Forwards Insp Rept 50-333/96-07 on 960929-1116 & Notice of Violation
ML20132C826
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/13/1996
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20132C830 List:
References
NUDOCS 9612190026
Download: ML20132C826 (3)


See also: IR 05000333/1996007

Text

. ~. - - - . - . - - . _ - . ~ . . - - - - - . - - . - - - - .

_

,

%

..i

i

j December 13, 1996

i

l Mr. Michael J. Colomb

Plant Manager

? New York Power Authority

James A. FitzPatrick Nuclear Power Plant-

!

Post Office Box 41 '

Lycoming, NY 13093

i SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-333/96-07 AND NOTICE

l OF VIOLATION

i Dear Mr. Colomb:

i

On November 16,1996 the NRC completed an inspection at your FitzPatrick Power Plant.
Please note that this report is. written in accordance with the new NRC standardized

i reactor inspection report outline and, as such, will typically not address all of the outline

j topics established by that outline. The enclosed report presents the results of that

j mspection.

1

[; Overall, plant operation and major outage activities were conducted safely and were well

controlled with good management oversight. However, the event that resulted in the

j incorrect control rod drive to be removed is of concern to the NRC. The event was

t compounded by several problems in your organization, including poor communications

j among departments, inadequate questioning by operators and inadequate review by the

' engineering staff at FitzPatrick. In this example, when faced with unexpected conditions,

i there were several opportunities for plant and contractor personnel to stop work and

j investigate the anomalies, but this was not initially done.

I

- In addition, weaknesses were identified with your control of design, test, and corrective

, action programs. Collectively, these examples represent a lack of rigor and weaknesses in

j' communication involving some engineering design activities.

!

! Based on the results of this inspection, the NRC concluded that violations of NRC

requirements occurred. You are required to respond to this letter and should follow the

i instructions specified in the enclosed Notice of Violation (Notice) when preparing your

response. In your response, you should document the specific actions taken and any

"

additional actions you plan to prevent recurrence. Your response may reference previous

[ docketed correspondence if the correspondence adequately addresses the required

i response. Please include as a part of your response those corrective actions you intend to

take to understand the broader implications of these violations. After reviewing your

. response to this Notice, including your proposed corrective actions and the results of

future inspections, the NRC will determine whether further NRC enforcement action is

i necessary to ensure compliance with NRC regulatory requirements.

1

4

190008

l

I 9612190026 961213 *

s(

t

PDR ADOCK 05000333 0FFICIAL RECORD COPY IE:01

- Q. PDR

_ __ .-. -__ ~ -_ _ _. _

_.

. __ _. . . _ _ _ _ - _ _. . . _ _ _ . _ . . . _ _ _. _.

-

,

...

4

Michael J. Colomb 2

i in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

To the extent possible, your response should not include any personal privacy, proprietary,

or safeguards information so that it can be placed in the PDR without redaction.

We appreciate your cooperation.

I

j Sincerely,

Original Signed by:

Curtis J. Cowgill 111, Chief

'

Projects Branch 2

'

Division of Reactor Projects

}

Docket No.: 50-333

License No.: DPR-59

Enclosures:

1. Notice of Violation

2. Inspection Report Number 50-333/96-07

cc w/encis:

C. D. Rappleyea, Chairman and Chief Executive Officer

R. Schoenberger, President and Chief Operating Officer

,

W. J. Cahill, Jr., Chief Nuclear Officer

.

H. P. Salmon, Jr., Vice President of Nuclear Operations

W. Josiger, Vice President - Engineering and Project Management

l

'

J. Kelly, Director - Regulatory Affairs and Special Projects

T. Dougherty, Vice President - Nuclear Engineering

R. Deasy, Vice President - Appraisal and Compliance Services

R. Patch, Director - Quality Assurance

G. C. Goldstein, Assistant General Counsel

C. D. Faison, Director, Nuclear Licensing, NYPA

T. Morra, Executive Chair, Four County Nuclear Safety Committee

Supervisor, Town of Scriba

i C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

J P. Eddy, Director, Electric Division, Department of Public Service, State

of New York

G. T. Gocring, Consultant, New York Power Authority

4 J. E. Gagliardo, Consultant, New York Power Authority

F. William Valentino, President, New York State Energy Research

l and Development Authority

.

J. Spath, Program Director, New York State Energy Research

l and Development Authority

i

.

!

a

.s

- _y.

_ _ _ _m . . _ ___. __. _. _ ._ _ __ _ - . _ . _ . _ _ _ _ _ _

l

r*

l

~

Michael J. Colomb 3

Distribution w/encls: l

D. Serenci, PAO (1) )

Nuclear Safety information Center (NSIC) i

PUBLIC l

NRC Resident inspector )

,

Region i Docket Room (with concurrences) l

l

R. Correia, NRl; '

R. Frahm, Jr., NRR

L. Cunningham, NRR

D. Barss, NRR

R. Barkley, DRP

R. Junod, DRP

Distribution w/encls: (VIA E-MAIL) j

W. Dean, OEDO (WMD) j

S. Bajwa, NRR

'

l

'

K. Cotton, NRR

D. Hood, NRR

M. Campion, RI 1

Inspection Program Branch, NRR (IPAS)

l

t

l

.

i

i

i

!

DOCUMENT NAME: G:\ BRANCH 2\lR96-07.FTZ

, Ta receive a copy of this document, indipate in the box: 'C' = Copy pithout attachment / enclosure "E" = Copy with attachment / enclosure *N' = No copy

OFFICE Rl!DRP b/ff) Rl/DRP //jf Rl/DRP pc

l NAME- ,GHunegs /ffjp RBarkley f///), CCowgill

'

DATEye '12/)S96 / ' 12/13/96 /' 12//g96

OFFICIAL RECORD COPY

l