. _
,
k
.
i i
' g* "' 0 g 0t UNITED STATES
.71
NUCLEAR REGULATORY COMMISSION
[
j lZY a$
REauoN ev
[
611 RYAN PLAZA DRIVE, SulTE 400
!
%
..... #[
'
U
%,
ARLINoToN, TEXAS 76011-8064 APR 4 1997 l
l i
John R. McGaha, Vice President Operations i
River Bend Station
. Entergy Operations, Inc.
P.O. Box 220
.
St. Francisville, Louisiana 70775
!
r SUBJECT: NRC INSPECTION REPORT 50-458/96-17
}
Thank you for your letter of March 24,1997, in response to our letter and Notice of
}
!
Violation dated February 20,1997. We have reviewed your reply and find it responsive to
-
v the concerns raised in our Notice of Violation. We will review the implementation of your
!
l corrective actions during a future inspection to determine that full compliance has been
!
achieved and will be maintained.
'
Sincerel
~
!
Shomas P. Gwynn, ire or I
Division of Reactor P ects'
Docket No.: 50-458 License No.: NPF-47 cc:
Executive Vice President and q
Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 l
Vice President Operations Support Entergy Operations, Inc.
100008
\\
P.O. Box 31995
\\
Jackson, Mississippi 39286-1995 lappsppppsps
.
9704100086 970404
.f PDR ADOCK 05000458-O PDR;;,
.
Entergy Operations, Inc.
-2-General Manager
,
Plant Operations River Bend Station Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Corter, Child & Caraway P.O. Box 651
Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.
l Winston & Strawn j
1401 L Street, N.W.
$Nashington, D.C. 20005-3502 j
Manager - Licensing River Bend Station j
Entergy Operations, Inc.
'
P.O. Box 220
'
St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attorney General P.O. Box 94095 Baton Rouge, Louisiana 70804-9095 H. Anne Plottinger 3456 Villa Rose Dnve Baton Rouge, Louisiana 70806 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775
, _.
u
.,
ljs
, Entergy Operations, Inc.
-3.-
.. f..
-
' Larry G. Johnson, Director -
Systems Engineering
' Cajun Electric Power Coop. Inc.
10719 Airline Highway -
-(
P.O. Box 15540 Baton Rouge, Louisiana 70895 William H. Spell, Administrator.
Louisiana Radiation Protection Division P.O. Box 82135
' Baton Rouge, Louisiana 70884-2135 t
!
l-i f
f
!
i j
i
...
APR 4m
..
Entergy ' Operations, Inc.
-4-
' bec to DCD.(IE45).
bec distrib. by RIV:
Regional Administrator Senior Resident inspector (Grand Gulf)
DRP Director DRS-PSB
Branch Chief (DRP/D).
MIS System Project Engineer (DRP/D)
RIV File Branch Chief (DRP/TSS)
. Resident inspector
,
,
-
.)
.{
l.;
I l
I i
t
!
I DOCUMENT NAME: R:\\ RBS\\RB617AK.WFS l
To recoho copy of docenent, indicate in box: "C" e Copy without enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/D -
C:DRP/D
,,3 D:DRP
/J o
,
GFi,ck:cq)%((
PHHarre%3 TPGwynn M
04/Q /97.
04/ 9 /97 U. 04/ / /97 V
.j
-
OFFIC AL RECORD COPY-
{
f
- -
!
!
..
-
..
-
-
-
.
... _,.
'
,.
'i APR 4 1997 jp-I-
Entergy Operations, Inc.
-4-
- bec to DC bec distrib. by RIV
L L
Regional Administrator Senior Resident inspector (Grand Gulf)
l DRP Director DRS PSB Branch Chief (DRP/D)
MIS Systern -
Project Engineer (DRP/D)
RIV File Branch Chief (DRP/TSS)
Resident inspector-DOCUMENT NAME: R:\\_RBS\\RB617AK.WFS To receive copy of document, indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy PE:DRP/D C:DRP/D,,, l) D:DRP f)
,
GSPi,ck;cM PHHarreO% TPGwynn W
>
04/4 /97 04/ 9 /97 V 04/g /97 V
OFFIClAL RECORD COPY
\\
o
,D
,
.
-.. -.. - -... _ - -.
.
-- -
- -..
'. 'f
- Entergy Operations.inc.
"
'
River. Bend $taten
-
!
i 5485 U. S. Highway 61 m'
..
PO Box 220
.
.
t
,I'
e.."
IE Tel 504 336 6225 7)
St Francisvdle. LA 70775
Fax 504 635 5068.
t
>.
.
!
'
Rick J. King -
.
Drector
Nxtear Safety & Regulatory Affairs
i
.. g
{im$Nbhkh j
Ui l
- bjj
]
- March' 24,1997 -
I un3l
!
l
t.
nm i
- !
U.S. Nuclear Regulatory Commission
'
!
E
.
i
u p% g 3 h l i
ATTN: Document Control Desk
'
M/S PI-37.
Washington, DC 20555-0001
'i i
Subject:
Reply to' Notice of Violation IR 96-017
[
River Bend Station - Unit I i
License No. NPF-47 -
l Docket No. 50-458
.
File Nos.:
G9.5,G15.4.1 l
RBG-43824
,
RBF1-97-0105 j
Gentlemen:
!
!
Pursuant to the provisions of 10CFR2.201, Attachment A provides the Entergy
!
,
Operations, Inc. response to the notice of violation described in NRC Inspection Report i
'
?
50-458/96-017.
.
The subject violation 50-458/9617-03 involved an individual failing to implement actions to preclude dropping objects into the standby cooling tower basin is addressed in Attachment A.
Should you have any questions regarding the attached information, please contact Mr.
David Lorfing of my staff at (504) 381-4157.
.
Sincerely,
,
b n
.c L
RJK/CRM (/
t attachments.
!
l
!
97--0900 i
moun nam ~
-
.-_
-
-
- .,,
-
Iy
'
- i.
/'
.,, y :,
,.
!
.
! ll
. Reply to Notice of Violations in 50-458/96-017L March 24,1997
. RBG-43824
' RBF1-97-0105
- Page 2 of 2
'
P cc:
' U. S. Nuclear Regulatory Commission -
-
RegionIV
'
'
611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011
. NRC Sr. Resident Inspector P. O. Box 1050 St. Francisville, LA 70775
. David Wigginton
' NRR Project Manager U. S. Nuclear Regulatory Commission M/S OWFN 13-H-3
. Washington, DC 20555
.
5
- 9
_.
_a_
-.--
-
-.-
. - - -
..
. - -. -. -
--
.
- -. -.
--
%
I
!
-
..
.
!
W
%....
~ ^TTACHMENT A
REPLY TO NOTICE OF VIOLATION 50-458/9617-03 l
Page 1 of 2
Violation:
{
' During an NRC inspection conducted on December 15,1996 through February 1,1997, a
violation of NRC requirements was identified. - In accordance with the " General
Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the i
'
violation is listed below:
Criterion V of Appendix B to 10 CFR Part 50 requires, in part, that activities affecting quality be prescribed by documented instructions of a type appropriate
- i to the circumstances and be accomplished in accordance with these instructions.
i i
A sign, which provided instructions of a type appropriate to the circumstances,
!
installed on the entrance to the standby service water (SSW) pump room stated
that the SSW pumps were not protected by suction strainers and that all gaps in i
the floor must be covered during work to preclude dropping items into the SSW basin.
)
Contrary to the above, on January 17,1997, activities affecting quality were not accomplished in accordance with instructions in that all gaps in the floor were not covered during work to preclude dropping items into the SSW basin.
Reasons for the Violation:
The cause of this violation was that corrective actions from a 1991 condition report were
not effective in providing proper controls to assure that the floor penetrations in the standby cooling tower (SBCT) pump room were protected from the introduction of foreign materials.
- During the investigation into the root cause of this event, corrective action process changes, foreign material exclusion (FME) controls, FME culture, and operator awareness were evaluated. The corrective action culture has changed significantly since 1991. The Corrective Action Process was revised in 1994 and has resulted in a lower threshold for problem identification, more effective root cause evaluation and corrective action identification.
FME culture was evaluated through the use of a short questionnaire about FME. This survey was performed on a random selection of contractor and EOl craft personnel. The questionnaire provided a 100% positive response indicating a good awareness of FME controls and the actions to take if they should drop something into an open plant system.
Even though the operator did not see the sign posted on the pump room door, he showed i
proper concern and attention to detail for FME controls through his actions during the time that he was performing test activities in the pump room.
t
,
.
t
,
,
-
,
-n--
--
,,
e
_
'a
.
,
1o ATTACHMENT A REPLY TO NOTICE OF VIOLATION 50-458/9617-03 i
Page 2 of 2 Corrective Actions That Ilave Been Taken:
1. As an interim corrective action, the sign installed on the SBCT pump room door in 1991 was replaced with a larger (18x12 inches versus 10x8 inches), concisely worded (19 - 1" high words versus 50 - 5/16' words) sign until remaining actions are completed.
2. An Engineering Request (ER) was initiated to evaluate the appropriate method for
)
'
covering floor penetration openings in the Division 1 and 2 pump rooms of the SBCT.
Corrective Actions That Will Be' aken to Avoid Further Violations:
'
1. Install covering / barrier for floor penetration openings as determined in the ER.
(Completion Date: August 29,1997)
,
Additional Actions:
1. Reinforce the importance of sign awareness and compliance with plant personnel.
Date When Full Compliance Will Be Achieved:
River Bend is currently in compliance, however long-term corrective actions will be completed by August 29,1997.