ML20133D889

From kanterella
Revision as of 13:49, 4 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 70-1113/85-05 on 850415-19 & 0524.No Violation or Deviation Noted
ML20133D889
Person / Time
Site: 07001113
Issue date: 07/01/1985
From: Barr K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Lees E
GENERAL ELECTRIC CO.
Shared Package
ML20133D893 List:
References
NUDOCS 8508070509
Download: ML20133D889 (2)


Text

. . _ . _ __ _ _ _ _ _ _ _ .. __ _

l

&fic$tS 6

4

. JUL 01 M5

, i General Electric Company ATTN- Mr. Eugene A. Lees, General Manager Nuclear Fuel Manufacturing

Department P. O. Box 780 Wilmington, NC 28402 Gentlemen

SUBJECT:

REPORT NO. 70-1113/85-05 i

j On April 15 - 19, and May 24, 1985, NRC inspected activities authorized by NRC

, License No. SNM-1097 for your General Electric Wilmington Facility. At the  ;

j conclusion of the inspection, the findings were discussed with those members of  :

your staff identified in the enclosed inspection report.

! The inspection was an examination of activities conducted under your license with i respect to radiation safety and compliance with NRC regulations and the t i conditions of your license. It included selective examinations of procedures and ,

, representative records, interviews with personnel, and direct observations by the  ;

i inspector. ' '

l Within the scope of the inspection, no violations or deviations were identified.

! Your attention is invited to an unresolved item identified in the inspection

report. This matter will be pursued during future inspections.

1 i

! In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures L will be placed in NRC's Public Document Room unless you notify this office by i telephone within ten days of the date of this letter and submit written l application to withhold information contained therein within thirty days of the

! date of the letter. Such application must be consistent with the requirements l j of2.790(b)(1).

1 Should you have any questions concerning this letter, please contact us, i

l Sincerely,  ;

I j Kenneth P. Barr, Chief f 3

Nuclear Materials Safety  :

and Safeguards Branch i

! Division of Radiation Safety l and Safeguards

Enclosure:

(See page 2) i  !

l

PJ' Te8N 895$3 l

' C (

SEQ 7 6(

r-.----__--_.---------_-.----

s- ~. 's

, General Electric Company .

2

Enclosure:

Inspection Report No.'70-1113/85-05 cc w/ encl:

C. M. Vaughan, Manager Regulatory Compliance bec w/ encl:

Document Control Desk State of North Carolina i

RI! Ril RI!

l uM WGWsen: 1b 6/;0/85 W

DMontgomery RI DCollins 8 Fe JKa th R1 EM ine RII B

6Aya/85 '/2785 6/28/85 6/21/85 85 R!!

GJrnk s 85 6/g/l

,