MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions ML23192A2152023-06-27027 June 2023 Proposed Emergency Plan Revision - Location of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary Report and Elimination of CO2 Fire Suppression System CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . RA-23-0091, Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 42023-04-13013 April 2023 Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 4 L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan ML23013A1952023-01-13013 January 2023 Proposed Emergency Plan Revision, Relocation of the Technical Support Center L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 RA-22-0342, Revision to Emergency Plan On-Shift Staffing Analysis2022-12-0808 December 2022 Revision to Emergency Plan On-Shift Staffing Analysis ML22312A5502022-11-0707 November 2022 Proposed License Amendment Request to Revise Emergency Plan Staff Augmentation Times RA-22-0313, Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations2022-10-27027 October 2022 Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations RA-22-0218, Emergency Action Level (EAL) Technical Basis Document, Revision 32022-07-14014 July 2022 Emergency Action Level (EAL) Technical Basis Document, Revision 3 ND-22-0328, Enclosuvogtle Electric Generating Plant, Units 3 & 4 - Fukushima Response NEI 12-01 On-Shift Staffing Analysis Phase 2 Report, Revision 3.0, Standard Emergency Plan Annex, Revision 6.02022-06-29029 June 2022 Enclosuvogtle Electric Generating Plant, Units 3 & 4 - Fukushima Response NEI 12-01 On-Shift Staffing Analysis Phase 2 Report, Revision 3.0, Standard Emergency Plan Annex, Revision 6.0 L-2022-096, Radiological Emergency Plan - Revision 73 Report of Changes to Emergency Plan2022-06-20020 June 2022 Radiological Emergency Plan - Revision 73 Report of Changes to Emergency Plan RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes2022-05-24024 May 2022 Duke Energy Common Emergency Plan, Revision 2, Summary of Changes CNL-22-016, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-02-11011 February 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions RA-22-0070, Emergency Plan Annex, Revision 1, Emergency Action Level (EAL) Technical Basis Document, Revision 3, and EAL Wallchart, Revision 22022-02-10010 February 2022 Emergency Plan Annex, Revision 1, Emergency Action Level (EAL) Technical Basis Document, Revision 3, and EAL Wallchart, Revision 2 CNL-21-067, Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-01-27027 January 2022 Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change ML22018A0282022-01-18018 January 2022 Region 2 RFI - 2022 Exercise Inspections - Rev1 CNL-22-006, Tennessee Valley Authority - Radiological Emergency Plan Appendix Revision2022-01-12012 January 2022 Tennessee Valley Authority - Radiological Emergency Plan Appendix Revision NL-21-1097, Report of Changes to Standard Emergency Plan and Summary of 50.54(q) Analysis2022-01-0707 January 2022 Report of Changes to Standard Emergency Plan and Summary of 50.54(q) Analysis RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility L-2021-148, Radiological Emergency Plan - Revision 71 Report of Changes to Emergency Plan2021-12-0303 December 2021 Radiological Emergency Plan - Revision 71 Report of Changes to Emergency Plan RA-21-0276, Duke Energy Common Emergency Plan and Brunswick Steam Electric Plant and Catawba Nuclear Station Emergency Plan Annexes, Revision 1 Summary of Changes2021-11-0202 November 2021 Duke Energy Common Emergency Plan and Brunswick Steam Electric Plant and Catawba Nuclear Station Emergency Plan Annexes, Revision 1 Summary of Changes NL-21-0921, Report of Changes to Standard Emergency Plan and Summary of 50.54(q) Analysis2021-10-15015 October 2021 Report of Changes to Standard Emergency Plan and Summary of 50.54(q) Analysis RA-21-0136, Supplemental Information Regarding License Amendment Request for Common Emergency Plan2021-05-0404 May 2021 Supplemental Information Regarding License Amendment Request for Common Emergency Plan RA-21-0137, Duke Energy Carolinas, LLC - Emergency Plan Revision 2021-0012021-04-28028 April 2021 Duke Energy Carolinas, LLC - Emergency Plan Revision 2021-001 NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions RA-21-0113, 6 to Radiological Emergency Response Plan2021-03-27027 March 2021 6 to Radiological Emergency Response Plan RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan NL-20-1369, & Vogtle Electric Generating Plant Units 1 and 2 - Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2021-01-12012 January 2021 & Vogtle Electric Generating Plant Units 1 and 2 - Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis RA-20-0390, Revision to Radiological Emergency Response Plan2020-12-17017 December 2020 Revision to Radiological Emergency Response Plan RA-20-0387, EAL Technical Bases Document Revision 0022020-12-16016 December 2020 EAL Technical Bases Document Revision 002 ML20339A5792020-12-0404 December 2020 Report of Changes to SNC Standard Emergency Plan Annex and Summary of 50.54(9) Analysis RA-20-0291, Revision to Radiological Emergency Response Plan2020-09-28028 September 2020 Revision to Radiological Emergency Response Plan RA-20-0307, Summary of Changes to Emergency Plan, Effective 8/24/20202020-09-23023 September 2020 Summary of Changes to Emergency Plan, Effective 8/24/2020 ML20232D0372020-08-17017 August 2020 Emergency Plan Implementing Procedure Revisions ML20226A0002020-08-11011 August 2020 Tennessee Valley Authority - Submittal of Emergency Plan Implementing Procedure Revisions for Sequoyah Nuclear Plant, Units 1 & 2 ML20192A1402020-06-30030 June 2020 Southern Nuclear Operating Co., Inc. - License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions RA-20-0181, Submittal of Revision to Radiological Emergency Response Plan Implementing Procedure2020-06-12012 June 2020 Submittal of Revision to Radiological Emergency Response Plan Implementing Procedure L-2020-093, Radiological Emergency Plan, Revision 69 Report of Changes to Emergency Plan2020-05-26026 May 2020 Radiological Emergency Plan, Revision 69 Report of Changes to Emergency Plan RA-20-0122, Emergency Plan Revision 20-032020-04-16016 April 2020 Emergency Plan Revision 20-03 CNL-20-025, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2020-03-0404 March 2020 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision 2024-01-08
[Table view] |
Text
EMERGENCY PREPAREDNESS EXERCISE INSPECTION REQUEST FOR INFORMATION The U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Emergency Preparedness exercise inspection at your facility during the period listed in Attachment 1. The inspection will evaluate activities in the Emergency Preparedness cornerstone using NRC Inspection Procedures (IPs) 71114.01, Exercise Evaluation; 71114.04, Emergency Action Level and Emergency Plan Changes; and the Emergency Preparedness sections of 71151, Performance Indicator Verification. Prior to the onsite inspection period, inspectors will review the proposed exercise scenario using IP 71114.08, Exercise Evaluation - Scenario Review.
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection (Attachment 2). It is important that these documents are up-to-date, and complete, to minimize the number of additional documents requested during the preparation, and/or the onsite portions of the inspection.
If there is a need to revise your scheduled dates, or questions about this inspection or the material requested, please contact the lead inspector, Steven Sanchez at 404-997-4418 (Steven.Sanchez@nrc.gov), or the Operations Branch 2 Branch Chief, Eugene Guthrie at 404-997-4662 (Eugene.Guthrie@nrc.gov).
This letter and its enclosure will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, and Requests for Withholding.
PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
2022 Region II Emergency Preparedness Exercise Inspection Schedule Exercise Inspections Site Dates of Inspection License Number(s) Docket Number(s)
Dominion North Anna July 18 - 22 NPF-4, NPF-7 50-338, 50-339 Duke Brunswick July 25 - 29 DPR-62, DPR-71 50-324, 50-325 Catawba August 15 - 19 NPF-35, NPF-52 50-413, 50-414 Oconee March 28 - April 1 DPR-38, DPR-47, DPR-55 50-269, 50-270, 50-287 FPL St. Lucie February 7 - 11 DPR-67, NPF-16 50-335, 50-389 Southern Farley March 7 - 11 NPF-2, NPF-8 50-348, 50-364 Vogtle May 16 - 20 NPF-68, NPF-81 50-424, 50-425 TVA Sequoyah September 12 - 16 DPR-77, DPR-79 50-327, 50-328 EMERGENCY PREPAREDNESS EXERCISE INSPECTION DOCUMENTS Inspection Procedures (IPs): IP 71114.01 Exercise Evaluation IP 71114.04 Emergency Action Level and Emergency Plan Changes IP 71114.08 Scenario Evaluation IP 71151 Performance Indicator Verification Note: Provide Corrective Action Program (CAP) entries relating to each section below (exercises, PIs, EAL & E-Plan changes, etc.) since the last exercise inspection (including those written by Corporate). To help support the pre-exercise scenario review, provide the items under IP 71114.08 as early as practical, but no later than 45 days prior to the exercise. However, this should not preclude submitting the scenario per 10 CFR 50.4.
Electronic media is preferred, if readily available (the preferred file format is Word or searchable
.pdf files on CERTREC). [Note that the inspectors cannot accept data provided on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below (e.g., a folder labeled 71151 PIs, or Miscellaneous, etc.). It is not the intent that large or burdensome data be scanned for this purpose (e.g., Performance Indicator documents). This data will be inspected using original documentation. The current version of these documents is expected unless specified otherwise. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.
71114.01 Exercise Evaluation Core damage assessment procedure Dose assessment procedure Special/emergency exposure procedure Potassium Iodide distribution procedure Assembly/accountability procedure 71114.04 Emergency Action Level and Emergency Plan Changes Governing document for 10 CFR 50.54(q) evaluation process 10 CFR 50.54(q) evaluator training program and qualification records Signed and dated 10 CFR 50.54(q) screening/evaluation packages for:
- All E-Plan changes since the last NRC EP exercise inspection
- Changes to the Risk Significant EP implementing procedures (including corporate/fleet procedures) since the last NRC EP exercise inspection Current and immediately previous revisions of EAL, E-Plan, and EP procedures CAP entries specific to EAL, E-Plan, and EP procedure changes since the last NRC EP exercise inspection (including those written by Corporate) 71114.08 Exercise Evaluation - Scenario Review Current exercise package: scenario timeline, expected Drill and Exercise Performance (DEP) opportunities, exercise objectives, radiological assumptions, and scope of play and participation Completed IP 71114.08 Scenario Review Checklist, if performed Last graded and off-year exercise packages: scenario timelines, drill reports or assessments, and Final Federal Emergency Management Agency (FEMA) / Department of Homeland Security (DHS) exercise report All drill reports since the last EP Exercise Inspection Current and immediately previous revisions of the Emergency Plan (E-Plan)
Record of exercises conducted during each 8-year-cycle that documents the scenario elements demonstrated Drill, exercise, and Emergency Facility Activation procedures 71151 Performance Indicator Verification Governing document for the performance indicator (PI) process Drill and Exercise Performance (DEP), ERO, and ANS PI data submitted since the last NRC EP exercise inspection as documented in the associated inspection report (hard copies can be provided upon arrival)
DEP documentation and evaluations since the last NRC EP exercise inspection CAP entries related to the three EP PIs, since the last NRC EP exercise inspection (including those written by Corporate)
Miscellaneous Procedures and Records CAP procedure Safety Evaluation Report approved E-Plan and EALs Corporate and Departmental processes or procedures for EP staff Lead Inspector Contact Information: Mailing Address:
Steven Sanchez US NRC Region II Sr. Emergency Preparedness Inspector Attn: Steve Sanchez Operations Branch 2 245 Peachtree Center Avenue, Suite 1200 Division of Reactor Safety Atlanta, GA 30303 404-997-4418 Steven.Sanchez@nrc.gov