Category:INSPECTION REPORT
MONTHYEARIR 05000282/19990141999-10-19019 October 1999 Insp Repts 50-282/99-14 & 50-306/99-14 on 990920-22. Violations Noted.Major Areas Inspected:Heat Sink Performance IR 05000282/19990121999-10-0606 October 1999 Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000282/19990071999-09-28028 September 1999 Insp Repts 50-282/99-07 & 50-306/99-07 on 990721-0831. Non-cited Violations Noted.Major Areas Inspected:Followup Y2K Readiness Review IR 05000282/19990101999-09-10010 September 1999 Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12. Non-cited Violations Noted.Major Areas Inspected:Physical Protection Cornerstone,Within Safeguards Strategic Assessment Area IR 05000282/19990111999-09-0909 September 1999 Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.NCV Noted.Major Areas Inspected:Public Radiation Safety & Included Review of Performance Indicators for Occupational & Public Radiation Safety IR 05000282/19990091999-08-17017 August 1999 Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22. Violations Noted.Major Areas Inspected:Reactor Safety, Emergency Preparedness & Review of Performance Indicators for Reactor Safety & Emergency Preparedness IR 05000282/19990061999-08-12012 August 1999 Insp Repts 50-282/99-06 & 50-306/99-06 on 990601-0720.One NCV Occurred.Major Areas Inspected:Activities Related to Reactor Safety,Verification of Performance Indicators,Event Followup & Compliance with Commission Rules & Regulations IR 05000282/19990041999-06-30030 June 1999 Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19990051999-05-25025 May 1999 Insp Repts 50-282/99-05 & 50-306/99-05 on 990426-30.No Violations Noted.Major Areas Inspected:Review of Licensee Radiation Protection Performance During Unit 1 Refueling Outage,Shutdown Chemistry & Crud Burst IR 05000282/19990021999-05-0404 May 1999 Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07200010/19990011999-04-29029 April 1999 Insp Rept 72-0010/99-01 on 990308-0413.No Violations Noted. Major Areas Inspected:Direct Observation of Various Portions of Loading of Eighth & Ninth Dry Fuel Storage Casks from SFP to ISFSI Located Away from Main Protected Area of Site IR 05000282/19990031999-04-16016 April 1999 Insp Repts 50-282/99-03 & 50-306/99-03 on 990322-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000282/19990011999-03-18018 March 1999 Insp Repts 50-282/99-01 & 50-306/99-01 on 990115-0225.No Violations Noted:Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19980231999-01-29029 January 1999 Insp Repts 50-282/98-23 & 50-306/98-23 on 981204-990114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980201998-12-18018 December 1998 Insp Repts 50-282/98-20 & 50-306/98-20 on 981023-1203.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000306/19980211998-12-17017 December 1998 Insp Rept 50-306/98-21 on 981116-24.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage Cycle 19 IR 05000282/19980221998-12-0101 December 1998 Insp Repts 50-282/98-22 & 50-306/98-22 on 981116-20.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Performance During Unit 2 Refueling Outage IR 05000282/19980181998-11-18018 November 1998 Insp Repts 50-282/98-18 & 50-306/98-18 on 980911-1022.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980191998-10-29029 October 1998 Insp Repts 50-282/98-19 & 50-306/98-19 on 981013-16.No Violations Noted.Major Areas Inspected:Review of Chemistry Program Re Plant Water Quality & Analytical Capabilities IR 05000282/19980161998-10-0909 October 1998 Insp Repts 50-282/98-16 & 50-306/99-16 on 980810-28. Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected:Review of Fire Protection Project self- Assessment IR 05000282/19980151998-10-0909 October 1998 Insp Repts 50-282/98-15 & 50-306/98-15 on 980731-0910. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000282/19980131998-08-21021 August 1998 Insp Repts 50-282/98-13 & 50-306/98-13 on 980727-31.No Violations Noted.Major Areas Inspected:Review of Physical Security Program IR 05000282/19980091998-08-19019 August 1998 Insp Repts 50-282/98-09 & 50-306/98-09 on 980619-0730.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980121998-08-14014 August 1998 Insp Repts 50-282/98-12 & 50-306/98-12 on 980720-24.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000282/19980141998-08-11011 August 1998 Insp Repts 50-282/98-14 & 50-306/98-14 on 980720-24.No Violations Noted.Major Areas Inspected:Review of Pcp,Storage & Processing of Solid Radwaste & Shipment & Disposal of Radioactive Matl IR 05000282/19980101998-07-10010 July 1998 Insp Repts 50-282/98-10 & 50-306/98-10 on 980605-12. Violations Noted.Major Areas inspected:on-site Insp Into Circumstances Surrounding Unit 1 RT Due to Dropped CR & Actions Taken for Recovery to Safe Shutdown on 980605 IR 05000282/19980081998-06-28028 June 1998 Insp Repts 50-282/98-08 & 50-306/98-08 on 980512-0618.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980051998-04-0606 April 1998 Insp Repts 50-282/98-05 & 50-306/98-05 on 980225-0328.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000282/19980041998-04-0101 April 1998 Insp Repts 50-282/98-04 & 50-306/98-04 on 980210-13 & 0316-20.No Violations Noted.Major Areas Inspected:Rp Performance During Unit 1 Refueling Outage & Unit 2 Forced Outage,Calibration of Radiation Monitoring Sys ML20216E4841998-03-12012 March 1998 Insp Repts 50-282/98-03 & 50-306/98-03 on 980114-0224. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000282/19970231998-01-30030 January 1998 Insp Repts 50-282/97-23 & 50-306/97-23 on 971203-980113. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20198A4441997-12-23023 December 1997 Insp Repts 50-282/97-19 & 50-306/97-19 on 970929-1003,21-23 & 1202.Violations Noted.Major Areas Inspected:Licensed Reactor Operator & SRO Requalification Training Program IR 05000282/19970211997-12-15015 December 1997 Insp Repts 50-282/97-21 & 50-306/97-21 on 971022-1202.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19970201997-12-0505 December 1997 Insp Rept 50-282/97-20 on 971026-30 & 1117-19.No Violations Noted.Major Areas Inspected:Licensee Steam Generator Insp Program IR 05000282/19970221997-11-24024 November 1997 Insp Repts 50-282/97-22 & 50-306/97-22 on 971028-31.No Violations Noted.Major Areas Inspected:Plant Support Performance Re Refueling Outage,Surveys to Unconditionally Release Turbine Components & Shut Down Chemistry IR 05000282/19970181997-11-14014 November 1997 Insp Repts 50-282/97-18 & 50-306/97-18 on 970910-971021.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19970171997-10-0404 October 1997 Insp Repts 50-282/97-17,50-306/97-17 & 72-0010/97-17 on 970825-29 & 970908-12.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program IR 05000282/19970161997-09-25025 September 1997 Insp Repts 50-282/97-16,50-306/97-16 & 72-0010/97-16 on 970806-0909.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000282/19970141997-08-21021 August 1997 Insp Repts 50-282/97-14 & 50-306/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program,W/Emphasis on Listed Areas IR 05000282/19970111997-07-24024 July 1997 Insp Repts 50-282/97-11 & 50-306/97-11 on 970514-0625. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19970131997-07-18018 July 1997 Security Insp Repts 50-282/97-13 & 50-306/97-13 on 970602-06.No Violations Noted.Major Areas Inspected:Physical Security Program ML20149F3191997-07-16016 July 1997 Insp Repts 50-282/97-08 & 50-306/97-08 on 970414-0613. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering for AFW Sys & Parts of Control Room Ventilation IR 05000282/19970101997-07-0101 July 1997 Insp Repts 50-282/97-10 & 50-306/97-10 on 970519-29.No Violations Noted.Major Areas Inspected:Ep Program,Including Emergency Response Facilities,Equipment & Supplies IR 05000282/19970091997-06-0202 June 1997 Insp Repts 50-282/97-09,50-306/97-09 & 72-0010/97-09 on 970405-0513.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000282/19970051997-05-0101 May 1997 Insp Repts 50-282/97-05,50-306/97-05 & 72-0010/97-05 on 970221-0404.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000306/19970061997-04-30030 April 1997 Insp Rept 50-306/97-06 on 970311-17.Violations Noted.Major Areas Inspected:Mispositioning of Pressurizer Vent Valve During Execution of Procedure 2D8 Filling & Venting Reactor Coolant Sys IR 05000282/19970071997-04-30030 April 1997 Insp Repts 50-282/97-07 & 50-306/97-07 on 970407-08 & 970416.No Violations Noted.Major Areas Inspected:Review of Vehicle Barrier System ML20136J4851997-03-14014 March 1997 Insp Repts 50-282/97-03 & 50-306/97-03 on 970203-13. Violations Noted.Major Areas Inspected:Performance of Listed Activities ML20135D4121997-02-25025 February 1997 Insp Repts 50-282/97-02 & 50-306/97-02 on 970108-0220. Violation Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19970041997-02-23023 February 1997 Insp Repts 50-282/97-04 & 50-306/97-04 on 970203-07.No Violations Noted.Major Areas Inspected:Inspector Reviewed Several ALARA Reviews & RWPs 1999-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000282/19990141999-10-19019 October 1999 Insp Repts 50-282/99-14 & 50-306/99-14 on 990920-22. Violations Noted.Major Areas Inspected:Heat Sink Performance IR 05000282/19990121999-10-0606 October 1999 Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000282/19990071999-09-28028 September 1999 Insp Repts 50-282/99-07 & 50-306/99-07 on 990721-0831. Non-cited Violations Noted.Major Areas Inspected:Followup Y2K Readiness Review IR 05000282/19990101999-09-10010 September 1999 Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12. Non-cited Violations Noted.Major Areas Inspected:Physical Protection Cornerstone,Within Safeguards Strategic Assessment Area IR 05000282/19990111999-09-0909 September 1999 Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.NCV Noted.Major Areas Inspected:Public Radiation Safety & Included Review of Performance Indicators for Occupational & Public Radiation Safety IR 05000282/19990091999-08-17017 August 1999 Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22. Violations Noted.Major Areas Inspected:Reactor Safety, Emergency Preparedness & Review of Performance Indicators for Reactor Safety & Emergency Preparedness IR 05000282/19990061999-08-12012 August 1999 Insp Repts 50-282/99-06 & 50-306/99-06 on 990601-0720.One NCV Occurred.Major Areas Inspected:Activities Related to Reactor Safety,Verification of Performance Indicators,Event Followup & Compliance with Commission Rules & Regulations IR 05000282/19990041999-06-30030 June 1999 Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19990051999-05-25025 May 1999 Insp Repts 50-282/99-05 & 50-306/99-05 on 990426-30.No Violations Noted.Major Areas Inspected:Review of Licensee Radiation Protection Performance During Unit 1 Refueling Outage,Shutdown Chemistry & Crud Burst IR 05000282/19990021999-05-0404 May 1999 Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07200010/19990011999-04-29029 April 1999 Insp Rept 72-0010/99-01 on 990308-0413.No Violations Noted. Major Areas Inspected:Direct Observation of Various Portions of Loading of Eighth & Ninth Dry Fuel Storage Casks from SFP to ISFSI Located Away from Main Protected Area of Site IR 05000282/19990031999-04-16016 April 1999 Insp Repts 50-282/99-03 & 50-306/99-03 on 990322-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000282/19990011999-03-18018 March 1999 Insp Repts 50-282/99-01 & 50-306/99-01 on 990115-0225.No Violations Noted:Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19980231999-01-29029 January 1999 Insp Repts 50-282/98-23 & 50-306/98-23 on 981204-990114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980201998-12-18018 December 1998 Insp Repts 50-282/98-20 & 50-306/98-20 on 981023-1203.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000306/19980211998-12-17017 December 1998 Insp Rept 50-306/98-21 on 981116-24.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage Cycle 19 IR 05000282/19980221998-12-0101 December 1998 Insp Repts 50-282/98-22 & 50-306/98-22 on 981116-20.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Performance During Unit 2 Refueling Outage IR 05000282/19980181998-11-18018 November 1998 Insp Repts 50-282/98-18 & 50-306/98-18 on 980911-1022.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980191998-10-29029 October 1998 Insp Repts 50-282/98-19 & 50-306/98-19 on 981013-16.No Violations Noted.Major Areas Inspected:Review of Chemistry Program Re Plant Water Quality & Analytical Capabilities IR 05000282/19980161998-10-0909 October 1998 Insp Repts 50-282/98-16 & 50-306/99-16 on 980810-28. Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected:Review of Fire Protection Project self- Assessment IR 05000282/19980151998-10-0909 October 1998 Insp Repts 50-282/98-15 & 50-306/98-15 on 980731-0910. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000282/19980131998-08-21021 August 1998 Insp Repts 50-282/98-13 & 50-306/98-13 on 980727-31.No Violations Noted.Major Areas Inspected:Review of Physical Security Program IR 05000282/19980091998-08-19019 August 1998 Insp Repts 50-282/98-09 & 50-306/98-09 on 980619-0730.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980121998-08-14014 August 1998 Insp Repts 50-282/98-12 & 50-306/98-12 on 980720-24.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000282/19980141998-08-11011 August 1998 Insp Repts 50-282/98-14 & 50-306/98-14 on 980720-24.No Violations Noted.Major Areas Inspected:Review of Pcp,Storage & Processing of Solid Radwaste & Shipment & Disposal of Radioactive Matl IR 05000282/19980101998-07-10010 July 1998 Insp Repts 50-282/98-10 & 50-306/98-10 on 980605-12. Violations Noted.Major Areas inspected:on-site Insp Into Circumstances Surrounding Unit 1 RT Due to Dropped CR & Actions Taken for Recovery to Safe Shutdown on 980605 IR 05000282/19980081998-06-28028 June 1998 Insp Repts 50-282/98-08 & 50-306/98-08 on 980512-0618.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19980051998-04-0606 April 1998 Insp Repts 50-282/98-05 & 50-306/98-05 on 980225-0328.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000282/19980041998-04-0101 April 1998 Insp Repts 50-282/98-04 & 50-306/98-04 on 980210-13 & 0316-20.No Violations Noted.Major Areas Inspected:Rp Performance During Unit 1 Refueling Outage & Unit 2 Forced Outage,Calibration of Radiation Monitoring Sys ML20216E4841998-03-12012 March 1998 Insp Repts 50-282/98-03 & 50-306/98-03 on 980114-0224. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000282/19970231998-01-30030 January 1998 Insp Repts 50-282/97-23 & 50-306/97-23 on 971203-980113. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20198A4441997-12-23023 December 1997 Insp Repts 50-282/97-19 & 50-306/97-19 on 970929-1003,21-23 & 1202.Violations Noted.Major Areas Inspected:Licensed Reactor Operator & SRO Requalification Training Program IR 05000282/19970211997-12-15015 December 1997 Insp Repts 50-282/97-21 & 50-306/97-21 on 971022-1202.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19970201997-12-0505 December 1997 Insp Rept 50-282/97-20 on 971026-30 & 1117-19.No Violations Noted.Major Areas Inspected:Licensee Steam Generator Insp Program IR 05000282/19970221997-11-24024 November 1997 Insp Repts 50-282/97-22 & 50-306/97-22 on 971028-31.No Violations Noted.Major Areas Inspected:Plant Support Performance Re Refueling Outage,Surveys to Unconditionally Release Turbine Components & Shut Down Chemistry IR 05000282/19970181997-11-14014 November 1997 Insp Repts 50-282/97-18 & 50-306/97-18 on 970910-971021.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19970171997-10-0404 October 1997 Insp Repts 50-282/97-17,50-306/97-17 & 72-0010/97-17 on 970825-29 & 970908-12.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program IR 05000282/19970161997-09-25025 September 1997 Insp Repts 50-282/97-16,50-306/97-16 & 72-0010/97-16 on 970806-0909.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000282/19970141997-08-21021 August 1997 Insp Repts 50-282/97-14 & 50-306/97-14 on 970714-18.No Violations Noted.Major Areas Inspected:Various Aspects of Licensee Radiation Protection Program,W/Emphasis on Listed Areas IR 05000282/19970111997-07-24024 July 1997 Insp Repts 50-282/97-11 & 50-306/97-11 on 970514-0625. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19970131997-07-18018 July 1997 Security Insp Repts 50-282/97-13 & 50-306/97-13 on 970602-06.No Violations Noted.Major Areas Inspected:Physical Security Program ML20149F3191997-07-16016 July 1997 Insp Repts 50-282/97-08 & 50-306/97-08 on 970414-0613. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering for AFW Sys & Parts of Control Room Ventilation IR 05000282/19970101997-07-0101 July 1997 Insp Repts 50-282/97-10 & 50-306/97-10 on 970519-29.No Violations Noted.Major Areas Inspected:Ep Program,Including Emergency Response Facilities,Equipment & Supplies IR 05000282/19970091997-06-0202 June 1997 Insp Repts 50-282/97-09,50-306/97-09 & 72-0010/97-09 on 970405-0513.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000282/19970051997-05-0101 May 1997 Insp Repts 50-282/97-05,50-306/97-05 & 72-0010/97-05 on 970221-0404.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000306/19970061997-04-30030 April 1997 Insp Rept 50-306/97-06 on 970311-17.Violations Noted.Major Areas Inspected:Mispositioning of Pressurizer Vent Valve During Execution of Procedure 2D8 Filling & Venting Reactor Coolant Sys IR 05000282/19970071997-04-30030 April 1997 Insp Repts 50-282/97-07 & 50-306/97-07 on 970407-08 & 970416.No Violations Noted.Major Areas Inspected:Review of Vehicle Barrier System ML20136J4851997-03-14014 March 1997 Insp Repts 50-282/97-03 & 50-306/97-03 on 970203-13. Violations Noted.Major Areas Inspected:Performance of Listed Activities ML20135D4121997-02-25025 February 1997 Insp Repts 50-282/97-02 & 50-306/97-02 on 970108-0220. Violation Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19970041997-02-23023 February 1997 Insp Repts 50-282/97-04 & 50-306/97-04 on 970203-07.No Violations Noted.Major Areas Inspected:Inspector Reviewed Several ALARA Reviews & RWPs 1999-09-09
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000282/19990141999-10-19019 October 1999 Insp Repts 50-282/99-14 & 50-306/99-14 on 990920-22. Violations Noted.Major Areas Inspected:Heat Sink Performance IR 05000282/19990121999-10-0606 October 1999 Insp Repts 50-282/99-12 & 50-306/99-12 on 990823-0917.No Violations Noted.Major Areas Inspected:Methods Used for Identification,Cause Investigation & Correction of Quality Related Problems IR 05000282/19990071999-09-28028 September 1999 Insp Repts 50-282/99-07 & 50-306/99-07 on 990721-0831. Non-cited Violations Noted.Major Areas Inspected:Followup Y2K Readiness Review IR 05000282/19990101999-09-10010 September 1999 Insp Repts 50-282/99-10 & 50-306/99-10 on 990809-12. Non-cited Violations Noted.Major Areas Inspected:Physical Protection Cornerstone,Within Safeguards Strategic Assessment Area IR 05000282/19990111999-09-0909 September 1999 Insp Repts 50-282/99-11 & 50-306/99-11 on 990816-20.NCV Noted.Major Areas Inspected:Public Radiation Safety & Included Review of Performance Indicators for Occupational & Public Radiation Safety IR 05000282/19990091999-08-17017 August 1999 Insp Repts 50-282/99-09 & 50-306/99-09 on 990719-22. Violations Noted.Major Areas Inspected:Reactor Safety, Emergency Preparedness & Review of Performance Indicators for Reactor Safety & Emergency Preparedness IR 05000282/19990061999-08-12012 August 1999 Insp Repts 50-282/99-06 & 50-306/99-06 on 990601-0720.One NCV Occurred.Major Areas Inspected:Activities Related to Reactor Safety,Verification of Performance Indicators,Event Followup & Compliance with Commission Rules & Regulations IR 05000282/19993011999-07-0202 July 1999 NRC Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) (Including Completed & Graded Tests) for Tests Administered During Week of 990517-21.Two Applicants Passed All Sections of Exam & Were Issued Licenses IR 05000282/19990041999-06-30030 June 1999 Insp Repts 50-282/99-04 & 50-306/99-04 on 990407-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19990051999-05-25025 May 1999 Insp Repts 50-282/99-05 & 50-306/99-05 on 990426-30.No Violations Noted.Major Areas Inspected:Review of Licensee Radiation Protection Performance During Unit 1 Refueling Outage,Shutdown Chemistry & Crud Burst IR 05000282/19990021999-05-0404 May 1999 Insp Repts 50-282/99-02 & 50-306/99-02 on 990226-0406.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 07200010/19990011999-04-29029 April 1999 Insp Rept 72-0010/99-01 on 990308-0413.No Violations Noted. Major Areas Inspected:Direct Observation of Various Portions of Loading of Eighth & Ninth Dry Fuel Storage Casks from SFP to ISFSI Located Away from Main Protected Area of Site IR 05000282/19990031999-04-16016 April 1999 Insp Repts 50-282/99-03 & 50-306/99-03 on 990322-26.No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000282/19990011999-03-18018 March 1999 Insp Repts 50-282/99-01 & 50-306/99-01 on 990115-0225.No Violations Noted:Licensee Operations,Maint,Engineering & Plant Support IR 05000282/19980231999-01-29029 January 1999 Insp Repts 50-282/98-23 & 50-306/98-23 on 981204-990114.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support PNO-III-99-001, on 990105,Unit 1 Station Auxiliary Transformer Exploded Ignited Oil Fire.Fire Extinguished within 15 Minutes by Onsite Fire Brigade.Unit 2 Operating at 60 Percent Power,Was Not Affected by Explosion & Fire1999-01-0606 January 1999 PNO-III-99-001:on 990105,Unit 1 Station Auxiliary Transformer Exploded Ignited Oil Fire.Fire Extinguished within 15 Minutes by Onsite Fire Brigade.Unit 2 Operating at 60 Percent Power,Was Not Affected by Explosion & Fire IR 05000282/19980201998-12-18018 December 1998 Insp Repts 50-282/98-20 & 50-306/98-20 on 981023-1203.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000306/19980211998-12-17017 December 1998 Insp Rept 50-306/98-21 on 981116-24.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage Cycle 19 IR 05000282/19980221998-12-0101 December 1998 Insp Repts 50-282/98-22 & 50-306/98-22 on 981116-20.No Violations Noted.Major Areas Inspected:Licensee Radiation Protection Performance During Unit 2 Refueling Outage IR 05000282/19980181998-11-18018 November 1998 Insp Repts 50-282/98-18 & 50-306/98-18 on 980911-1022.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-III-98-051, on 981029,Prairie Island Unit 1 Automatically Tripped from 100 Percent Power Due to Negative Flux Rate Reactor Flux Rate Trip Signal.Nrc Resident Inspectors Are Monitoring Licensee Investigation & Repair Activities1998-11-0202 November 1998 PNO-III-98-051:on 981029,Prairie Island Unit 1 Automatically Tripped from 100 Percent Power Due to Negative Flux Rate Reactor Flux Rate Trip Signal.Nrc Resident Inspectors Are Monitoring Licensee Investigation & Repair Activities IR 05000282/19980191998-10-29029 October 1998 Insp Repts 50-282/98-19 & 50-306/98-19 on 981013-16.No Violations Noted.Major Areas Inspected:Review of Chemistry Program Re Plant Water Quality & Analytical Capabilities IR 05000282/19980151998-10-0909 October 1998 Insp Repts 50-282/98-15 & 50-306/98-15 on 980731-0910. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000282/19980161998-10-0909 October 1998 Insp Repts 50-282/98-16 & 50-306/99-16 on 980810-28. Apparent Violations Being Considered for Escalated Ea.Major Areas Inspected:Review of Fire Protection Project self- Assessment ML20154M0691998-10-0909 October 1998 Notice of Violation from Insp on 980731-0910.Violation Noted:On 980901,maint Workers Failed to Follow Procedural Requirements,Of Sp 1180.2,Rev 8,Steps 7 & 8,when Workers Did Not Gain Access to Both Sides of Filter Bank IR 05000282/19980131998-08-21021 August 1998 Insp Repts 50-282/98-13 & 50-306/98-13 on 980727-31.No Violations Noted.Major Areas Inspected:Review of Physical Security Program IR 05000282/19980091998-08-19019 August 1998 Insp Repts 50-282/98-09 & 50-306/98-09 on 980619-0730.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000282/19980121998-08-14014 August 1998 Insp Repts 50-282/98-12 & 50-306/98-12 on 980720-24.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000282/19980141998-08-11011 August 1998 Insp Repts 50-282/98-14 & 50-306/98-14 on 980720-24.No Violations Noted.Major Areas Inspected:Review of Pcp,Storage & Processing of Solid Radwaste & Shipment & Disposal of Radioactive Matl IR 05000282/19980101998-07-10010 July 1998 Insp Repts 50-282/98-10 & 50-306/98-10 on 980605-12. Violations Noted.Major Areas inspected:on-site Insp Into Circumstances Surrounding Unit 1 RT Due to Dropped CR & Actions Taken for Recovery to Safe Shutdown on 980605 ML20236N9941998-07-10010 July 1998 Notice of Violation from Insp on 980605-12.Violation Noted: on 980605,emergency Operating Procedure 1ES-0.1,rev 13 Lacked Adequate Guidance for Dumping Steam Using SG Power Operated Relief Valves W/Ms Isolation Valves Closed IR 05000282/19980081998-06-28028 June 1998 Insp Repts 50-282/98-08 & 50-306/98-08 on 980512-0618.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-III-98-032, on 980605,unit 1 Experienced Automatic Reactor Trip When Control Rod Dropped Into Reactor Core. Caused by Blown Fuse on Stationary Gripper Coil Due to Ground in Wiring to Coil1998-06-0909 June 1998 PNO-III-98-032:on 980605,unit 1 Experienced Automatic Reactor Trip When Control Rod Dropped Into Reactor Core. Caused by Blown Fuse on Stationary Gripper Coil Due to Ground in Wiring to Coil ML20248M1341998-06-0505 June 1998 Notice of Violation from Insp on 980329-0511.Violation Noted:Licensee Identified & Took Corrective Actions of Concerns W/Potential Effects of Flooding from Feedwater Line Break on Ability of Main Isolation Valves to Close ML20248J4971998-06-0404 June 1998 Notice of Violation from Investigation Rept 3-97-034, Completed on 980211.Violation Noted:Suppl 2,dtd 970212,to License Amend Request,Dtd 970129, Amend of Cooling Water Sys Emergency Intake Design Basis, Was Not Complete ML20248B3061998-05-26026 May 1998 Notice of Violation from Insp on 980330-0409.Violation Noted:On 980401,inspectors Observed Plant Operator Hang Secure Tag Associated W/Wo 9801216 on Number 21 Safety Injection Pump Motor Control Ctr W/O Performing Dead Test IR 05000282/19980011998-05-0101 May 1998 SALP Repts 50-282/98-01 & 50-306/98-01 for 960218-980328 IR 05000282/19980051998-04-0606 April 1998 Insp Repts 50-282/98-05 & 50-306/98-05 on 980225-0328.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000282/19980041998-04-0101 April 1998 Insp Repts 50-282/98-04 & 50-306/98-04 on 980210-13 & 0316-20.No Violations Noted.Major Areas Inspected:Rp Performance During Unit 1 Refueling Outage & Unit 2 Forced Outage,Calibration of Radiation Monitoring Sys ML20216E4841998-03-12012 March 1998 Insp Repts 50-282/98-03 & 50-306/98-03 on 980114-0224. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20216E4621998-03-12012 March 1998 Notice of Violation from Insp on 980114-0224.Violation Noted:On 980121,instructions in Work Order 9800310, Isolate Breaker 1H3, Were Not Appropriate to Circumstances Because Loss of Offsite Power Source to Unit 2 Occurred PNO-III-98-011A, on 980124,licensee Shut Down Unit 2 to Investigate Reactor Coolant Leak Associated with Control Rod Drive Mechanism G-9.Licensee Identified Source of Leak as 3/4 Inch through-wall Crack in Manufacturing Weld1998-02-13013 February 1998 PNO-III-98-011A:on 980124,licensee Shut Down Unit 2 to Investigate Reactor Coolant Leak Associated with Control Rod Drive Mechanism G-9.Licensee Identified Source of Leak as 3/4 Inch through-wall Crack in Manufacturing Weld ML20202C0451998-01-30030 January 1998 Notice of Violation from Insp on 971203-980113.Violation Noted:On 971210,Maint Procedure D32,Rev 6,was Not Allowed for Unit 1 When RO & Nuclear Engineer Coordinating Procedure on Two Occasions,Failed to Do Five Degree Cooldown & Heatup IR 05000282/19970231998-01-30030 January 1998 Insp Repts 50-282/97-23 & 50-306/97-23 on 971203-980113. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support PNO-III-98-011, on 980123,unidentified Leakage Increased by Approx 10 to 0.2 Gallons Per Minute.Licensee Began Preparations to Shut Down & Repair Leak in Canopy Seal1998-01-26026 January 1998 PNO-III-98-011:on 980123,unidentified Leakage Increased by Approx 10 to 0.2 Gallons Per Minute.Licensee Began Preparations to Shut Down & Repair Leak in Canopy Seal ML20198A4171997-12-23023 December 1997 Notice of Violation from Insp on 970929-1003.Violations Noted:On 960724,licensee Implemented Procedure Swi O-10, Operations Manual Usage, Rev 28,section 6.11.9,which Contained Inadequate Instructions ML20198A4441997-12-23023 December 1997 Insp Repts 50-282/97-19 & 50-306/97-19 on 970929-1003,21-23 & 1202.Violations Noted.Major Areas Inspected:Licensed Reactor Operator & SRO Requalification Training Program IR 05000282/19970211997-12-15015 December 1997 Insp Repts 50-282/97-21 & 50-306/97-21 on 971022-1202.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000282/19970201997-12-0505 December 1997 Insp Rept 50-282/97-20 on 971026-30 & 1117-19.No Violations Noted.Major Areas Inspected:Licensee Steam Generator Insp Program IR 05000282/19970221997-11-24024 November 1997 Insp Repts 50-282/97-22 & 50-306/97-22 on 971028-31.No Violations Noted.Major Areas Inspected:Plant Support Performance Re Refueling Outage,Surveys to Unconditionally Release Turbine Components & Shut Down Chemistry 1999-09-09
[Table view] |
Text
.
.
.
.
.. _ ___
_ __
_
.. -. _.
_ _.. _. _. _ -..
.
.~.
.
.
U.S. NUCLEAR REGULATORY COMMISSION REGION lil l
.
.
Docket Nos:
50-282: 50-306 Licenses No:
DPR-22; DPR-60 i
Reports No:
50-282/97010(DRS); 50-306/97010(DRS)
Licensee:
Northern States Power Company Facility:
Prairie Island Nuclear Generating Plant Location:
1717 Wakonade Dr. East Welch, MN 55089 i
Dates:
May 19 - 29,1997 Inspector:
Robert D. Jickling, Emergency Preparedness Analyst Approved by:
James R. Creed, Chief, Plant Support Branch 1 Division of Reactor Safety
i
.
.
i 9707080044 970701
~
'
PDR ADOCK 05000282 G
PDR i
-
_
_.
.___ _
.
_. _. __- ___.
_ _ _ _ _ _ _.
_______.__y i
.
i-l
EXECUTIVE SUMMARY Prairie Island Nuclear Generating Plant NRC Inspection Reports 50-282/97010; 50-303/97010
This inspection included a review of the Emergency Preparedness (EP) program, an aspect i
of Plant Support. This was an announced inspection conducted by a regional emergency preparedness analyst.
!
Emergency response facilities, equipment, and supplies were in an excellent state of
{
operational readiness. Interviews with emergency response organization personnel i
l-demonstrated very good to excellent knowledge of emergency implementing procedures and responsibilities. Management support was strong.
'
'
The overall effectiveness of the licensee's emergency preparedness facilities,
,
equipment, training, and organization was very good. (Sections P2.1, P3, P5, and j
'
P6)
{
. Licensee personnel appropriately declared an Unusual Event during an actual
j activation of the EP Plan. Emergency classification was correct and offsite j
notifications were timely. (Section P1.1)
j The extensive planning and flood preparation by the EP Coordinator and plant
personnel were effective. The numerous flood planning meetings and interface
.
I strengthened contacts already established with the offsite agencies for emergency j
preparedness and made it possible to rapidly accomplish all the activities conducted i
during the floods. (Section P1.2)
2 The emergency response facilities were in excellent material condition and in a state
l of operational readiness. Several pieces of equipment and instruments were
,
j demonstrated to be fully functional by the EP staff. (Section P2.1)
Interviews with key emergency response organization personnel demonstrated very
good knowledge of the emergency implementing procedures and responsibilities.
(Section PS)
I Management support for the EP program was strong, as demonstrated through
l discussions with the EP Coordinator, and the recent program upgrades and enhancements. The EP staff was proactive in maintaining and improving the j
program and responsive to identified issues. (Section P6)
!
The audits of EP activities satisfied the requirements of 10 CFR 50.54(t) and were
2-very good in scope and detail. (Section P7)
The inspector completed Temporary Instruction 2515/134 "Onshift Dose
,
Assessment Capabilities" and verified that the licensee's capabilities met
'
requirements. (Section P9)
!
j
,
.. -,,.
,,
-.. -..
.
. _.
-. _-
.
.
- -....- -
.
....
-- -.. - -.-_
.
...
-
.
.
i I
Report Details J
.
IV. Plant Suncort
!
[
P1 Conduct of Emergency Preparedness (EP) Activities i
.
i P1.1 Actual Emeroency Plan Activations
,
i
a.
Insoection Scone (82701)
!
"
The inspector reviewed records and documentation packages regarding plant
response for an actual emergency event which occurred during 1996.
ll b.
Observations and Findinas
,
[
An Unusual Event was dec;ared at 3:05 p.m. on June 29,1996, when both units
tripped due to generator lockouts when severe storms caused the loss of three of j
five offsite power lines for the plant. The Shift Manager requested the callout of F
the Emergency Response Organization (ERO) to assist the Control Room for the
!
event. The Unusual Event was terminated at 10:35 a.m. on June 30,1996, when the licensee secured the diesel generators and restored the required minimum
number of offsite power sources.
The event was reviewed and a detailed evaluation package was compiled by the EP
Coordinator. The package contained an evaluation of the plant personnel's event
response, ERO callout time reports, Quality Services Observation Reports, offsite l
notification forms, control room logs, procedure checklists, and areas for j
improvement.
c.
Conclusions
.
t The inspector concluded that the licensee appropriately implemented the emergency j
plan in declaring the Unusual Event. The emergency classification was made correctly and offsite notifications were timely. The evaluation performed by the EP
j Coordinator was very thorough and provided an excellent assessment of the plant's response to the actual event, identified issues and corrective actions, and provided i
important feedback to management.
i P1.2 1997 Flood Prenarations a.
Scone (82701)
in mid February 1997, the National Weather Service issued a moderate to severe Spring flood forecast for the Prairie Island Nuclear Generating Plant (PINGP) area, The EP Coordinator and other PINGP personnel began preparation for Spring floods with a number of offsite agancy meetings and then initiated the actions agreed upon at the meetings.
-
.
_
_
__
,
_ _. _ _. _. _ _ _ _. _. _.. _ _ _ _. _. _.. _.. _. _. _..
.
. _... _.. _. _
.___
<
.
.
b.
Observations and Findinas l
l On February 27, the National Weather Service pr'edicted a Spring flood forecast
!-
crest of 685.8 feet. As a result of the forecast, the first Red Wing /Goodhue County Flood Meeting with State of Minnesota, Goodhue County, City of Red Wing, Prairie Island Indian Community, and Treasure Island Casino personnel was
held. A decision was made at the meeting to move up the start date of the
'
Sturgeon Lake Road construction from early April to early March. The purpose of this construction was to elevate the primary Island access road approximately six
,
!'
feet above existing road levels.
i
in March, plant staff held. vo flood meetings which included discussions of j
historical flood levels, current flood forecasts, and changes to the plant's flood l
procedure. By the end of March, the National Weather Service began issuing three day flood forecasts. Construction to elevate Sturgeon Lake Road six feet was e
started.
In early April, plant staff initiated daily flood meetings in which additional details were developed for the flood procedure. A second Red Wing /Goodhue County Flood Meeting was conducted and included the sharing of the flood preparation work that was underway by each of the participants' agencies. Road construction did not restrict PINGP employees, residents, or Casino patrons. The construction company ensured continued access to the island throughout the forecasted flood level crest. Housing alternatives were identified for commuting Wisconsin residents in case U.S. Highway 63 or U.S. Highway 10 were closed due to high water.
On April 9, alternative transportation was arranged in case the new road construction was to fail and consisted of two pontoon boats, boat docks, and onsite and offsite transportation. The Operations Committee approved an Emergency Planning Special Order which would institute partial augmentation of onshift personnel in the event of a declaration of an Unusual Event. River level was 683.8 feet, approximately 4.8 feet below the lowest current point on Sturgeon Lake Road. The PINGP Emergency Plan classification level for an Unusual Event was identified at a river elevation of 686 feet. The Alert classification level of 692 feet was also the Technical Specification level required for the reactor to be shutdown.
On April t0, the Plant Manager issued an information letter to residents near the plant and to tribal representatives concerning PINGP flood planning, and informing the residents that the road project should provide access to the island, and that alternate transportation had been arranged in case the new road was lost. The EP Coordinator also transmitted a description of emergency planning considerations to the Minnesota Department of Public Safety and the tribal representative.
On April 12 and 13, the river crested at an elevation of 685 feet and by April 14, the river had lowered to 684.8 feet.
Lessons learned from the planning and actions taken for the predicted floods was incorporated into the EP program and included:
..
-
-
.
-.
_______.__._..___.___-._.____.._-._._m..___
._.
.
.
i
!
- a new EP implementing procedure for an emergency and flooding conditions
surveillance needs for various onsite monitoring locations
!,
e
- monitoring of offsite communications switch boxes
alternative transportation considerations
j public information for island residents
j flood protection for screenhouse equipment
i onsite housing arrangements if the highways are closed
?
.
.
l.
c.
Conclusions
!
!
The extensive planning and flood preparation by the EP Coordinator and plant l
personnel were effective. Significant additions and changes to plant procedures
)
l resulted from lessons learned. The numerous flood planning meetings and interface
strengthened contacts already established with the offsite agencies for emergency preparedness and made it possible to rapidly accomplish the numerous activities conducted during the floods.
I P2 Status of EP Facilities, Equipment, and Resources P2.1 Material Condition of Emeroency Resoonse Facilities a.
Insnection Scone (82701)
The inspector evaluated the material condition of the Control Room, Technical Support Center (TSC), Operational Support Center (OSC), Emergency Operations
'
Facility (EOF), and EOF Counting Room. The field survey team kits were also inspected. The licensee demonstrated the operability of several pieces of equipment, including radiological survey equipment, communications equipment, field survey team vehicles, and computer terminals.
b.
Observations and Findinas Copies of the Emergency Plan implementing Procedures (EPIPs) were current and available in the Control Room. The TSC and field survey team kits were in a state of operational readiness. The facility, status boards, and equipment were in excellent material condition. The OSC was in excellent material condition and the newly added electronic dosimetry and radiation protection information computers were available and functional. The EOF was in excellent material condition and radiological instruments and equipment were calibrated, functional, and in very good order. The dose assessment computers and printers were verified operable.
Communications systems were functional in the TSC and EOF. A new 800 megahertz radio system had been installed in the ERFs which provided an improved on and offsite communications capability.
EP staff demonstrated the operability of offsite field survey team vehicles, new 800 megahertz radios, radiological survey equipment, various communications lines, the new TSC cordless microphone and speaker system, and computer terminals for display of plant data and dose assessment programs for onshift, TSC, and EOF meteorological and dose assessment information.
,
,
i
'
1-i
..
.
.
...
.. -.
..
-
-.
-_ - - _ -
-
i
.
,
The inspector reviewed records for the Public Alert Notification System (PANS)
'
sirens for 1996 and 1997. Reported annual operability for 1996 was 96.6 percent.
The reported twelve month rolling operability average for 1997 was currently 96.5 percent. Siren operability exceeded the minimum acceptability limit of greater than
,
or equal to 90 percent.
.
c.
Conclusions
. The emergency response facilities were in excellent material condition and in a state
of operational readiness. Numerous pieces of equipment and instruments were l
operated by the EP staff and verified to be functional. The PANS sirens had been appropriately maintained in 1996 and 1997, as indicated by the reported operability
-
averages.
P3 EP Procedures and Documentation a.
Insoection Scooe (82701)
The inspector reviewed and evaluated a selection of ;fnergency Plan sections and
'
EPIPs. They included Emergency Flen Section 4, RLvbion 18, " Emergency Conditions," EP Plan Section 6, Revision 18, " Emergency Measures," EPIP F3-3, i
Revision 14. " Responsibilities During a Notification of Unusual Event," EPIP F3-5, Revision 19, " Emergency Notifications," and EPIP F3-5.3, Revision 4, " Response To Railroad Grade Crossing Blockage."
b.
Qhrgvations and Nndinos Emergency Plan Section 4, Revision 18, added a statement that Annex A contained a summary of the Emergency Classifications and Emergency Action Level (EAL)
scheme with examples of initiating conditions. Section 6 identified tae State of Wisconsin Department of Emergency Management will be notified tiat the Shift Emergency Communicator (SEC) and that the Mdewankaton Indian Community Representatives would be notified via the Treasure Island Casino Security Dispatch
~
Center. Section 6.3, " Summary of Site Response Actions," identified that the State and local offsite authorities were to be promptly informed of emergency conditions as soon as discovered. EPIP F3-4, Revision 24, " Responsibilities During
An Alert, Site Area, Or General Emergency," appropriately identified that State, local, and Northern States Power (NSP) personnel are to be notified immadiately. A note indicated that the NRC notification is required as soon as practical but no later
,
than one hour after the declaration of the emergency.
i EPIP F3-3, Revision 14, clearly identified that the Shift Manager could augment the onsite staff or activate the ERO as he deemed necessary. EPIP F3-5.3 effectively identified the normal and emergency procedules fcr contacting the railroad company in the event of blockage of the plant's access.
-. -.
-
.
- -
_
._ m
_ _ _ _. _ _. _.. _. _. _ _ _ _ _ _.
_
_. _. _ _ - - _ _ _ - _ _
.
.
a
.
.
$
c.
Conclusions
-
The EPIPs were clear and easy to use. Current copies of the EPIPs and Emergency Plan were available in all the emergency response facilities. No problems were j
identified in the procedures or documents reviewed.
.
P5 Staff Training and Qualification in EP a.
Insoection Scot,e (82701)
"
The inspector interviewed five key ERO personnel, reviewed training attendance records, ERO Training Records and the Emergency Notification Duty Roster, dated
>
l April 30,1997. Also, selected training instructor's guides were reviewed by the i
inspector, including CP-10-17-00-01, "TSC Walkthrough" and " EOF Walkthrough."
Additionally, a portion of the Severe Accident Management Guidance (SAMG)
training provided to plant management and personnel was observed by the
-
inspector.
b.
Observations and Findinas p
interviews with key ERO personnel included an EOF Emergency Manager, Control Room Emergency Director, TSC Emergency Director, and two Security Lieutenants
'
identified as SECS. Interviewed personnel generally demonstrated very good knowledge of emergency procedures and their responsibilities. They indicated that
'the EP and training programs were very good and that staff were always looking for
,
ways to improve the program.
i i
The TSC Emergency Director demonstrated knowledge of the NRC's and i
Department of Energy's incident response. Federal incident response information
'
had been incorporated in the licensee's training lesson plans for TSC Coordinators, Emergency Managers, Emergency Directors, Radiological Protection Support
'
Supervisors, Radiological Emergency Coordinators, OSC Coordinators, and Technical Support Supervisors.
The May 1,1997, ERO Training List printouts were reviewed and compared to the
,
Emergency Notification Duty Roster. Records and documents indicated all ERO personnel reviewed were currently qualified for their positions.
!
I The inspector observed a portion of SAMG training pertaining to severe accident progression and phenomena which was conducted on May 22,1997. The instructor was very knowledgeable and effectively presented the material. Handout
,
materials and projected graphics were of high quality. Questions from the audience were answered effectively.
c.
Conclusions Overall, EP training was considered effective. Training and drill crit;que documentation was available. Critique forms were adequately detailed. Training records we'c :omplete. Interviewed ERO personnel demonstrated very good to excellent knowledge of their ERO responsibilities, emergency procedures, and an
-
- -.
_
_
-
.
... _,
..
__..
. _ - - - -
-. - -
_-_ -
-
-. -.,
- _ _ - -
.
.
t
,
adequate knowledge of NRC and Federalincident response. SAMG training was effective and detailed.
P6 EP Organization and Administration (82701)
,
a.
Insoection Scone (82701)
The inspector discussed the current station organization and changes to the EP
program with the EP Coordinator.
b.
Observations and Findinas The EP Coordinator reported to the General Superintendent of Radiation Protection and Chemistry, who reported to the Plant Manager. Discussion with the EP Coordinator indicated that management support for the EP program was very good
'
under the current plant organization.
Strong management support to the EP program was indicated by several equipment upgrades as well as other enhancements to the program. Upgrades and
-
enhancements included the new 800 megahertz plant radios (also installed in the
-
field survey team vehicles), additional emergency facility walkthroughs and drills, SAMG procedures and training, additional long range pagers for selected ERO management personnel, dosimetry monitoring computers added to the OSC, new radiological survey meters and information forms for the field survey teams, and the revised EAL format and classification procedure.
The EP staff displayed a proactive attitude, which was demonstrated by ths extensive flood preparations, program enhancements, and upgrades. Aly.,,
interviewed key ERO personnelindicated that the EP Coordinator and staff has been responsive to issues identified in training, drills, and exercises.
c.
ConclusioD1 Management support to the EP program has been strong as indicated by discussions with the EP Coordinator and the program upgrades. The EP staff was proactive in maintaining and improving the program and responsive to identified issues.
P7 Quality Assurance in EP Activities P7.1 Audits (82701)
a.
Insoection Scooe (82701)
The inspector reviewed Quality Services audits for 1990 and 1997. Numerous observation reports had been performed during the years covering different areas of
<
the EP program and were compiled by the EP Coordinator.
-
- -
.
.
.
h.
b.
Observations and Findinas
![
- The 1996 and 1997 audits and observation reports by Quality Services for the 12 U
- month review of the EP program met the requirements of 10 CFR 50.54 (t). The method used to assess the adequacy of the States and local government interfaces with the licensee was accomplished by attending quarterly Radiological Emergency Planning (REP) meetings with the States of Wisconsin and Minnesota, Counties of Dakota,Goodhue/ City of Red Wing, and Pierce, Indian Community, and casino representatives. The auditors observed the interfaces between the licensee and offsite agencies at these REP meetings. Additionally, the Quality Services Department provided telephone surveys of some of the offsite agencies to verify their observations from the meetings.
c.
Conclusi.901 The licensee's 1996 and 1997 Observation Reports of EP activities were effective and satisfied the requirements of 10 CFR 50.54(t).
The observation reports appropriately documented program activities and numerous elements of the EF Program and were of very good scope and detail. Strengths and weaknesses were identified. Corrective actions from previous year's findings were tracked.
.P8 Miscellaneous EP lasues P8.1 (Onen) Insnection Followun item 50-282/96006-09: 50-306/96006-09: During the 1996 emergency exercise, the OSC Coordinator was unable to ascertain the status of emergency response teams from the team status board. Appropriate corrective actions were in progress anii discussed with the'EP Coordinator. This item will remain open pending observat'on of the July 21,1998, Evaluated Emergency Exercise.
P8.2 (Open) Insoection Followun item 50-282/96006-10: 50-306/96006-10: During the 1996 emergency exercise, the EOF communicators did not initially transmit a protective action recommendation change notification form to the State Emergency Operations Center. Thorough corrective actions were in progress and discussed with the EP Coordinator. This item will remain open pending observation of the July 21,1998, Evaluated Emergency Exercise.
P8.3 (Onen) Insoection Followuo item 50-282/96006-11: 50-306/96006-11: During the 1996 emergency exercise, the EOF staff was slow to recognize that the General Emergency classification had been met without needing a safety injection to occur.
Corrective actions including procedure changes and training were in progress and discussed with the EP Coordinator.- This item will remain open pending observation of the July 21,1998, Evaluated Emergency Exercise.
P9 Temporary instruction (TI) 2515/134 Onshift Dose Assessment The inspector discussed onshift dose assessment capability and provisions with licensee personnel, reviewed the Emergency Plan and EPIPs, and inspected the equipment utilized for dose assessment. The Emergency Plan arid EPIPS contained provisions for onshift dose assessment. Necessary equipment and personnel
9
.
-
.
training were available and provided. Personnel were know!adgeable of their responsibilities and how to perform dose assessment. The acceptance criteria for the Tl were met and this Tl is closed. Documentation as to these findings is attached as Attachment A.
X1 Exit Meeting Summary The inspector presented the inspection results to members of licensee management at the conclusion of the inspection on May 23,1997. The licensee acknowledged the findings presented. The inspector reviewed documentation regarding the 1997 island flooding and telephoned the licensee with his findings on May 29,1997.
The inspector asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
i
.. -
-
--
_.. -
.-.. - -.. -
.. _ - -. - ~ _.
..
-
PARTIAL LIST OF PERSONS CONTACTED Licensee i
J. Sorensen, Plant Manager
'
D. Schuelke, General Superintendent Radiation Protection and Chemistry M. Ladd, Training issues Manager J. Hill, Quality Manager M. Agen, Emergency Preparedness Coordinator J. Payton, Sr. Technical Instructor J. Leveille, Licensing Engineer L. Hoskins, Sr. Quality Specialist D. Schlintz, Quality Specialist INSPECTION PROCEDURES USED
!
IP 82701 Operational Status of the Emergency Preparedness Program Tl 2515/134 Temporary Instruction, Onshift Dose Assessment ITEMS OPENED, CLOSED, AND DISCUSSED OPEN None CLOSED None DISCUSSED 50-282/306-96006-09 IFl OSC Coordinator was unable to ascertain the status of emergency response teams from the team status board.
50-282/306-96006-10 IFl EOF Communicators did not initially transmit a protective action recommendation notification form to the State EOC.
50-282/306-96006-11 IFl EOF staff was slow to recognize that the General Emergency classification had been met without needing a safety injection.
i
_ _. _ _
__
_. _ _ _ _ _ _. _.. _ _
. _ _.__
.
_
._
-
.
LIST OF ACRONYMS USED
,
CFR Code of Federal Regulations EAL Emergency Action Level ENS Emergency Notification System EOC Emergency Operations Center EOF Emergency Operations Facility EP Emergency Preparedness EPIP Emergency Plan Implementing Procedure ERO Emergency Response Organization HPN Health Physics Network IP inspection Procedure IR
Inspection Report
IFl
inspection Followup Item
NRC
Nuclear Regulatory Commission
NSP
Northern States Power
OSC
Operational Support Center
PINGP
Prairie Island Nuclear Generating Plant
REP
Radiological Emergency Planning
SAMG
Severe Accident Management Guidance
SEC
Shift Emergency Communicators
,
Tl
Temporary Instruction
TS
Technical Specification
TSC
Technical Support Center
l
UFSAR
Updated Final Safety Analysis Report
USAR
Updated Safety Analysis Report
i
i
_.
.-
_.
.
-
..
....
-
FORM FOR DOCUMENTATION OF ON-SHIFT DOSE ASSESSMENT CAPABILITY
'
Pr-iri* Island / Units 1&2/ 50-282: 50-306
North *rn St-trs Power Comp =nv
10/03/96
SITE / UNIT / DOCKET #s
LICENSEE
DATE
,
4.01
DOSE ASSESSMENT COMMITMENTIN EMERGENCY PLAN
Acceptance Criteria
Person (s) Contacted
Position Title (s)
Plan Section
Revision No.
Meets acceptance
(Refer to page 1 of this Appendix for
containing
and Date
criteria?
further detail on the acceptance criteria)
commitment
Mel Agen
EP Coordinator
Sections 5.3.1; 5.3.3;
Rev.17 4/96
Yes
Section 4.01 Item 1
6.4.1
Emergency Plan contains commitment for on-
shift dose assessment capability.
Mel Agen
EP Coordinator
Section 6.4.1
Rev.17
Yes
Section 4.01 Item 2
4/96
Emergency o! n centaine cc - tmer.4 fes
backup deze 2 cere ent capabW!y.
04.02 ON-SHIFT DOSE ASSESSMENT EMERGENCY PLAN IMPLEMENTING PROCEDURE
Person (s) contacted
Position Title (s)
Procedure / indication
Revision No.
Meets acceptance
and Date
criteria?
Mel Agen
EP Coordinator
F3-1, section 4.3.6
Rev.13
Yes
Section 4.02 Item 1
3/95
Procedure initiates dose assessment
Mel Agen
EP Coordinator
F3-13
Rev.14
Yes
Section 4.02 Item 2
12/95
Indications initiate dose assessment
Mel Agen
EP Coordinator
F3-13.0 through
Rev. 4; 7/92
Yes
Section 4.02 Item 3
F3-13.3
Rev. 5; 7/92
Procedure for performing dose assessment
Rev.1; 5/87
available.
Rev. 8; 9/95
04.03 ON-SHIFT DOSE ASSESSMENT TRAINING
Person (s) contacted
Position Title (s)
Personnel Trained
Meets acceptance
(Title /#)
criteria?
Mel Agen
EP Coordinator
Shift Rad Protection
n/a
Yes
Section 4.03 Item 1
Specialist; 8
On-shift Personnel trained for dose assessment
inspector: Thomas Ploski Recion 111. DRS. Plant Support Br.1
13