MONTHYEARML20154C7031998-09-29029 September 1998 Notice of Violations from Insp on 980323-0410 & 0622-25. Violations Noted:Without Prior Commission Approval & Without Performing Written Safety Evaluations,Licensee Made Changes Described in USAR Re Unreviewed Safety Question ML20236T1431998-07-23023 July 1998 Notice of Violation from Insp on 980531-0711.Violation Noted:On 980604,technicians Placed Heavy Door & Frame in Control Room Equipment Cabinet Adjacent to Train a Protection Sys Logic Cabinets ML20249A0341998-06-12012 June 1998 Notice of Violation from Insp on 980419-0530.Violation Noted:On 980317,electricians Removed Breaker NG001AGF1 While Clearance Order 98-0250-EF Relied on Procedure Mge EOOP-11 to Establish Isolation of Breaker from Bus ML20248B6471998-05-27027 May 1998 Notice of Violation from NRC Investigation on 961224-980206. Violation Noted:On 961211,S Buehne Intentionally Submitted Info to Licensee Known to Be Inaccurate & Info Submitted to NRC ML20216A8881998-05-0606 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980410,an Accessible High Radiation Area on Radwaste Bldg Roof W/Dose Rate of Approx 400 Mr/H at 18 Inch Was Not Posted as High Radiation Area ML20217E0851998-04-23023 April 1998 Notice of Violation from Insp on 970624-27.Violation Noted: Licensee Identified That Unauthorized Work, (Work Outside Scope of Assigned Work Package Tasks & Applicable Procedures) Performed & Not Documented ML20217M5291998-04-0202 April 1998 Notice of Violation from Insp on 980316-20.Violation Noted: Inspector Identified Seven Radioactive Matl Containers Located in Radwaste Storage Bldg ML20217H6431998-04-0101 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:Operators Failed to Log Entry Into Action Statement for TS 3.1.3.5 Shutdown Rods Inserted Beyond Rod Insertion Limits ML20216G5661998-03-13013 March 1998 Notice of Violation from Insp on 980223-27.Violation Noted: Proper Surveys Were Not Performed to Prevent Unconditional Release of Radioactive Matls Greater than Release Criteria ML20199H9141998-01-29029 January 1998 Notice of Violation from Insp on 971214-980124.Violation Noted:Technicians Failed to Follow Procedure Steps by Removing Vendor Wire & Reversed Variable Transformer Leads ML20198A7511997-12-29029 December 1997 Notice of Violation from Insp on 971102-1213.Violations Noted:On 971113,inspectors Noted That Containment Coordinator Had Been Assigned Duty of Closing Containment Hatch While Retaining Balance of Coordinator Duties ML20199K2961997-11-25025 November 1997 Notice of Violation from Insp on 970922-1102.Violation Noted:Operators Used Markings on Drawing EID0003 as Operator Aid W/O Documented Approval of Shift Supervisor & Root Valves Indicated on Attachment C Were Operated ML20199F6961997-11-14014 November 1997 Notice of Violation from Insp on 971020-24.Violations Noted: Snubbers 17994 & 20231 Did Not Meet Unconditional Release Criteria & Were Taken Outside Normally Established Radiological Controlled Area W/O Using Form RPF 02-515-02 ML20217F1911997-10-0202 October 1997 Notice of Violation from Insp on 970810-0920.Violation Noted:On 970828,worker Entered Radiologically Controlled Area W/O Electronic Dosimetry Required by Radiation Work Permit 970009 ML20210N6821997-08-21021 August 1997 Notice of Violation from Insp on 970629-0809.Violation Noted:Worker Entered Radiologically Controlled Area W/O Neutron Dosimetry Required by Radiation Work Permit 970003 ML20140E8311997-06-0606 June 1997 Notice of Violation from Insp on 970406-0517.Violations Noted:Security Escorts Escorted More than Five Visitors Into Vital Areas W/O Specific Approval of Vice President of Plant Operations or Designee ML20140E7181997-04-25025 April 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:On 970227,radwaste Operators Did Not Follow Proper Procedures & Disregarded Panel Alarm When They Were Instructed by Supervisor to Exceed Precautionary Fill Limit ML20137N0911997-04-0303 April 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Corrective Actions in Response to QA Audit K381 Finding Failed to Identify & Correct Conflict Between TS Clarifications & TS ML20137M5861997-04-0303 April 1997 Notice of Violation from Insp on 961007-25.Violation Noted: Licensee Corrective Actions in Response to Quality Assurance Audit K381 Findings,Failed to Identify & Correct Conflicts Between TS Clarifications & TS ML20137M3411997-04-0202 April 1997 Notice of Violation from Insp on 970127-0214.Violation Noted:Underlying Design Error Was Not Promptly Corrected ML20136E2591997-03-10010 March 1997 Notice of Violation from Insp on 970111-0222.Violation Noted:On 960728,shift Supervisor Logged Failure of Ci Valve Ef HV0034 to Close on Demand,But Failed to Recognize That Failure Resulted in Entry Into TS Action Statement 3.6.3 ML20147B7681997-01-30030 January 1997 Notice of Violation from Insp on 961201-970111.Violation Noted:On 961206,shift Supervisor Documented Operability Determination for turbine-driven Auxiliary Feedwater Pump Identifying Governor Oil Result ML20133C1001996-12-31031 December 1996 Notice of Violation from Insp on 961007-11 & 21-25. Violations Noted:Incorrect TS Clarifications Re 10CFR50.59, Failure to Perform Required Insvc Insp & Testing & Operating Facility Differently than Described in Updated SAR ML20132F1931996-12-13013 December 1996 Notice of Violation from Insp on 961020-1130.Violation Noted:Sys Engineer Provided Operability Recommendation W/O First Properly Identifying Leaking Equipment & Evaluating Effect & Failed to Establish/Maintain Procedure Stn FP-204 ML20134G3001996-11-0707 November 1996 Notice of Violation from Insp on 960908-1019.Violation Noted:On 960323,w/plant in Mode 5,operators Discovered SI Pump Discharge Valves EM HV-8802A & 8821A Handswitches Tagged Do Not Operate Closed But Still Power Available ML20059C3091993-12-29029 December 1993 Notice of Violation from Insp on 931024-1204.Violations Noted:Failure to Maintain Cognizance of Control Panels & Permits & Failure to Properly Restore Clearance Orders ML20058E2771993-11-19019 November 1993 Notice of Violation from Insp on 930912-1023.Violation Noted:Licensee Determined Personnel Failed to Position & Verify That Actual Valve Positions for Boric Acid Filter Inlet & Outlet Reflected Required Reach Rod Position ML20057G1891993-10-15015 October 1993 Notice of Violation from Insp on 920830-1010.Violation Noted:During Period of May - Aug 1992,records Were Identified as Being Incomplete or Inaccurate ML20057G1181993-10-14014 October 1993 Notice of Violation from Insp on 930920-24.Violation Noted: During 930920-24,inspectors Determined That Weakness Had Not Been Corrected ML20057E2891993-10-0404 October 1993 Notice of Violation from Insp on 930809-27.Violation Noted:Seven Failures of Bellows in Residual Heat Valves EJ8856A & -B Since 1984 Not Resolved ML20058M7611993-10-0101 October 1993 Notice of Violation from Insp on 930801-0911.Violation Noted:Operators Started Safety Injection Pump W/O Starting Component Cooling Water Pump on 930813 ML20057C2241993-09-21021 September 1993 Notice of Violation from Insp on 930823-27.Violation Noted: Unescorted Access to Protected or Vital Areas for Contractor Personnel Who Terminated Employment at Facility for Period 930101-0801 Had Not Been Rescinded as Required ML20128D5571993-02-0101 February 1993 Notice of Violation from Insp on 921122-930102.Violation Noted:Failure to Properly Implement Procedure & Inadequate Spent Fuel Pool Bridge Crane Operating Procedure ML20126A4991992-12-11011 December 1992 Notice of Violation from Insp on 921011-1121.Violation Noted:Licensee Failed to Change Alr OO-O47E to Provide Alternate Method of Draining Tank ML20125C6621992-12-0707 December 1992 Notice of Violation & Proposed Imposition of Civil Penalty from Insp on 920921-1006.Violation Noted:While Implementing WR 51543-92,personnel Expanded Scope of Work Being Performed W/O Revising WR 51543-92 to Provide Further Directions ML20197H6461990-11-0909 November 1990 Notice of Violation from Insp on 900926-1005.Violation Noted:Corrective Action Program Did Not Assure That Nonconforming Condition Potentially Affecting turbine-driven Auxiliary Feed Pump Was Promptly Reported & Corrected ML20062D0021990-10-19019 October 1990 Notice of Violation from Insp on 900801-0914.Violation Noted:Test of Main Generator Voltage Regulator Performed W/O Procedure ML20059N3131990-10-0101 October 1990 Notice of Violation from Insp on 900701-31.Violation Noted: Individual Assumed Supervising Operator Watch W/O Having Performed Five 12-h Shifts in Preceeding Calendar Yr ML20058P2491990-08-13013 August 1990 Notice of Violation from Insp on 900507-11 & 0629-0703. Violation Noted:Inadequately Adjusted Detection Aids Sys ML20056A2881990-07-31031 July 1990 Notice of Violation from Insp on 900601-30.Violations Noted: Corrective Action Specified in LER 90-004 Not Appropriate to Reduce Probability of Similar Events Occuring in Future & Strip Charts Did Not Reflect Real Time ML20058K3681990-06-26026 June 1990 Notice of Violation from Insp on 900514-18.Violation Noted: Insufficient Radiological Emergency Response Training Which Could Result in Improper Emergency Classifications &/Or Protective Action Recommendations to Offsite Authorities ML20246P2011989-05-15015 May 1989 Notice of Violation from Insp on 890401-30.Violation Noted: Corrective Actions Not Effective in Precluding Repetition of Event ML20245J4031989-05-0101 May 1989 Notice of Violation from Insp on 890201-28.Violation Noted: Inoperable Fire Barrier,Failure to Lock Valve in Accordance W/Procedure & Failure to Update Drawing ML20245E9261989-04-21021 April 1989 Notice of Violation from Insp on 890313-17.Violation Noted: Seven Individuals Left Util W/O Receiving Exit Whole Body Count & No Record Included in Their Exposure History File Indicating Attempt Made to Contact Them to Return for Count ML20245A5601989-04-13013 April 1989 Notice of Violation from Insp on 890306-10.Violation Noted: Fire Hazards Analyses for Plant Mod Request 2206, Auxiliary Bldg Fire Protection Sys Did Not Include Consideration of Radiation Release Potential Under Stated Condition ML20247A7871989-03-15015 March 1989 Notice of Violation from Insp on 890213-17.Violation Noted: Licensee Installed Temporary Jumper Across Cell 10 of Station Battery NK12 & No Safety Evaluation Provided ML20195E0591988-10-31031 October 1988 Notice of Violation from Insp on 880919-23.Violation Noted: Numerous Analytical Results for Various Chemical Parameter Analyses Performed by Technicians on Lab Analytical Accuracy cross-check Program Stds from 870710 to 880720 Unacceptable ML20195D9301988-10-28028 October 1988 Notice of Violation from Insp on During Sept.Violations Noted:Failure to Cycle During Initial Quarterly Surveillance Test Attempt Because Yellow Train four-way Valve Did Not Operate ML20195B3131988-10-21021 October 1988 Notice of Violation from Insp on 880912-16.Violations Noted:Alarms on Several Eberline AMS-3 Continuous Airborne Radioactivity Monitors Incorrectly Set High & Failure to Leak Test Four Sr-90 Sources for Period Exceeding 18 Months ML20205C2911988-10-19019 October 1988 Notice of Violation from Insp on 880606-17.Violations Noted: Procedures & Instructions Provided to Maint Personnel for Component Cooling Water Pump Maint Activity Did Not Include Appropriate Cautions or Details for Removal of Bearing 1998-09-29
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000482/19990091999-10-0707 October 1999 Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted. Major Areas Inspected:Events,Emergency Preparedness Facilities & Equipment,Emergency Plan & Implementing Procedures & Emergency Response Organization Training IR 05000482/19990051999-09-21021 September 1999 Insp Rept 50-482/99-05 Has Been Rescheduled for Next Yr.Insp Rept Will Not Be Issued IR 05000482/19990131999-09-20020 September 1999 Insp Rept 50-482/99-13 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990121999-09-14014 September 1999 Insp Rept 50-482/99-12 on 990816-20.No Violations Noted. Major Areas Inspected:Solid Radioactive Waste Mgt Program, Radioactive Matls Transportation Program,Facilities & Equipment,Staff Kowledge & Performance & Staff Training IR 05000482/19990161999-08-26026 August 1999 Insp Rept 50-482/99-16 on 990809-13.No Violations Noted. Major Areas Inspected:Planning & Preparation,Program to Maintain Occupational Exposure Alara,Temporary Shielding Program & Hot Spot Reduction Program IR 05000482/19990081999-08-18018 August 1999 Insp Rept 50-482/99-08 on 990613-0724.Noncited Violation Identified.Major Areas Inspected:Operations,Maint & Plant Support IR 05000482/19993011999-08-17017 August 1999 Exam Rept 50-482/99-301 on 990726-29.Exam Results:All Nine Applicants Passed Written Exams & Exhibited No Broad Knowledge or Training Weaknesses IR 05000482/19990111999-08-13013 August 1999 Insp Rept 50-482/99-11 on 990712-16.No Violations Noted. Major Areas Inspected:Review of Radiological Environ Monitoring Program,Meterological Monitoring Prgram & Results of Licensee Investigation of 990525 Personnel Event IR 05000482/19990151999-08-10010 August 1999 Canceled Insp Rept 50-482/99-15.No Inspection Rept Will Be Issued for This Rept Number IR 05000482/19990071999-07-15015 July 1999 Insp Rept 50-482/99-07 on 990614-18.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Radiation Protection Program Activities IR 05000482/19990061999-07-0202 July 1999 Insp Rept 50-482/99-06 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-IV-99-029, on 990625,female Licensee Employee Was Discovered Contaminated in Facial Area.Licensee Convened Incident Investigation Team to Assess Event.Worker Received Total Effective Dose Equivalent of Approx 7 Mrem1999-06-28028 June 1999 PNO-IV-99-029:on 990625,female Licensee Employee Was Discovered Contaminated in Facial Area.Licensee Convened Incident Investigation Team to Assess Event.Worker Received Total Effective Dose Equivalent of Approx 7 Mrem IR 05000482/19990031999-05-21021 May 1999 Insp Rept 50-482/99-03 on 990321-0501.Four NCVs Noted.Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19990041999-05-0505 May 1999 Insp Rept 50-482/99-04 on 990405-09.No Violations Noted. Major Areas Inspected:Licensee Implementation of Facility Inservice Insp Program & Followup Review of Previously Identified Insp Findings IR 05000482/19990021999-04-0909 April 1999 Insp Rept 50-482/99-02 on 990207-0320.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000482/19990011999-01-26026 January 1999 Insp Rept 50-482/99-01 on 990111-14.No Violations Noted. Major Areas Inspected:Testing & Maintenance,Protected Area Barriers & Detection Aids,Vital Area Barriers & Detection Aids,Compensatory Measures & Security Sys Power Supply IR 05000482/19980201999-01-15015 January 1999 Insp Rept 50-482/98-20 on 981115-1226.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000482/19980161998-12-10010 December 1998 Informs That Insp Rept 50-482/98-16 Was Combined with Insp Rept 50-482/98-12,therefore,no Rept Will Be Issued for Rept 50-482/98-16 ML20196H3711998-12-0303 December 1998 Insp Rept 50-482/98-19 on 981002-1114.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Licensee Response to Road Closure Due to Flooding within 10-mile Emergency Zone Was Excellent PNO-IV-98-051, on 981102,flooding in Vicinity of Wolf Creek Generating Station Occurred.Licensee Has Been in Close Contact with Army Corps of Engineers,Region VII Ofc of Federal Emergency Mgt Agency Emergency Organizations1998-11-0505 November 1998 PNO-IV-98-051:on 981102,flooding in Vicinity of Wolf Creek Generating Station Occurred.Licensee Has Been in Close Contact with Army Corps of Engineers,Region VII Ofc of Federal Emergency Mgt Agency Emergency Organizations ML20155A1871998-10-22022 October 1998 Insp Rept 50-482/98-17 on 980823-1003.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Use of Fire Protection Sys Pumps for Purposes Other than Fire Protection Constituted Degradation of Sys IR 05000482/19980181998-10-0505 October 1998 Insp Rept 50-482/98-18 on 980921-25.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Assessment Aids,Communications & Security Program Plan & Procedures ML20154C7031998-09-29029 September 1998 Notice of Violations from Insp on 980323-0410 & 0622-25. Violations Noted:Without Prior Commission Approval & Without Performing Written Safety Evaluations,Licensee Made Changes Described in USAR Re Unreviewed Safety Question ML20154C7071998-09-29029 September 1998 Insp Rept 50-482/98-12 on 980323-0410 & 0622-25.Violations Noted.Major Areas Inspected:Engineering & Plant Support IR 05000482/19980151998-09-0404 September 1998 Insp Rept 50-482/98-15 on 980712-0822.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support ML20236T1461998-07-23023 July 1998 Insp Rept 50-482/98-14 on 980531-0711.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236T1431998-07-23023 July 1998 Notice of Violation from Insp on 980531-0711.Violation Noted:On 980604,technicians Placed Heavy Door & Frame in Control Room Equipment Cabinet Adjacent to Train a Protection Sys Logic Cabinets IR 05000482/19980131998-06-12012 June 1998 Insp Rept 50-482/98-13 on 980419-0530.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20249A0341998-06-12012 June 1998 Notice of Violation from Insp on 980419-0530.Violation Noted:On 980317,electricians Removed Breaker NG001AGF1 While Clearance Order 98-0250-EF Relied on Procedure Mge EOOP-11 to Establish Isolation of Breaker from Bus ML20248B6471998-05-27027 May 1998 Notice of Violation from NRC Investigation on 961224-980206. Violation Noted:On 961211,S Buehne Intentionally Submitted Info to Licensee Known to Be Inaccurate & Info Submitted to NRC ML20247Q3461998-05-22022 May 1998 SALP Rept 50-482/98-99 for Period 970406-980418 ML20216A8881998-05-0606 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980410,an Accessible High Radiation Area on Radwaste Bldg Roof W/Dose Rate of Approx 400 Mr/H at 18 Inch Was Not Posted as High Radiation Area ML20216A9051998-05-0606 May 1998 Insp Rept 50-482/98-10 on 980308-0418.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217M3691998-04-30030 April 1998 Insp Rept 50-482/98-07 on 980330-0403.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20217E0851998-04-23023 April 1998 Notice of Violation from Insp on 970624-27.Violation Noted: Licensee Identified That Unauthorized Work, (Work Outside Scope of Assigned Work Package Tasks & Applicable Procedures) Performed & Not Documented ML20217M5291998-04-0202 April 1998 Notice of Violation from Insp on 980316-20.Violation Noted: Inspector Identified Seven Radioactive Matl Containers Located in Radwaste Storage Bldg ML20217M5491998-04-0202 April 1998 Insp Rept 50-482/98-11 on 980316-20.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radioactive Waste/Matls Transportation Programs IR 05000482/19980041998-04-0101 April 1998 Insp Rept 50-482/98-04 on 980125-0307.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20217H6431998-04-0101 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:Operators Failed to Log Entry Into Action Statement for TS 3.1.3.5 Shutdown Rods Inserted Beyond Rod Insertion Limits IR 05000482/19980081998-03-30030 March 1998 Insp Rept 50-482/98-08 on 980302-06.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20216G5661998-03-13013 March 1998 Notice of Violation from Insp on 980223-27.Violation Noted: Proper Surveys Were Not Performed to Prevent Unconditional Release of Radioactive Matls Greater than Release Criteria ML20216G5761998-03-13013 March 1998 Insp Rept 50-482/98-09 on 980223-27.Violation Noted.Major Areas Inspected:Radiation Protection Program IR 05000482/19980021998-03-0606 March 1998 Insp Rept 50-482/98-02 on 980202-06.No Violations Noted. Major Areas Inspected:Maint,Engineering & Emergency Preparedness IR 05000482/19980061998-02-27027 February 1998 Insp Rept 50-482/98-06 on 980202-06.No Violations Noted. Major Areas Inspected:Review of Radiation Protection Program Activities ML20203K9181998-02-26026 February 1998 Insp Rept 50-482/98-03 on 980202-06.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Mgt Program,Training & Qualifications,Qa Oversight, Facilities & Equipment & Annual Repts ML20203K2831998-02-26026 February 1998 Insp Rept 50-482/98-301 on 980217.No Violations Noted.Major Areas Inspected:Operations,Including Evaluation of Competency of 2 Retake RO & 2 SRO Retake License Applicants for Issuance of Operating Licenses at Facility ML20203H5341998-02-23023 February 1998 Insp Rept 50-482/97-201 on 971103-980109.No Violations Noted.Major Areas Inspected:Capability of RHR & CCW Sys to Perform Safety Functions Required by Design Bases & Adherence of Sys to Design & Licensing Bases IR 05000482/19970211998-02-0909 February 1998 Insp Rept 50-482/97-21 Cancelled ML20199H9141998-01-29029 January 1998 Notice of Violation from Insp on 971214-980124.Violation Noted:Technicians Failed to Follow Procedure Steps by Removing Vendor Wire & Reversed Variable Transformer Leads IR 05000482/19970231998-01-29029 January 1998 Insp Rept 50-482/97-23 on 971214-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-09-21
[Table view] |
Text
_ __ . - _ _ _ .__ __ _ _ _ _ .. _ .
NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY Wolf Creek Huclear Operating Docket No. 50-48?.
Corporation License No. NPF-42 Wolf Creek Generating Station EA 92-191 During an NRC inspection conducted September 21 through October 6, 1992, violations of NRC requireinents were identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement Policy), 10 CFR 2, Appendix C, the Nuclear Regulatory Commission proposes to impose a civil penalty pursuant to Section 234 of the Atomic Energy Act of 1954, as amended ( Act) , 42 U.S.C. 2282, and 10 CFR 2.205. The particular violations and associated civil penalty are not forth i below:
I. Violation Assessed a Civil Penalty Technical Specification (TS) 6.8.1.a states that written ,
procedures shall be established, implemented, and maintained ,
covering the applicable procedures recommended in Appendix A '
of Regulatory Guide 1.33, Revision 2, February 1978.
Regulatory Culde 1.33, Revision 2 (February 1978),
Appendix A, Item 9.a states that maintenance that can affect the performance of safaty-related cauipment shou?sd be properly preplanned and performed in accordance with written l
' procedures, documented instructions or drawings appropriate ;
to the circumstances. ,
Step 3.C of Attachment 8 to Procedure ADM 01-057, states that post-maintenance tests chall be performed according to instructions provided in the planning and authorization process and that if the scope of the work changes or expands from the original plans, the work request shall be revised '
providing further directions. Step 4 of Attachment 8 to ADM 01-057 states that since corrective maintenance is performed to correct a deficient condition, most corrective maintenance should have post-maintenance testing associated !
with it to verify the equipment functions properly. ;
I l
contrary to the above, on July 22, 1992, while implementing
- l WR 51543-92, licensee personnel expanded the scope of the work being performed under WR 51543-92 and did not revise :
WR 51543-92 in order to provide further directions for the '
post-maintenance test of valve EF VO58. The mechanic who t was implementing WR 51543-92 did not revise the work request to indicate a change of work scope to perform corrective work (i.e., a valve position indication adjustment) on valve EF VO58. In addition, although corrective work was done, f
the work request was not revised to require post-maintenance testing to verify that valve EF VO58 had been returned to !
i 9212140027 PDR 921207 -
G ADOCK 05000402 :
PDR ;
, - ~ . _ , .
Wolf Creek Nucletar -7 - Obb 7 002 operating Corporation Kansas Departnant of Health and Environment Bureau of Air Quality & Radib'. ion control ATTN: Gerald Allen, Public Health Physicist Division of Environment Forbes Field Building 321 Topeka, Kansas 66620 Kansas Department of Health and Environnent ATTlia Robert Eye, General Counsel LSOB, 9th Floor 900 SW Jackson Topeka, Kansas 66612
N e
Notice of Violation -2 -
DEC 7 892 its required locked and throttled position. On August 27, 1992, the licensae determined that valve EF-V058 had not been returned to its required position, thereby causing a degraded ESW flow condition.
This is a Severity Level III violation (supplement I).
Civil Penalty - $50,000 II. Violations Not Assessed a Civil Penalty A. 10 CFR 50, Appendix B, Criterion V requires that activities affecting quality shall be accomplished in accordance with instructions, procedures, or drawings of a typo appropriate to the circumstances. Three examples of failing to meet this requirement are listed below:
- 1. Procedure ADM 07-100, Revision 30, " Preparation, Review, Approval, and Distribution of WCGS Procedures," provides guidance for modifying procedures.
Step 5.3 of ADM 0/~100 states that, "It is the responsibility of all Station Personnel to er.sure that procedures are propnrly written and modified."
contrary to the above, on October 3, 1992, the inspector cetermined that the licensee failed to ensure that Procedure Change Form MI 92-644, initiated on August 31, 1992, was promptly incorporated into Procedure CKL EF-120, Revision 17, " Essential Service Water Valve, Breaker, and Switch Lineup." Consequently, Procedure CKL EF-120, did not reflect the proper locked throttled position (i.e., 47 degrees open) for valve EF V058.
This is a Severity Level IV violation (Supplement I)
- 2. Temporary Procedure TP-TS-115, Revision 0, "A Train ESW Flow Verification to CCW Heat Exchanger," provides instructions to measure the essential service water flow through Component Cooling Water Heat Exchanger A.
Step 2.3.1 of Temporary Procedure TP-TS-1.15-provided an expected flow value and acceptable range of flow, and required that if the flow variance was greater than i 200 gallona per
.- - - _ = _ _ _ _ _ _ . _ _ _ _ _ _ .
7 3LC ~ d'
3 -
minute, a work request should be sent to the system engineer for avaluation.
Contrary to the above, the inspector determined that Stop 2.3.1 provided instructions that were inappropriate to the circumstances. Although the procedure provided acceptance criteria in Step 2.3.1, there was no guidance that indicated that the system would be inoperable if the measured flow was greater than the acceptance criteria. On August 28, 1992, the test results did exceed the acceptance criteria, but the test engineer informed the shift superviscr that the test has been completed satisfactorily. As a result, the licensoo prematurely exited Technical Specifi-cation Limiting Condition for Operation (LCO) 3.7.3 (Compor,ent Cooling Water System) .
This is a Severity Level IV violation (Supplernent I).
- 3. Proceb r e ADM 02-024, Revision 0, " Technical i
Specc , cation Operability," provides guidance for determining operability or systems needed to comply with TS.
Step 5.9.1 of Procedure ADH 02-024 states that, "Once a degraded or nonconforming condition is identified for a safety system or component, an operability determination shall be made as soon as l possible. The timeliness of the operability determination should be commensurate with the safety significance of the issue. The allowed outage time contained in Technical Specification LCOs provide reasonable guidelines for determining safety significance."
contrary to the above, the licensee did not perform an operability determination for the component cooling water system within the Technical Specification allowed outage timo cf 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after a potentially non-conforming condition was identified on August 17, 1992.
This is a Severity Level IV violation (Supplement I).
B. 10 CFR 50, Appendix B, Criterion X"I specifies, in part, that measures shall be established to assure that conditions adverse to quality, such as deficiencies and nonconformances are promptly identified and corrected.
Procedure KGP-1311, Revision 0, " Industry Technical
- . _ - -- _ _- =- -- -.
i l
{, JEC W Notice of Violatjon I Information Program," (dated July 2,1986) is intended 3
to ensure, in part, that industry experience is j translated into corrective actions, if required, to improve plant safety and reliability.
Step 6.4.4 of Procedure KGP-1311 specifies that the evaluation of industry technical information shall identify any corrective actions that are required to be implemented.
! Contrary to the above, in September 1992, the licensee
- determined that they failed to properly translate d
vendor information into appropriate administrative l controls. While evaluating the facts surrounding the j failure of the worm sector gear of valve EP V058, the
- licensee determined that operator Aide 86-004 failed to
! prevent the adverse condition (i.e., broken worm sector l gear) because the information provided was ambiguous.
i This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Wolf Creek Nuclear 4
operating Corporation (Licensee) is hereby required to submit a j written statement or explanation to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, within 30 days of the date of this Notice of Violation and Proposed Imposition of Civil Penalty (Notico). This reply should be clearly marked
, as a " Reply to a Notice of Violation" and should include for l each alleged violation: (1) admission or denial of the alleged violation, (2) the reasons for the violation if admitted, and if denied, the reasons why, (3) the corrective steps that have been taken and the results achieved, (4) the_ corrective steps that j
will be taken to avoid further violations, and (5) the date when full compliance will be achieved.
! If an adequate reply is not received within the time specified in 1 this Notice, an order or demand for information may be icaued as
- to why the license should not be modified, suspended, or revoked ,
- or why such other action as may be proper should not be takon.
Consideration may be given ,to extending the response time for
. good cause shown. Under the authority of Section 182 of the Act,
. 42 U.S.C. 2232, this response shall be submitted under oath or affirmation.
Within the same time as provided for the response required above -
under 10 CFR 2.201, the Licensee may pay the civil penalty by letter addressed to the Director, office of Enforcement, U.S.
Nuclear Regulatory Commission, with a check, draft, money order, or electronic transfer payable to the Treasurer of the United States in the amount of the civil penalty proposed above, or may 4
s
, v- g- -v - . , - . wg..---,,,,--w--- - v, , .u.. _ _ , , , - - - , - , . , . , , , , - ,, ,,-e,rm r,s.
e Notice of Violation -
5- DEC 7 1992 protest imposition of the civil penalty, in whole or in part, by '
a written answer addressed to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission. Should the '
Licensee fail to answer within the time specified, an order imposing the civil penalty will be issued. Should the Licensee elect to file an answer in accordance with 10 CFR 3.205 protesting the civil penalty, in whole or in part, such answer should be clearly marked as an " Answer to a Notice of Violation" and may (1) deny the violations listed in this Notice, in whole or in part, (2) demonstrate extenuating circumstances, (3) show error in this Notice, or (4) show other reasons why the penalty should not be imposed. In addition to protesting the civil penalty, in whole or in part, such answer may request remission or mitigation of the penalty.
In requesting mitigation of the proposed penalty, the factors addressed in Section VI.B.2 of 10 CFR Part 2, Appendix C should be addressed. Any written answer in accordance with 10 CFR 2.205 '
should be set forth separately-frem the statement or explanation in reply pursuant to 10 CFR 2.201, but may incorporate parts of the 10 CFR 2.201 reply by specific reference (e.g., citing page and paragraph numbers) to avoid repetition. The attention of the Licensee is directed to the other provisions of 10 CFR.2.205, regarding the procedure for imposing a civil penalty.
Upon failure to pay any civil penalty due which subsequently has '
been determined in accordance with the applicable provisions of 10 CPR 2.205, this matter may be r6ferred to the Attorney General, and the penalty, unless compromised, remitted, or l mitigated, may be collected by civil action pursuant to ,
Section 234(c) of the Act,.42 U.S.C.-2282c.
- The response noted above (Reply to Notice of Violation, letter with payment of civil penalty, and Answer to a-Notice of '
Viola'. ion) should be addressed to: Director, Office of I
Enforcement, U.S. Nuclear Regulatory Commission, ATTN: Document Control' Desk, Washington, D.C. 20555 with a copy-to the Regional Administrator, U.S. Nuclear Regulatory Commission, Region IV, 611 Ryan plaza Drive, Suito 400, Arlington, Texas 76011, and a copy to the NRC Resident Inspector at the Wolf Creek Generating Station.
Dated at Arlington, Texas this 7th day of December 1992 1