Forwards Revised Physical Security Plan.Revs Withheld Per 10CFR73.21
ML20100P295
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/28/1996
From: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9603110117
Download: ML20100P295 (2)


Text

s G:ralj R. Rainey

, Vice Presidesit Peacn Bottom Atomic Power Station

- :==ik v

PECO ENERGY  ;;=gg-"v Delta. PA 17314 9739 717 456 7014 10CFR 50.54(p) February 28,1996 Docket Nos.: 50-277 50-278 U. S. Nuclear Regulatory Commission 1

ATTENTION: Document Control Desk Mail Station P1-137 Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station Unit 2 and Unit 3 Revisions to the Physical Security Plan lfg

Dear NRC Officials:

i

) This letter submits, in accordance with 10CFR 50.4(b)(4)(iii), four (4) controlled copies of the revised l r Peach Bottom Atomic Power Station (PBAPS) Physical Security Plan. The revisions are detailed for the l Plan in the respective Summary of Plan Revisions.

~

~

ioj g These changes are being submitted in accordance with the NRC Final Rule 10CFR73, " Protection Against Malevolent Use of Vehicles at Nuclear Power Plants", dated August 1994, which amended the regulations concerning the design basis threat for radiological sabotage to include the use of a land vehicle by adversaries for transporting personnel and their hand carried equipment to the proximity of vital areas, and to include a land vehicle bomb.

77 ;

c

!" These revisions are being submitted in accordance with 10CFR 50.54(p)(2), and have been determined j not to decrease the effectiveness of the PBAPS Physical Security Plan.

[ In accordance with 10CFR 73.21, we request that the enclosed revisions to the PBAPS Physical Security Plan which contain Safeguards Information, be withheld from public disclosure and protected, as described in 10CFR 73.21.

Sincerely,

~

f /7 fflAs Gerald R. Rainey ,

Vice President, Peach Bottom Atomic Power Station w l;dd GRR/DRM/ GAB:sab Enclosures (4) cc: T. T. Martin, Administrator, Region 1. USNRC (Enclosures - 2)

W. L. Schmidt, Senior Resident inspector, USNRC (Enclosures - 1)

R. I. Mclean, Department of Natural Resources (w/o Enclosures)

R. R. Janati Director, Bureau of Radiation Protection (w/o Enclosures) gnr 0 ^"*i" ""*'"'"*""8- **^'"""**'*'i"-(*' 8 '"' '"'

v5vV B. Gc,rman, Public Service Electric & Gas (w/o Enclosures)

H. C. Schwemm. Atlantic Electric (w/o Enclosures)

ENCLOSURES CONTAIN SAFEGUARDS INFORMATION, UPON SEPARATION, THIS LETTER IS DECONTROLLED {

CCN: 96-14021 9603110117 960228 PDR F ADOCK 05000277 PDR lf Y

~

\

Subject:

Pcach Bottom Atomic Power Station Unit 2 and Unit 3 4' ' Revisions to the Physical Security Plan February 28,1996

' Page 2 of 2 bec: G. A. Bird Enclosures (2) SCl-1 PBAPS J. B. Cotton - w/o Enclosures 51 A 1 Chesterbrook G. L Edwards w/o Enclosures A4-Is PBAPS J. W. Durham w/o Enclosures S23-1 Philadelphia A. A. Fulvio w/o Enclosures SMB4-5 PBAPS G. A. Hunger, Jr. w/o Enclosures 62A-1 Chesterbrook R. A. Kankus w/o Enclosures 61C-1 Chesterbrook M. A. Karney . Enclosures (2) TSCl-2 Limerick M. C. Kray w/o Enclosures - 62 A-t - Chesterbrook C. A. McNeill, Jr. w/o Enclosures S23-1 Philadelphia -

D. R. Meyers w/o Enclosures ' SMB4-8 PBAPS G. R. Rainey w/o Enclosures SMB4-9 PBAPS D. M. Smith w/o Enclosures 63C-3 Chesterbrook A. J. Wasong w/o Enclosures A4-SS PBAPS DAC w/o Enclosures 61B-3 Chesterbrook Correspondence Control Desk (w/o Enclosures) 61B-5 Chesterbrook 4