Notice of Violation from Insp on 880307-11.Violation Noted: Based on Results of Two call-out Drills,Licensee Emergency Response Team Did Not Meet Staffing Requirements for Emergency Response Team Personnel
ML20151V047
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/25/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20151V028 List:
References
50-482-88-12, NUDOCS 8805020257
Download: ML20151V047 (1)


Text

~

APPENDIX A

-NOTICE OF VIOLATION Wolf Creek Nuclear Operating Corporation Docket: 50-482 Wolf Creek Generating Station Operating License: HPF-42 During an NRC inspection conducted on March 7-11, 1988, a violation of HRC requirements was identified. 'The violation involved the failure to have the capability for contacting the onsite emergency response personnel 6 ring an emergency. In accordance with the "General Statement of Polic for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987)y and Procedure

, the violation is listed below:

Emergency Plan and Implementing Procedures Wolf Creek Nuclear Station Technical Specification 6.8, Procedures and Programs, states (6.8.1) that written procedures shall be established, implemented, and maintained covering emergency plan implementation.

Section 1.2.2.1.2 of the Plan states that there are two designated comunicators, the NRC Communicator and the Offsite Corrinunicator (0C) in the control room. Emergency Preparedness Procedure (EPP) 01-3.4 shall be implemented to ensure that sufficient personnel are available to staff onsite Emergency Response Facilities (Section 2.1). EPP 01-3.4 directs the OC to contact offsite nonresponding emergency cnmmunicators (NREC's).

A pyramid call-out system, supplemented with pagers, is used to contact emergency response personnel.

Contrary to the above, announced and unannounced call-out drills were conducted by licensee personnel on January 11 and February 1,1988, respectively, to determine the availability of emergency response team personnel in the event of an emergency. Based on.results from the two call-out drills, the licensee emergency response team did not meet staffing requirements for emergency response team personnel.

This is a repeat violation (482/8714-02).

This is a Severity Level IV violation. (SupplementVIII)(482/8812-01).

Pursuant to the provisions of 10 CFR 2.201, Wolf Creek Huclear Operating Corporation is hereby required to submit to this office, within 30 days of the date of the letter transmitting this Notice, a written statement or explanation (1) the reason for the violation if in reply, (including for each violation:2) the corrective steps which have been taken an admitto ,

achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas, this 25th day of April 1988.