Insp Repts 50-282/98-13 & 50-306/98-13 on 980727-31.No Violations Noted.Major Areas Inspected:Review of Physical Security Program
ML20237D392
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/21/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20237D389 List:
References
50-282-98-13, 50-306-98-13, NUDOCS 9808260133
Download: ML20237D392 (11)


Text

_ _ - - _ _ - _ - _ _ _ _ _ - _ _ _

_ - _ _ _ _ -. _ =

___

.

.

U.S. NUCLEAR REGULATORY COMMISSION i

REGION lli I

Docket Nos:

50-282;50-306 License Nos:

DPR-42; DPR-60 I

Report Nos:

50-282/98013(DRS); 50-306/98013(DRS)

Licensee:

Northern States Power Company Facility:

Prairie Island Nuclear Generating Plant Location:

1717 Wakonade Dr. East Welch, MN 55089 Dates:

July 27-31,1998 t

inspector:

G. Pirtle, Physical Security inspector j

l Approved by:

James R. Creed, Chief, Plant Support Branch 1 Division of Reactor Safety

!

.

i

!

l i

M Ko

fi I

i

_ - _ _ - - _ _ _ _ _ _ - - _

-,

.

EXECUTIVE SUMMARY Prairie Island Nuclear Generating Plant NRC Inspection Reports 50-282/98013; 50-306/98013 This inspection included a review of the physical security program, it was an announced inspection conducted by a regional physical security specialist.

No violatiota or deviations were noted.

.

Security facilities and equipment observed functioned as designed and

.

compensatory measures were seldom required. However, we noted very high alarm rates for supposedly environmental-related alarms. Some minor inconsistencies were noted in security component testing (Section S.2).

Records and documents reviewed were complete and accurate (Section S.3).

  • Security force members were knowledgeable of post requirements and

.

performed the duties in an adequate manner. A minor deficiency was noted pertaining to contractor personnel authorizing visitors into the protected area (Section S.4).

No deficiencies were noted during the review of ten security force training and

-

qualification records (Section S.5).

Self-assessments were considered a strength. The self-assessment program

-

was varied, aggressive, and well documented. Findings were effectively documented and monitored until closure (Section S.7).

I i

i l

l

>

,

__ -

_--

_ _ _ _ _ _ _ _ _ _ _ _ _,

t

,

l

Report Details IV. Plant Suonort

{

S2 Status of Security Facilities and Equipment a.

Insoection Scoce (81700)

The inspector reviewed the condition of security equipment and facilities required by the l

security plan. The equipment observed included, but was not limited to, search equipment, intrusion alarm equipment, alarm assessment equipment, and equipment

,

within the security alarm stations. Facilities observed included the Main Access Facility

{

and alarrn stations.

)

{

b.

Observations and Findinos

)

l Security equipment observed during the inspection functioned as designed and I

compensatory measures were implemented when appropriate, except for environmental caused alarms as described below. Maintenance support for security equipment was generally timely.

l l

The inspector's review of alarm histories and trending data for the second quarter of 1998 showed a very high number of supposedly environment-caused alarms for the perimeter alarm system, particularly one specific type of alarm equipment. The trending data indicated that over 1100 such alarms had occurred bet' ween April and June 1998.

The inspector's evaluation also indicated that the number of such alarms may have been up to 10 percent higher than the trending data indicated because some alarms were not counted unless certain criteria was met.

I The security force's practice was to assess such alarms as nuisance alarms. As j

nuisance alarms, the zones did not have to be compensated for and taken out of j

service. The basis for the determination as a nuisance alarm was evaluation by Closed Circuit Television (CCTV) that rain or other environmental factors was the cause for the specific alarm. To be classified as a nuisance alarm, the cause of the alarm must be I

positively identified, (such as an animal observed in the zone), at the time the alarm is

{

activated. The inspector's review of the available data also showed that allowing the j

alarms to continue, rather than take the zone (s) out of service and compensate for j

them, had caused delays in acknowledging and clearing such alarms, and greatly j

increased the possibility of missing a valid alarm that required a response. In some j

instances, the number and time of alarms received required the alarms to be j

acknowledged and cleared several at a time (referred to as blocking), rather than individually. Procedural guidance allowed a high degree of judgement to be exercised by the onduty senior security force supervisor to cope with the very high alarm rates.

However, the judgement allowed (to shut down zones and compensate for them) was not used for the time penods reviewed by the inspector.

l l

]

.

,

_

- _ _ _ _ -_

_ _________________ _ __ _ - _ _ _ _

i

.

Subsequent to the onsite inspection, the security staff initiated Work Order No.

{

9810094, August 6,1998, to evaluate and adjust, if needed, the alarm system's j

sensitivitity at specified locations. Additionally, the security staff was in the process of evaluating current alarm system test procedures and evaluating existing security procedural guidance to determine if more specific guidance for actions to take during high alarm periods was needed. The results of the security staff's actions and evaluations will be monitored as an Inspection Followup Item (50-282/98013-01; 50-306/98013-01).

The inspector's review of the security testing program and observation of some component testing showed a minor inconsistency in testing of certain security components, such as duress alarms. The noted inconsistencies were being reviewed and evaluated by the security staff.

l c.

Conclusions

!

Security facilities and equipment observed by the inspector functioned as designed.

Compensatory measures were seldom required. An Inspection Followup item was identified in reference to very high alarm rates for supposedly environmental-related alarms. Some mlnor inconsistencies were noted in security component testing.

S3 Security and Safeguards Procedures and Documentation a.

Insoection Scoce (81700)

The inspector reviewed selected procedures pertaining to the areas inspected and also

!

reviewed appropriate logs, records, and other documents.

j b.

Observations and Findinas Records and documents reviewed were complete and accurat3. Security procedures were well written, reviewed at the appropriate time, and were in sufficient depth to adequately address the tasks described.

c.

Conc!usions Records and documents reviewed were complete and accurate.

S4 Security and Safeguards Staff Knowledge and Performance a.

insoection Scoce (81700)

l The inspector toured various security posts and observed performance of duties to l

determine if the officers were knowledgeable of post requirements. Security event logs and other records pertaining to security force performance were also reviewed.

l

- _ _ _ _ _ -

__ - _ _.. _ _ _ _ _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ _ - _ _ _ - - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _

_ _ _ _ _ _ _

.

.

b.

Observations and Findinas Security shift supervisors observed by the inspector provided excellent oversight of security activities in progress. Alarm station and security supervisor activity logs were current and accurate. Personnel observed on post were very knowledgeable of post responsibilities and procedures. The only minor deficiency noted was a practice pertaining to contractor personnel authorizing visitors. Although this practice was known by security supervision, it was not addressed by security procedures. When identified, the security staff agreed to address this issue, c.

Conclusions Security force members were knowledgeable of post requirements and performed the duties in an adequate manner. A minor deficiency was noted pertaining to contractor personnel authorizing visitors into the protected area.

SS Security and Safeguards Staff Training and Qualification a.

insoection Scoce (81700)

Ten training files for newly hired security personnel were reviewed. The inspector attended a training session conducted on recognizing explosive devices.

b.

Observations and Findinas Security personnel were trained on all required job tasks. A licensee security supervisor certified the personnel as qualified in training and qualification criteria before the personnel were assigned duties. Records of physical examination results were complete and accurate. The observed training session was well conducted. Active participation by class members was evident.

c.

Conclusions No deficiencies were noted during the review of ten security force training and qualification records.

S7 Quality Assurance in Security and Safeguards Activities a.

Insoection Scoce (81700)

The inspector reviewed self-assessment evaluations conducted by security staff and other personnel (licensee and contractor).

b.

Observations and Findinas i

The self-assessment program for the security department continued to be a strength.

l The security department had developed a culture that encouraged self-assessment and l

l

_ _ - _ _ - - _ _ _ - _ - _ - __-_ -- --_ ____ _

_

I

'

critical review of practically every segment of the security program. The major program elements included audit and field observations by the Generation Quality Service (GOS)

Depa tment, self assessments by the security department, documented back shift

,

checks and evaluations by senior contract security force supervisors, and

"

surveillance / audits of limited scope completed by individual security officers. NRC security inspection procedures (81000 series) were often used to define the scope of the

audits. Audits were scheduled through 1998. All self-assessment findings were documented, actions assigned, and corrective actions implemented. The security staff had adhered to the audit schedule for the first six months of the year. The security department's self-assessment efforts were further strengthened by root cause analysis evaluations completed by a trained member of the security staff for each security force error that resulted in a loggabt; security event in 1998 (14 such evaluations were completed).

The inspector reviewed the most recent GOS audit of the security program (Audit No.

AG 1997-S-3, with audit dates from July 1 to September 30,1997). The scope of the audit was adequate. The audit's results were well documented. The vast majority of

. audit findings were positive, but problems were noted in reference to spacing between some jersey barriers in the vehicle barrier system; some communication difficulties; and security officer familiarility with a shotgun. Plans, procedures, testing and maintenance programs, response commitments, training and qualifications, and self-assessments were determined to be effoctive.

Additionally, the inspector reviewed ten GQS observation reports, dated between July 24 and September 29,1997. The GQS observation reports adequately addressed areas such as: explosive detector annual tests; stress firing; security self-assessment program; vehicle barrier system inspection; review of security and safeguards contingency plans to identify any adverse impact on plant or personnel safety; and other areas. The observations were performance orientated.

- The inspector reviewed the security audit finding summary report maintained by the security staff to track audits and related corrective actions completed by security force personnel. Twenty-seven audits had been completed since January of 1998. Some of the audit subjects included: post orders; management effectiveness; testing and maintenance; physical barriers; compensatory measures; and access controls.

Procedure and practice deficiencies were routinely identified, followed up, and closed.

The contractor security Quality improvement Suggestion program resulted in 57 security-related suggestions being submitted, evaluated, and acted upon between December 25,1997 and July 4,1998.

c.

Conclusions Self-assessments were considered a strength. The self-assessment program was varied, aggressive, and well documented. Findings were effectively documented and

,

corrective actions were implemented

_.

_ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ - _ _ - _ _ - _ _ - - -

-

.

I

!

l

.

Miscellaneous Security and Safeguards issues (92904)

S8.1 (Closed) Licensee Event Report (LER) 9608: The licensee submitted a security-related LER (No. 9608) on April 24,1996, pertaining to the failure to report in a timely manner suspension of some security measures during a severe weather condition. The corrective action identified in the LER was completed.

S8.2 (Closed) LER 9620: The licensee submitted a security-related LER (No. 9620) on

'

' January 8,1997, pertaining to an incident which occurred in August 1996 (and discovered in December 1996) in which an individual granted unescorted access authorization was admitted for in-patient medical care by referral from the Employee Assistance Program counselor and the individual's unescorted access was not i

terminated during the period of in-patient care as required by the licensee's procedures.

l The Individual's access was revoked on December 9,1996. No similar incidents have occurred.

The LER identified four corrective actions that would be implemented to prevent recurrence of the incident. The inspector confirmed that the four corrective actions had been implemented (See Section S8.1 of Report No. 50-263/97005, dated June 2,1997 for related information).

,

S8.3 (Closed) Insnection Followuo item (Recort Nos. 50-282/96006-12: 50-306/96006-12):

The shelf life for pepper spray was not being effectively monitored. Procedures have been developed and implemented to monitor the shelf life of pepper spray on a monthly basis during equipment inventories.

S8.4 (Closed) Violation (Recort Nos. 50-282/97005-01: 50-306/97005-01): Visitor entry records for the Independent Spent Fuel Storage Installation were falsified on one occasion by a security supervisor. The licensee responded to the Notice of Violation (Notice) by letter dated June 2,1997. The inspector confirmed that the corrective actions identified in the licensee's response to the Notice were completed.

i S8.5 (Closed) Unresolved item (Recort Nos. 50-282/97007-01: 50-306/97007-01): A portion of the Vehicle Barrier System (VBS) did not have an engineering analysis completed to confirm that the barrier could meet NRC criteria identified in 10 CFR 73.55 (c)(9). The required engineering analysis was completed and forwarded to the NRC for review. The analysis was considered adequate.

SS.6 (Closed) Insoection Followuo item (Recort Nos. 50-282/97007-02: 50-306/97007-02): A revision to the security plan was required to address NRC review comments for revision 36 of the security plan. The required revision (No. 37) was submitted to the NRC, reviewed, and considered adequate to address review comments for the previous

,

revision.

J

l

!-

I-l L____1_______._._________________._____

_ _ _ _ _ _. _ _ _. _ _ _ _ _ _ _. _. _. _

_ _ _ _ _.. _. _

_ _ _ _ _..

. _ _ _ _

_ _ - _ _ _ _ _ - _ _ ______-____-_-- -_- - - - - - -

.

.

S8.7 (Closed) Unresolved item (Recort Nos. 50-282/97007-04: 50-306/97007-04):

Procedure guidance was necessary to address VBS contingencies that would be reported to the NRC or logged as security events. Procedure guidance was completed for those events that would be logged as security events or reported to the NRC.

S8.8 (Closed) insoection Followuo item (Recort Nos. 50-282/97013-02:50-306/97013-02):

'

Procedure weaknesses were noted pertaining to vehicle entry and exit into the protected area, and testing of a segment of the CCTV system. The appropriate procedures were adequately revised.

X.1 Exit Meeting Summary The inspector presented the inspection results to licensee management at the conclusion of the onsite inspection on July 31,1998. The licensee acknowledged the findings presented. The inspector asked the licensee whether any materials examined or inspection findings discussed during the exit meeting should be considered as proprietary or safeguards information. It was agreed that the specific alarm zones supposedly adversely affected by the environment and compensatory measures for inactivated alarms should be treated as safeguards information and exempt from public disclosure until the issue is resolved. No other proprietary or safeguards information was identified.

_ _ _ _ _ _ _ _

o

.

O PARTIAL LIST OF PERSONS CONTACTED L

Licensee:

T. Amundson, Acting Plant Manager J. Eirikis, District Manager, The Wackenhut Corporation (BNC)

!

J. Hill, Quality Assurance D. Hutchson, Nuclear Security Specialist C. Johnson, Operations Supervisor, TWC G. Miserendino, Corporate Security Director i

D. Parrish, Security System Engineer l

M. Sleigh, Superintendent, Security

[

E. Timmer, Nuclear Security Specialist NBC Steven Ray, Senior Resident inspector

<

INSPECTION PROCEDURES USED

- IP 81700 Physical Security Program For Power Reactors IP 92904 Followup - Plant Support ITEMS OPENED AND CLOSED

<

Ooened 50-282/980013-01 IFl Excessive Alarms and ineffective Response to Multiple Alarms 50-306/98013-01 IFl Excessive Alarms and ineffective Response to Multiple Alarms Closed 50-282/96006-12 IFl Effectively Monitoring Shelf Life For Pepper Snray

'

50-306-96006-12-IFl Effectively Monitoring Shelf Life For Pepper Spray 50-282/97005-01 VIO Falsification of Visitor Entry Records For the Independent Spent Fuel Storage Installation

,

50-306/97005-01 VIO Falsification of Vititor Entry Records For the Independent Spent L

Fuel Storage Installation 50-282/97007-01 URI A Portion of The Vehicle Barrier System Required an Engineering Analysis

,

l

'

i

_

_ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - - _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

!

O l

50-306/97007-01 URI A Portion of The Vehicle Barrier System Required an Engineering

!

Analysis 50-282/97007-02 IFl Need to Revise Security Plan to Address Review Comments For Revision 36 of The Plan 50-306/97007-02 IFl Need to Revise Security Plan to Address Review Comments For Revision 36 of The Plan 50-282/97007-04 URI Guidance Required For Reporting and Logging Security Events l

Involving The Vehicle Barrier System 50-306/97007-04 URI Guidance Required For Reporting and Logging Security Events involving The Vehicle Barrier System 50-282/97013-02 IFl Some Weaknesses Were Noted in Security Procedures 50-306/97013-02 IFl Some Weaknesses Were Noted in Security Procedures 50-282/9608 LER Delay in Reporting The Suspension of Some Security Measures 50-282/9620 LER An Individual's Unescorted Access Should Have Been Denied LIST OF ACRONYMS USED CCW Closed Circuit Televison GQS Generation Quality Service IFl Inspection Followup Item IP inspection Procedure LER Licensee Event Report W/C The Wackenhut Corporation URI Unresolved item VBS'

Vehicle Barrier System

'

VIO Violation l

l l

l l

J

'

.

...

PARTIAL LISTING OF DOCUMENTS REVIEWED Sampling Review of Security Event Logs from January 1998 to July 1,1998 Licensee Event Report 96-20,"An Individual's Security Access Should Have Been Revoked Following Determination of Questionable Fitness", dated January 8,1997 Licensee Event Report 9608, " Temporary Suspension of Safeguards Compensatory Measures", dated April 24,1996 Securky Procedure SIP 5.1," Reporting of Security Events", Revision 0, Approved December 8 1997 Security Procedure SIP 4.3, " Contingency Equipment inspection and Inventory", Revision 0, I

Approved November 5,1997 Security Procedure SIP 1.2," Admittance and Exit of Personnel", Revision 7, Approved February 27,1997 Security Procedure SIP 1.3," Vehicle Admittance and Control", Revision 11, Approved February 27,1998 Security Procedure SIP 3.2, "CAS/SAS Operations", Revision 8, Approved July 13,1998 Security Procedure SIP 5.0, " Compensatory Measures", Revision 4, Approved June 8,1998 l

Security Procedure SAP 2.1,"Self Assessment Program", Revision 0, Approved January 21,.

'

1998 l

Security Procedure SAP 2.7, " Alarm Data Trending", Revision 0, Approved February 5,1998 -

I i

Security Procedure SAP 2.8," Quarterly Security Report", Approved January 29,1998 l

Quarterly Security Reports (Trending Data) for Third and Fourth Quarters of 1997 and First and

'

Second Quarters of 1998

_ Sampling Review of Fourteen Error Reduction Reports (Root Cause Analysis) For Security l

Caused Loggable Security Events

>

Generation Quality Services Audit No. AG 1997-S-3 for Audit Period Between July 1 and l

September 30,1997 Ten Generation Quality Services Security-Related Observation Reports Dated Between July 24 and September 29,1997

'

Security Self-Assessment Audits Findings Summary Report for the Period Between January and July 1998

,

'