ML20135A453

From kanterella
Revision as of 15:36, 20 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-458/96-17 on 961215-970201 & Notice of Violation
ML20135A453
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/20/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
Shared Package
ML20135A456 List:
References
NUDOCS 9702270180
Download: ML20135A453 (4)


See also: IR 05000458/1996017

Text

e

t # "G UNITED ST ATES

. ,$p W,IS NUCLEAR REGULATORY COMMISSION

MEGloN IV

  • e

S 8 611 RY AN PLAZA DRIVE, SUITE 400

$9

'

,

8 AR LINGToN, T E X AS 760118064 i

  • ..*

FEB 201997 l

l

John R., McGaha, Vice President - Operations

River Bend Station

Entergy Operations, Inc.

P.O. Box 220 ,

St. Francisville, Louisiana 70775 j

i

SUBJECT: NRC INSPECTION REPORT 50-458/96-017 AND NOTICE OF VIOLATION

Dear Mr. McGaha:

I

An NRC inspection was conducted December 15,1996 through February 1,1997, at your i

River Bend Station reactor facility. The enclosed report presents the scope and results of  ;

that inspection. I

During the 7-week period covered by this inspection period, your conduct of activities at i

the River Bend Station facility was generally characterized by safety-conscious operations, 1

sound engineering and maintenance practices, and good radiation protection support. We

are concerned, however, about one violation of NRC requirements that was identified.

This violation is of concern because personnel failed to implement corrective actions to

preclude dropping objects into the standby cooling tower basin.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances l

surrounding the violation is described in detail in the enclosed report. Please note that you  ;

are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, )_

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice " a copy of this letter,

its enclosures, and your response will be placed in the NRC Public Document Room (PDR).

To the extent possible, your response should not include any personal privacy, proprietary,

or safeguards information so that it can be placed in the PDR without redaction.

Should you have any questions conceming this inspection, we will be pleased to discuss

them with you.

Sincerely,

y

M Arthu T. HowellIll, Actibg Director

g Division of Reactor Projects

9702270180 970220

PDR ADOCK 05000458

0 PDR

.

- l

Entergy Operations, Inc. -2-

1

Docket No.: 50-458

License No.: NPF-47

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-458/96-017

cc w/ enclosures:

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

-General Manager

Plant Operations

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

Director - Nuclear Safety

River Bond Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775 )

Wise, Carter, Child & Caraway )

P.O. Box 651

Jackson, Mississippi 39205

Mark J. Wetterhahn, Esq.

Winston & Strawn

,

1401 L Street, N.W.

'

Washington, D.C. 20005-3502  !

!

'

i

i

!

~

l

!

l

..

Entergy Operations, Inc. -3- l

l

l

Manager - Licensing l

River Bend Station j

Entergy Operations, Inc.

P.O. Box 220 .

St. Francisville, Louisiana 70775 5

1

The Honorable Richard P. leyoub i

Attorney General

P.O. Box 94095 j

Baton Rouge, Louisiana 70804-9095

'

H. Anne Plettinger

3456 Villa Rose Drive

. Baton Rouge, Louisiana 70806

President of West Feliciana

Police Jury

P.O. Box 1921

St. Francisville, Louisiana 70775

Larry G. Johnson, Director

Systems Engineering

Cajun Electric Power Coop. Inc.

10719 Airline Highway

P.O. Box 15540

Baton Rouge, Louisiana 70895

William H. Spell, Administrator

Louisiana Radiation Protection Division

~ P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

!

..

l

.

Entergy Operations, Inc. -4- FEB 2 01997

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Don Taylor (DRT) ,

E-Mail report to Richard Correia (RPC) j

i

bec to DMB (IE01)

bec distrib. by RIV:

Regional Administrator Senior Resident inspector (Grand Gulf)

DRP Director DRS-PSB i

Branch Chief (DRP/D) MIS System '

Projsct Engineer (DRP/D) RIV File

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident inspector  ;

!

l

DOCUMENT NAME: R:\ RB\RB617RP.WFS .

To receive copy of document indicate in box:"q" = Copy without enclosures"E" = Copy with enclosures"Ill" = No copy /

SRI E C:DRPQJ A/D[QF ), l I

WFSmith PHHa#F ATIMVell if,'  ;

' '

02/10/97 02/ bi97 02/20/97

OFFICIAL RECORD COPY

h,NU .

.

. . - . . - - - - _

- - - . _ _ - - - - - . .- . . . - . . . - . . . _ - .

.

.

Entergy Operations, Inc. -4 FEB 2 01997

,

!

, E-Mail report to T. Boyce (THB)

!' E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Don Taylor (DRT) '

E-Mail report to Richard Correia (RPC)

i

bec to DMB (IE01)

I i

bec distrib. by RIV:

Regional Administrator Senior Resident inspector (Grand Gulf)

DRP Director DRS-PSB

Branch Chief (DRP/D) MIS System j

Project Engineer (DRP/D) RIV File  !

Branch Chief (DRP/TSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident inspector ,

!

!

!

l

l

DOCUMENT NAME: R:\_RB\RB617RP.WFS

To receive copy of document indicate in box:"g" = Copy without enclosures"E" = Copy with enclosures"Ill" = No copy

SRI E C:DRP(LK A/Dfg L

WFSmith PHHad $/ ATl4% fell if,'

'

02/10/97 02/ bYD7 02/20/97

OFFICIAL RECORD COPY