ML20062F547

From kanterella
Revision as of 16:09, 24 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for June 1982
ML20062F547
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 07/02/1982
From: Scott W
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20062F528 List:
References
NUDOCS 8208120076
Download: ML20062F547 (3)


Text

-

M-lus10 (23; gj77 AVERAGE DAILY UNIT POhER LEVEL

, DOCKET NO. _50-275 UNIT -Diablo Canyon Unit DATE 7 /2/82 COMPLETED BY W. B. Scott TELEPHONE (805) 595-7351

! MONTH _ JUNE 1982 DAY AVER AGE DAILY POWER LEVEL DAY (MWe Neti AVER AGE DAILY POWER LEVEL IMWe Neti I 0 37 0 2 0 18 0 3 0 39 0 4 0 20 - 0

  • 5 0 _

21 0 6

22 0 7 0 23 0 8 0 24 0 9 0 25 _ 0 10 0 26 0 11 0 27 0 12 28 - 0 13 0 29 0 14 0 30 0 15 0 3,

16 0 INSTRUCTIONS On thiswhole the nearest fortnat, list the average daily unit power lesd m MWe Net for megawatt. .

each day in th u e to (9 /77 )

8208120076 820706 PDR ADOCK 05000275 R PDR -

69-10507 (23) 9/77 OPERATING DATA REPORT .

DOCKET NO. 50-275 DATE 7/2/82 COMPLETED BY W.B. Scott TELEPHONE (805) 595-7351 OPERATING STATUS Diablo Canyon Unit 1 Notes

1. Unit Name:
2. Reporting Period: 11u np _ 1982
3. Licensed Thermal Power (MWt): 166.9
4. Nameplate Rating (Gross MWe): 1170
5. Design Electrical Rating (Net MWe): 1084
6. Maximum Dependable Ca'pacity (Gross MWe): 1134
7. Maximum Dependable Capacity (Net MWe): 1084
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:

-NONF-

9. Power Level To which Restricted. If Any (Net MWe): 10. Reasons For Restrictions,1f Any: Suspended Low Power Test License This Month Yr.-to.Date Cumulatise 0 0 0
11. Hours In Reporting Period 0 0 0
12. Number Of Hours Reactor Was Critical 0 0 0
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On.Line 0 0 0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 0 0 0 0 0 0
17. Gross Electrical Energy Generated (MWH) _,
18. Net Electrical Energy Generated (MWH) 0 0 0
19. Unit Service Factor N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A _
22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:

-NONE-

25. If Shut Down At End Of Report Period. Estimated Date of Startup: SeDtember. 1982 (fuel load)
26. Units in Test Status (Prior to Commercial Operation p: Forecast Achiesed INITIA L CRITICA LITY NOV. 1982 INITIAL ELECTRICITY NOV 1982 COMMERCIAL OPERATION FEB. 1983 pu;;i

69-10809 (25) 9/77 DOCKET NO. 50-275 UNIT SilUIDOWNS AND POWER REDUCTIONS Diablo Canyon Unit 1 UNIT N AME DATE 7/2/82 COMPLETED BY W. B. Scott REPORT MON 111 JUNE 1982 TELEPHONE (805) 595-7351 i 15 jg 'h 4 Yi Licensee gg Cause A Corrective N. . Date a ti 2 i jj5 Event s? h8 o- Action to

@ j@ y jgg Report n (N 0 fU Prevent Recurrence i 6

810928 F 0 H 4 81-002/01T ZZ ZZZZZZ Halted fuel loading preparations upon discovery of seismic calculation errors. Reanalysis and reviews are being conducted in accordance with Commission's instructions.

I 2 3 4 F: Forced Reas m: Method: Exhibit G - Instructions S S(beduled A.Equipmen' Failure (Explain) 1. Manual for Preparation of Data B. Maintenance of Test 2. Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D. Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Ad nunist rative 5 G. Operational Error IExplain) Exhibit I Same Source

, to/77) II Other il% plain)

W .