in order to achieve the desired thrusts. Dp testing was also performed to provide additional assurance that the valve was properly adjuste This is a conservative approach and provides a high confidence that the valve will ope This is an acceptable configuratio (3) Close Torque Switch Discussion: The close torque switch is normally used to stop motor rotation on the completion of valve travel in the close
direction. Since it provides a normal control function and is exercised on every closure stroke, setting generally needs more careful consideration than for the open torque switch. The limiting requirement for closure is at the end of travel when the thrust requirements are highes The thrust at torque switch trip should equal the most limiting closure thrust requirement including the thrust needed to overcome the dp across the valv Differential pressure testing, using system process pumps with
, appropriate data gathering and diagnostic evaluation, is a positive means of assuring the adequacy of the close torque switch setting. Other approaches based on similarity and analysis may also be acceptable with sufficient basi '.
.
S Site Specifics: The bulletin valves at Prairie Island close with the close torque switch limiting torque for essentially the entire valve stroke. Close torque switch settings were calculated using only the Limitorque calculation techniqu The licensee used MOVATS Inc. diagnostic equipment to establish the desired thrust and its corresponding torque switch settin The valves were adjusted and differential pressure testing was performed to assure adequate . margin exists for valve operabilit (4) Open Limit Switch Discussion: This switch provides the control function of determining the upper limit of valve stem travel in the open direction and stops motor rotation by opening the circuit to the associated motor contactor coil. The setting of this switch must assure an adequate valve stroke but, normally, must prevent backseating. Deliberate backseating using the power of the motor-operator, or motor inertia, can and has caused valve stem shea-ing, stem thread twisting, and valve bonnet metal working until stem scoring and packing blowout occur. Hence, it is important to set the open limit switch away from the backseat and with enough margin to allow for motor contactor dropout time and inerti Site Specifics: The valves at Prairie Island "open on limit,"
with the use of the open limit switch stopping the motor before the valve backseats. Diagnostic testing as well as manual verification was performed to assure that the valves, as left, were not backseatin Further, maintenance procedures have been written to assure that future activities affecting this setting will not result in backseating of the valv No problems were identified in this are (5) Open Indication Discussion: Open indication is usually identified by the presence of a red light that goes out only when the valve is fully close Often, the same rotor is used for the open torque switch bypass, and the setting of the point where the rotor turns has conflicting requirements for the two function In setting for ideal position indication, there is not adequate bypass of the torque switch to assure valve operability; conversely, changes to satisfy the bypass requirements have !
resulted in false valve position indicatio l l
Site Specifics: Prairie Island uses both the open indication l and open torque switch bypass. The valves at Prairie Island I have four limit switch rotors which allow the two different functions to operate independently on separate rotors. The valves were rewired to allow both functions to operate independently. There were no concerns with this resolution I of the proble j l
-.
'
. .
(6) Open Torque Switch Bypass Discussion: When an open torque switch is used, the bypass switch is required to bypass it during the initial portion of the open stroke so that the torque switch will not prematurely stop valve travel due to the high torque conditions required for initial valve movement. There is no clear answer on where to l set the bypass; but, if the valve disk (not the stem) has moved 20% of its total travel distance away from the seat when the bypass opens, this has been accepted as adequat Site Specifics: The valves at Prairie Island have the torque switch bypass set at a minimum of 20% of valve travel. This
, setting is sufficient to prevent the actuation-of the open
'
torque switch in the initial high demand at valve unseatin No problems were noted with this configuratio ;
(7) Close Limit Discussion: The close limit switch is not often used on rising
, stem valves. When it is, it is usually related to a special l application and takes the place of the close torque switch by opening the motor circuit at the end of valve closur It may be used with or without a close torque switch in series with it for over torque protection. (The same switch in parallel with the torque switch would be called a close torque switch bypass.)
Site Specifics: None of the bulletin valves at Prairie Island are wired to "close on limit." The circuit is opened for the valves, stopping the motor, in all cases by actuatian of the close torque switch.
l (8) Close Indication
!
l Discussion: Close indication is usually identified by the l presence of a light that goes out only when the valve is fully l open. This function is usually derived off the same rotor as
, the open limit switch, and while concern exists for the setting l of the open limit, no problem has been identified with the l corresponding closed indication light switc Site Specifics: There was no concern for this switch setting based on a review of valve schematic diagrams and discussions with the licensee. Prairie Island has set the switch based on the open limit switch requirements, i l
(9) Close Torque Switch Bypass l l
l Discussion: The close torque switch bypass acts in the !
l tame manner as the open torque switch bypass; however, !
l contrary to its counterpart function, it normally bypasses j
'
l i
7 l
'.
i
-
. .
,
e the torque switch during the lightest duty portion of the strok If utilized, it should be set to operate during l the initial part of the strok Site Specifics: The close torque switch bypass is on the same rotor as the open limit which opened early in trave The licensee used the close torque _ switch bypass, and since the valves were properly guarded against backseating, there was no concern identified with respect to this switch settin b. Valve Testing Program In response to the bulletin, the licensee developed new procedures and revised existing procedures to reflect the switch setting philosophies. 0.1ce procedures were incorporated, a program of testing, maintenance, and resetting of any switches was conducte During the course of the inspection, the NRC inspectors reviewed the licensee's program and test records to ensure all testing was performed for all valves identified in accordance with the licensee's approved progra (1) MOV Maintenance and Test Procedures During the course of the inspection the NRC inspectors reviewed the procedures listed below:
- D70, Revision 5, "MOV Maintenance Procedures"
- SW1-M-13, Revision 2, "Gould 2200s Recorder Motor Valve Traces"
- SW1-M-14, Revision 1, "MOV Analysis and Test System Operation" l
These procedures provided the direction for the work performed '
on MOV' At Prairie Island, the system engineer responsible for the MOV program provides all coordination of the progra He is responsible for all aspects including identification of the valves, testing to be performed, scheduling of preventive maintenance (PM), analysis of valve work packages, and ensuring that all requirements and commitments are met. This was an area of concern for the NRC inspectors. At no point were the requirements, scope, and responsibilities for the different aspects of the program define The NRC inspectors discussed this situation with the licensee and indicated that administrative control procedures defining the bulletin MOV operability program should be established. The adequacy of the procedures (mentioned l above) was also a concern. Certain valve operability acceptance ,
criteria were vague, unclear, and incomplete in certain areas, l l
i
8 I
.
. .
.
Procedure SW1-M-13 was written to be only understooo by the most experienced personnel, specifically trained in that jo Instructions were sketchy and the possibility for error was high unless an adequate amount of training and familiarity with the procedures was obtained by the personnel prior to performing the work. This was discussed with the licensee and the revision of the procedures and creation of a document governing the licensee's bulletin program is considered an Open Item (50-282/88011-01(0RS); 50-306/88011-01(0RS)).
(a) Review of Completed Work Packages and Other Records Several completed work packages for valve maintenance and switch setting were reviewed by the NRC inspectors for content, completeness, and compatibility with other records. The torque switch settings recorded for the as-found open and close torques in the work package for MV-32238 were not compatible with those reported in the April 8, 1988, response to IE Bulletin 85-03 by NS A similar problem was noted with MV-32025. The Prairie Island staff performed an immediate investigation of the cause and extent of the discrepancy. The cause of the problem was that two different sources of data were use The inspector's data were taken from the work package Data for the "response" letter were taken from the Motor l Valve Data File, wherein all pertinent data for the valves were accumulate At some point a change was made ir. the switch setting without updating the fil This left obsolete data in the fil The work packages showed the correct information. All data in tha data file have been reviewed for accuracy and where discrepancies were noted the effect of the error was evaluate In no case was the operation of .
any valve jeopardized. The table provided with the IE I Bulletin 85-03 Final Response will be corrected and a new letter will be submitte This is considered an Open Item 1 (50-282/88011-02(DRS)); (50-306/88011-02(DRS)). i Changes will be made in administrative procedures to preclude l a repetition of the data collection errors disclosed during l this inspectio Additional changes, as discussed in other areas of this report, will be included in this strengthening ;
of MOV administrative procedure (b) Personnel Performance Once the NRC inspectors became familiar with the processes and procedures at Prairie Island, performance of work on a valve was observe The NRC inspectors observed the performance of the 070 procedure on valve MV-32189, the Unit 2 Emergency Boration Valv ..
.
.
. -
. .
The work performed on the valve was extensive, 'to include gresse change-out and the use of cignature analysis tech 1iques to set the valve switches. The personnel perf irmed the work in ~ a proficient manner, and were very-nowledgeable. The interface between the. cognizant system 9gineer and the maintenance. personnel was good. As the 1 was performed, the maintenance personnel kept' the
_
tem' engineer informed of possible problems with valve-ponents and received approval of corrective actions for to proceeding with the wor This approach and the way in which the personnel performed the work ensured a highly reliable end. produc (2) Inspection of Completed Motor Operated Valves ;
The NRC inspectors performed general external inspection of l the completed M0V's identified in Bulletin 85-0 As might ;
bu expected of equipment recently cleaned _and lubricated, they were clean, dry, -and showed no grease outside of bearing surfaces. Although the NRC inspectors would have preferred to examine a motor operated valve included in the bulletin,'none was available. The alternative was to find a valve which was available for inspection, could be exercised, and which had been adjusted using the M0 VATS procedure used on the bulletin ,
valves. The valve chosen was MV-32086, an Emergency Boration i Valv The Emergency Boration Valve was examined by opening the housing to expose the switches. The motor was disengaged and the valve was manually operated while counting the turns of the handwhee The proper setting of the open and close light switches was confirmed in both directions and the proper setting of the open torque bypass switch was confirmed in the open positio Operation of the close torque switch could not be achieved with the handwhee Although the setting of the switches met all of the objectives of the bulletin, it was necessary to electrically "bump" the actuator in order to declutch the motor and engage the handwhee The cause of this problem was found to be improper adjustment of the trioper Recognizing this as a potentially generic problem, the NRC inspectors discussed the matter with the Prairie Island staf The staff agreed that the procedure covering switch setting would bo strengthened to include.such tests as would disclose the presence of any operational deficiency prior to closing the work package. This is part of the open item concerning MOV administrative procedures noted previously in this repor .. , -
. .
.
l-
!-
,
. .
.
c. Maintenance of Valve Operability Action Item d of the bulletin requires plant procedures that will assure the maintenance of correct switch settings throughout plant i lif To some extent, this involves all programmatic ~ activities !
that assure long term valve operability because wear and degradation l of either the valve or operator affect the adequacy of the switch i setting j
Some factors in assuring adequate switch settings are valve and l valve operator mechanical conditions. Gat.e valve seat friction l factors appear to be anywhere from half to twice that assumed in )
the past using previously accepted formulas; field measurements of i stem thrust show that valve stem thread lubrication may impact thrust values by a factor of two; stem packing tightening has been shown to be a significant factor, actually causing motor burnout in more-severe cases of overtightening. These concerns have to be addressad by maintenance, surveillance, and post maintenance test programs to 1 assure that operability factors are maintaine !
(1) Preventive Maintenance Valve condition is maintair.ed by impirmentation of a Preventive Maintenance program. On a five year. rotation, all valves would
.
l receive a detailed inspection and overhaul. The NRC inspectors l reviewed the substance of the program and reviewed the work i performed by ma'ntenance personnel (as previously mentioned). I Again, work performed on the valve was good, and no problems were note (2) Switch Setting Maintenance Valve switch settings are maintained in accordance with the ASME Section XI program which requires the valve stroke time l i
to be obtained and trended in order to detect degradatio This in itself is not considered adequate, however, the licensee has other mechanisms in place to ensure that any switch settings will be maintained following valve maintenanc Prior to maintenance on a valve, the Valve Data File is reviewed to determine valve operating conditions. The information-included in the data file consists partly of current and power signature traces, and recommended torque switch settings. If l any changes are made on the valve, the file will be updated to provide personnel with information about and a reference for determining the proper operating characteristics of the valv The electrical maintenance personnel were cognizant of the necessity of proper settings of the valve During any maintenance performed on a valve, switch settings were not changed unless the valve was instrumented and tested, thereby l verifying the adequacy of the new switch setting l
.
. .
-
.
The NRC in'pectors s did note one possible concern to the licensee regarding' evaluation criteria for current 'and power traces obtained for review by the system enginee During the performance of the MOV maintenance procedure D70, as found and.as left motor valve traces are recorded. The traces were subsequently to be reviewed by the. Electrical Maintenance Supervisor or the System Engineer. Acceptance criteria were included.in the procedure but the NRC inspectors were concerned that the acceptance criteria was not specific enough but more importantly, that not all of the switch settings were being-adequately evaluated. The NRC inspectors noted the following example (a) Thermal overload setpoints need evaluation to determine what affect changes in MOV switch settings or thrust demands have on the setpoint of the thermal overloa (b) The MOV may not be able to deliver adequate thrust if the condition of the operator changes for reasons such as packing load change (c) Motor current is used to compare valve condition at different times, but the current of polyphase induction motors used in M0V's is' insensitive to load changes in the range where the motors are normally applied. Current'
remains fairly constant at the low end through the middle of the loading scale. As the load increases, the phase angle decreases, producing more real power. When the motor is heavily loaded the phase angle- approaches zero (and the power. factor approaches 1.0). Only then does the current give a true indication of loa In the range mostly used, load is not effectively represented by curren (d) The current traces available for comparison show little amplitude, so small changes would be difficult to detect on existing record The current and power traces were obtained by the licensee for analysis for both as found and as left conditions,'and may provide y the means to determine the adeclacy and the effective maintenance of the switch setting The development of additional, more defined acceptance criteria for current traces was discussed with the licensee. Further revier ;
of this matter will be performed by the licensee. Pending the !
presentation of objective evidence that motor current providus a 1 valid criterion for evaluating the effectiveness of switch settings, this is considered an Unresolved Item (50 282/88011-03(DRS);
50-306/88011-03(ORS)).
12
- _ _ _ . -, _
'l l
. .
. .
g Undervoltage Considerations Motors provided for these MOVs are guaranteed to provide rated torque at 80% of normal line voltage. If, upon opening, the unseating loads are high when line voltage is low, there can be a significant voltage drop between the motor control center and the moto If this voltage-drop is sufficiently high it can drop the voltage to the motor below the. required 80% so that the motor cannot develop sufficient torque to operat The -relatively high current and delay in operation may -
cause the thermal overload to trip and control of the valve would be lost. Alternatively, in closing the valve, a drop below 80% normal line voltage could prevent operation of the torque switch so that the motor would remain stalled on line with high current passing through it until the thermal overload trippe The licensee provided the size and lengths of runs of the conductors from the motor control centers to a sample of motor operator valves selected by the NRC inspectors. The samples included the longest runs, the highest current demand motors and the smallest (relative)
cables of any motor operated valves inc1Jded in the bulletin. Voltage drops were calculated based on locked motor current rating for the motors. This is a conservative approach because it does not consider the current reduction resulting from the reduced voltage 3upplied to the motor. As indicated in a letter to NRR dated August 17, 1982, minimum voltage to the motor control centers will be 395 volt Calculation of the line voltage drops between the motor control center and the motors disclosed a maximum of 9.3 volts. Based on a 460 volt nominal line, the remaining voltage provides 83.8% of full required line voltage. This is an acceptable conditio . Personnel Training The review of administrative and technical procedures disclosed a strong reliance on the ability of maintenance personnel to perform work on a motor operated valve with a minimum of written guidance. Maintenance personnel are assumed to be well versed in the adjustment of valve In order to test the validity of this assumption, the NRC inspectors investigated several areas, one of which was trainin Training in MOVs and in the M0 VATS was given by M0 VATS, Inc. personnel using selected portions of a course developed by M0 VATS. Training was tailored to the needs of the individual with none of the maintenance personnel receiving the full 80 hour9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> course. The reduction in course attendance was based on prior experience and training of personne The Prairie Island engineering staff is small, stable, and specialized in particular area In addition to familiarity with their specialty, they are also familiar with maintenance personnel who work in the area of their specialty. Based on this knowledge, they are confident that the people performing work are properly trained and experienced in the wor . .
. .
-
.
The NRC inspectors reviewed the-M0 VATS Training Course for content and effectiveness. The course is the same one given to maintenance personnel across the country and is complete and effective when administered in its entiret HowcVer, the course was not delivered.in its entirely to any student at Prairie Island and there is no definitive record of what was presented to each student. The records show no indication of prior training or experience, no recommendations for needed areas of training and no indication of subjects covered. -The training records show only hours of class attended by each student; they do not indicate the coursP materials to which he was exposed nor give any indication of the proficiency gained. The training appears to have been effective, as evidenced by the NRC inspectors observing personnel activities and discussing the work with them, however the evidence of effective training is not available from training records. The familiarity of the staff with the training and capabilities of maintenance personnel is possible only because of the small staff and stability of plant personnel. Although the system-in effect appears to have been effective, it was difficult for an outsider to follow and did not provide objective evidence of personnel training or proficienc . Open Items Open items are matters which have been discussed with the licensee which will be reviewed further by the inspectors and which involve some action on the part of the NRC or licensee or bot Open items disclosed during the inspection are discussed in Paragraphs 2.b.(1) and 2.b.(1)(a). The bulletin will also remain ope . Unresolved Items Unresolved items are matters about which information is required to ascertain whether they are acceptable items, violations, or deviation One unresolved item identified during the inspection is discussed in Paragraph 2.c.(2).
6. Exit Interview '
The inspectors met with licensee representatives.(denoted in Paragraph 1) i on July 15, 1988, to discuss the scope and findings of the inspection l including the two open and one unresolved items. The inspectors also discussed the likely informational content of the reports and summarized the results. The licensee acknowledged the statements made by the inspectors with respect to the content of this report. The licensee did not identify any documents / processes used in this report as proprietar .
--. - .