ML20151V326

From kanterella
Revision as of 16:50, 24 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 70-1113/88-03 on 880314-18.No Violations or Deviations Noted
ML20151V326
Person / Time
Site: 07001113
Issue date: 04/20/1988
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Lees E
GENERAL ELECTRIC CO.
Shared Package
ML19302D527 List:
References
NUDOCS 8805030020
Download: ML20151V326 (2)


Text

j',

a

'f '

,. j' y 3 .;.

V,.. .

.. 1 WAf TRIAL TRAN$ETito HtP!%1TH

]

Docket No. 70-1113 I

-License No. SNM-1097 t i

General Electric Company  ;

. ATTN: 'Mr. Eugene A.' Lees, General Manager .

Nuclear Fuel and Components i Manufacturing  !

P. 0. Box 780 Wilmington, NC 28402  ;

Gentlemen: I

SUBJECT:

NRC INSPECTION REPORT NO. 70-1113/88-03 -i t

This refers to the Nuclear Regulatory Comission (NRC) team inspection I conducted by D. W. Jones and others on March 14-18, 1988. The inspection =!

focused on.the implementation of the Agreement Between the United States and  :

the International Atomic Agency for the Application of Safeguards in the United l States (US/IAEA Agreement) at your facility. The inspection included a review i of activities authorized for your Wilmington facility. At the conclusion of  !

the inspection. the findings were discussed with those members of your staff i identified in the enclosed inspection report. l Areas examined -during~ the inspection are identified in the report. Within  :

these areas, the inspection consisted of selective examinations of procedures {

and representative records, interviews with personnel, and observation of i activities in progress. l Within the scope of the inspection, no violations or deviations were [

identified.  ;

The enclosed Inspection Report documents oral comitments (see paragraphs 5a and 10a) made by a licensee representative and discussed in the exit interview. l l If your understanding of this commitment differs from the report statements,  :

please inform this office promptly. l; In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and (

l security measures are exempt from public disclosure. Therefore, the enclosure i

! to this letter with the exception of the report cover pagt, which presents a p l nonexempt sumary, will not be placed in the NRC Public Document Room, j Should you have any questions concerning this letter, please contact us. I Sincerely, l i J. Philip Stohr, Director 8805030020 880420 'I Division of Radiation Safety

[DR ADOCK0700g3 and Safeguards l

Enclosure:

(See page 2 6 u te m ritow m  !

con 7m nonoswa .

sqt

7,'; ..

neateau femenaffte omra

,, 8.790198Fo#MATON General Electric Company- 2 APR 2 01988 -

Enclosure:

NRC Inspection Report ,

(ExemptfromDisclosure) 3m cc w/ enc 1:' '

T. Preston Winslow, Manager Licensing and Nuclear Materials Management

~ bec.w/o encl: I

-License Fee Management Branch  ;

-bec w/ encl:-

Document Control Desk (RIDS IE03), 016 l Licensing Branch, Division of Safeguards  !

-and Transportation, 825-SS  ;

bec w/ inspection Sumary:

State of North Carolina h

F R RII W

RII h.t *'h\'$ RII 04Y Adk i JBates: j EClay FA Emeigh DJoKes  ;

I 04/81 /88 04/tct/88 04//t /88 04/l4/88 i i

9'ft,

'I fg 0>NG f

DSeynour God EMcAlpine kCline -

04/lj/88 04/13/88 04/81 /88 04// /88 /y[tXN l TN TRWiffED Htptmrs c h T4ees3 730skr m ay a .

{  !