ML20226A000

From kanterella
Revision as of 08:58, 24 August 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Tennessee Valley Authority - Submittal of Emergency Plan Implementing Procedure Revisions for Sequoyah Nuclear Plant, Units 1 & 2
ML20226A000
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/11/2020
From: Rasmussen M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML20231A725 List:
References
Download: ML20226A000 (2)


Text

Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 August 11, 2020 10 CFR 50.54(q) 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327, 50-328, and 72-034

Subject:

Emergency Plan Implementing Procedure Revisions

Reference:

TVA letter submitted to NRC dated June 22, 2020, Emergency Plan Implementing Procedure Revisions.

As discussed in the referenced letter, it was identified that previous revisions of Sequoyah Nuclear Plant (SQN) Emergency Plan Implementing Procedures (EPIPs) have not been submitted to the NRC. Therefore, in accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f), the Tennessee Valley Authority is submitting a description of changes to the SQN Radiological Emergency Plan. The EPIPs and revisions that were not submitted are listed in the table, below.

EPIP Revision(s) Title Effective Date(s) 1 54 Emergency Plan Classification Matrix 4/29/19 2 36, 37 Notification of Unusual Event 7/3/18, 2/1/19 3 38, 39 Alert 7/3/18, 2/1/19 4 39, 40, 41 Site Area Emergency 8/7/17, 7/3/18, 2/1/19 5 48, 49, 50 General Emergency 8/7/17, 7/3/18, 2/1/19 Activation and Operation of the 6 51, 52, 53 8/27/18, 2/1/19, 1/22/20 Technical Support Center Activation and Operation of the 2/2/15, 6/21/18, 2/1/19, 7 31, 32, 33, 34 Operations Support Center 6/26/19 Personnel Accountability and 8 21 4/29/19 Evacuation 10 30 Medical Emergency Response 7/24/18 11 9 Security and Access Control 2/2/15 12 11, 12, 13 Emergency Equipment and Supplies 8/10/17, 7/24/18, 5/20/19 8/10/17, 12/12/17, 2/1/19, 13 18, 19, 20, 21 Dose Assessment 1/15/20 6/16/14, 11/2/18, 2/1/19, 14 23, 24, 25, 26 Radiation Protection Response 1/22/20 15 11 Emergency Exposure Guidelines 9/25/18

U.S. Nuclear Regulatory Commission Page 2 August 11, 2020 The above referenced revisions were evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f) and determined that the changes did not reduce the effectiveness of the Emergency Plan. Details of the revisions are included in the enclosure.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Mr. Paul Gain, Site Emergency Preparedness Manager, at (423) 843-7088.

Respectfully, MA Matthew Rasmussen Site Vice President Sequoyah Nuclear Plant

Enclosure:

SQN Units 1 & 2 Description of Revision/Change cc: NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Director - Division of Fuel Management, NMSS