ML20059N313
| ML20059N313 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/01/1990 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20059N310 | List: |
| References | |
| 50-482-90-28, NUDOCS 9010110230 | |
| Download: ML20059N313 (1) | |
Text
-
i i
APPENDIX A NOTICE OF VIOLATION Wolf Creek Nuclear Operating Corporation
-Docket: 50-482 d
. Wolf Creek. Generating Station License: NPF-42
<i During an NRC inspection conducted July 1-31, 1990,- one violation of NRC, requirements was identified. The violation, involved a licensed watchstander who had not maintained an' active license.
In'accordance with the " General
. Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, G
Appendix C (1990)(Enforcement Policy), the violation is listed below:-
. Watchstander With Inactive License d
Technical Specification Table l6.2-1 requires that shift crew composition.
l
. include an individual with a senior' operator: license in addition to the-shift supervisor.. This individual is designated by the~ licensee as the supervising operator. Tomaintainanactivelicense,10CFR55.53(e) requires that a senior operator actively' perform.the-functions of a senior operator a minimum of five 12-hour. shifts 'per calendar quarter.
5 Contrary to the above,.on-July 7,1990, an individual assumed the supervising operator watch without having performed five 12-hour shifts the preceding calendar quarter.
This is a Severity Level IV violation.
(SupplementI)(482/9028-01)
Pursuant to the provisions of 10 CFR 2.201, Wolf = Creek Nuclear Operating.
Corporation is hereby required to -submit,to this office,.within 30 days of the-date of the letter transmitting this Notice,a written statement or explanation in reply, including for each violation:
(1) the reason for the-violation if admitted, (2) the corrective' steps which-have been taken and the
~
results achieved, (3) the corrective steps which will be.taken:to avoid i
l l
further violations, and (4) the date when full: compliance will be achieved.
Where good cause is shown, consideration will be given to extending-the response time.
y 1:
Dated at-Arlington, Tex kas this /g day offic 1990 L
9010110230 90jooj
{DR ADOCK 05000482 PNU t
1
.~