Forwards Addendum 1 to Rev 2 to ISI Program Second Ten Yr Interval Units 2 & 3 for Peach Bottom Atomic Power Station
ML20095G075
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/15/1995
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095G078 List:
References
NUDOCS 9512200009
Download: ML20095G075 (2)


Text

Station Support Depcstmont 4

10 CFR 50.55s

=r

+-

"--* c~~"

i PECO ENERGY Nuclear Group Headquarters 965 Chesterbrook Boulevard ,

Wayne, PA 19087-5691 l December 15,1995 Docket Nos. 50-277 l 50-278 Ucense Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Addendum 1 to Revision 2 of the Second Ten Year Interval of the Inservice Inspection (ISI) Program

References:

1. Letter from G. A. Hunger, Jr. (PECO Energy Company) to U. S. Nuclear Regulatory Commission (USNRC), dated November 15,1990

Dear Sir:

in the Reference tter, PECO Energy Company provided to the U. S. Nuclear Regulatory Commission (Ul a revised version of the " Inservice Inspection (ISI) Program Second Ten Year Interval." Attact . 'or your reference are updated sections of the Second Ten Year Interval inservice inspection (ISI) Program. This revision is identified as Addendum 1 to Revision 2. These sections include tne text portion of the program, Appendix A (" Relief Roquests"), Apoendix B

(" Augmented Programs"), and Appendix C (" Reference Drawings"). This revision is an administrative revision and doca not constitute a revision to the implementation of the ISI program. Tne purpose of this addendum is to: 1) update the Augmented Inspection Programs applicable to reactor pressure vessel intemals to reflect the latest Boiling Water Reactor Vessel and Internals Project (BWRVIP) based planning, 2) incorporate other changes resulting ' om ine transition of the programmatic responsibility from the Nuclear Group Headquarters to the station,3) reflect additional plant modi'! cations, and,4) Incorporate miscellaneous programmatic adjustments.

The attachment is submitted for your information. No action is requested. If you have any questions, please contact us.

Very truly yours,

.0. ,f ,

G. A. Hunger, J .

Director - Licensing Attachment cc: T. T. Martin, Administrator, Region I, USNRC ,

W. L Schmidt, USNRC Senior Resident inspector, PBAPS 9512200009 951215 T' i ,

PDR

. <. G ADOCK 05000277 pr l

. - , _, .PDR .-

1 l

I e

t

?'

i PEACH BOTTOM ATOMIC POWER STATION UNIT 2 & 3 INSERVICE INSPECTION PROGRAM SECOND INTERVAL

+