  • MONTHLY NARRATIVE REPORT
  • OF OPERATION AND MAJOR MAINTENANCE ~ EXPERIENCE This report describes the operating and major maintenance experience for the month of October,1984. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the Plant Technical Specifications.

On October 30, 1984 a full scale emergency response plan exercise drill was successfully conducted involving local, county and state government agencies and observed by members of the Nuclear Regulatory Commission and the Federal Emergency Management Agency.

There is no significant operating experience or major safety-related maintenance to report. ,

No challenges to the PORV's or safety valves have been made.

-No changes have been made in the Offsite Dose Calculation Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.

L s

gf29

$8M'** diam, 'A PDR DC0044 3 -

a u

I> OPERATING DATA REPORT:

. DOCKET NO. 50-275 DATE- 11/05/84-COMPLETED BY W.J. Kelly

, TELEPHONE _ (805)595-7351

!0PERATING STATUS-1.; Unit Name:- Diablo Canyon Unit 1

2. Reporting Period: -October-1984 Full power. operating license
3. . Licensed-Thermal Power (MWt): 3338 issued November 2, 1984.-
14. Nameplate Ratin'g (Gross;MWe): 1170

' 5. : Design. Electrical Rating (Net-MWe): 1084

6. -Maximum Dependable Capacity (Gross MWe):- -1134 7.. Maximum Dependable Capacity (Net MWe): 1084

. 8. _If Changes 0ccur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe): N.A.
10. Reasons For Restrictions, If Any: None This Month Yr-to-Date , Cumulative
11. ' Hours In Reporting Period .

744 7320 7320

12. . Number Of Hours Reactor Was Critical- 0 361 361
13. ' Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line. 0 0 0
15. Unit Reserve Shutdown Hours 0 0- 0 J 16 ~. Gross Thermal Energy Generated _(MWH) 0 15056.2 15056.2
17. Gross: Electrical Energy' Generated (MWH) 0 0 0

-18.-. Net Electrical Energy. Generated (MWH) 0 0 0-

^ 19. Unit Service Factor N/A

{20._ Unit Availability Factor . . N/A

- 21. , Unit Capacity Factor (Using MDC Net)

~

N/A f ;22. Unit Capacity-Factor _(Using DER. Net) N/A-

23. . Unit Forced Outage Rate N/A-124. Shutdowns Scheduled Over Next-6 Months (Type, Date, and Duration of Each):

'25. If-Shut Down At End Of Report Period, Est. Date of Startup: NOVEMBER 1984 L :26. Units In Test Status (Prior to~ Commercial Operation): Forecast Achieved INITIAL CRITICALITY April 1984 April 1984 L INITIAL ELECTRICITY -November 1984 ,

COMMERCIAL OPERATION January 1985 7

i

-:DC0044 -4.

E -

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-275 UNIT. Diablo Canyon Unit 1 DATE 11/05/84 COMPLETED BY W.J. Kelly TELEPHONE (805)595-7351

- MONTH October 1984 AVERAGE DAILY POWER LEVEL 4

DAY DAY AVERAGE DAILY POWER LEVEL (lWE-NET) (fWE-NET) 1.' _

0 17 0 2 0 18. 0 3 0 19 0 4 'O 20 -0 l 5 0 21 0 6- 0 22 0 7 0 23 0 8 0 24 0 9 -0 25 0 10 0 26 0 l 11 0 27 0 12 0 28 0, 13 0 29 0 14 0 30 0 15 0 ~31 0 16 0 l.-

INSTRUCTIONS i  : 0n this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

l DC0044 5

.._,_.m . _ _ , . . - _;_,__. _ . . _ . _ . _ . _ _ _ . _ . _ . . _ _ _ _ _ _ _ _ - .

' UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO. 275 UNIT NAE DIA3LO CANYON UNIT 1 .

DATE 11/ 3 /84 C&PLETED BY W.J. (ELLY TELEPH0E (805bT>-/351 REPORT MONTH OCTOBER 1984 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action'to No. Date Typel (Hours) Reason 2 Dawn Reactor 3 Report # Code Code 5 Prevent Recurrence NONE THIS MONTH s

1 2 3 ~4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure-(Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling ,3-Automatic Scram. Event Report (LER) File D-Regulatory Restriction 4-Other(Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other(Explain)

DC0044 6

y.-

. <'. -a PACIFIC GAS AND E LE C T RIC C O M PANY pgg , DIABLO CANYON POWER PLANT I RO. Box 56 Avila Beach, California 93424 - (805) 595-7351 R.C. THORNBERRY -

PLANT MANAGER November 5,1984 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 RE: Docket No. 50-275 License No. DPR-80 Monthly Operating Report for October,1984 Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for October 1984. This report is submitted in accordance with Section 6.9.1.10 of our Technical Specifications.

Sincerely, R. C. THORNBERRY RCT:lah Enclosures ,

cc Mr. John B. Martin, Regional Administrator Region V - USNRC L