Se OPERATING DATA REPORT DOCKET NO. 50-275 DATE 02/03/86 COMPLETED BY Bob kanick TELEPHONE (805)695-7351 OPERATING STATUS  !

1. Unit Name: Diablo Canyon Unit 1
2. Reporting Period: January 1986
3. Licensed Thermal %wer (MWt): 3338
4. Nameplate Ratir.g (Gross MWe): 1137
5. Design Electrical Rating (Net MWe): 1086
6. Maximum Dependable Capacity (Gross MWe): 1125**
7. Maximum Dependable Capacity (Net MWe): 1073**
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: None This Month Yr-to-Date Cumulative *
11. Hours In Reporting Period 744.0 /44.0 6478.3
12. Number Of Hours Reactor Was Critical 744.0 744.0 6042.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 744.0 5951.3
15. Unit Reserve Shutdown Hours 0. 0_ _ 0.0 0.0
16. Gross Thermal Energy Generated (PWH) 2424269 2424269 18989720
17. Gross Electrical Energy Generated (MWH) 799300 799300 6313632
18. Net Electrical Energy Generated (MWH) 760189 760189 5994423
19. Unit Service Factor 100.0 100.0 91.9
20. Unit Availability Factor 100.0 100.0__ 91.9
21. Unit Capacity Factor (Using MDC Net) 95.2 95.2 86.2
22. Unit Capacity Factor (Using DER Net) 94.1 94.1 85.2
23. Unit Forced Outage Rate 0.0 0.0 8.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

i Refueling Outage, August 30, 1986, 68 days

25. If Shut Down At End Of Report Period, Est. Date of Start-up: N/A
26. Units In Test Status (Prior to Commercial Operation): N/A o As of comercial operation on 5-7-85 at 0243.

oo These values are predictions - actual values are to be determined by operating experience during the first year of commercial operation.

860424o301 860131 PDR R ADOCK 05000275 PDR f62Y DC0455 g

/

i OPERATING DATA REPORT l

4 DOCKET N0. 50-323 i DATE 02/03/86 COMPLETED BY Bob Kanick TELEPHONE (805)S35-7351  !

OPERATING STATUS

1. Unit Name: Diablo Canyon Unit 2
2. Reporting Period: January 1986 4
3. Licensed Thermal Power (MWt): 3411
4. Nameplate Rating (Gross MWe): 1164
5. Design Electrical Rating (Net MWe): 1119
6. Maximum Dependable Capacity (Gross MWe): 1145***
7. Maximum Dependable Capacity (Net MWe): 1093***
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,
Give Reasons

N/A

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: None i This Month Yr-to-Date Cumulative *
11. Hours In Reporting Period 744.0 744.0 6625.0
12. Number Of "aurs Reactor Was Critical 244.8 244.8 2118.8

]

13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 215.0 215.0 1429.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 i 16. Gross Thermal Energy Generated (MWH) 557756 557756 2678946
17. Gross Ele :rical Energy Generated (MWH) 176600 176500 809400
18. Net Electrical Energy Generated (MWH) 161503 161503 647691
19. Unit Service Factor h/A**

l J 20. Unit Availability Factor N/A**

21. Unit Capacity Factor (Using MDC Net) N/A**
22. Unit Capacity Factor (Using DER Net) N/A**
23. Unit Forced Outage Rate N/A**
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)- 1 i  !

N/A l 25. If Shut Down At End Of Report Period, Est. Date of Start-up: N/A

! 26. Units in Test Status (Prior to Comercial Operation):

Forecast Achieved INITIAL CRITICALITY July 1985 August 1985 IhlTIAL ELECTRICITY October 1985 October 1985 COMMERCIAL OPERATION March 1986 1

1 Cumulative totals started on the April 26, 1985 (Date of effectiveness of Low Power License).

These sections not applicable until commencement of commercial operation.

      • These values are predictions - actual values are to be determined by operating experience during the first year of commercial operation.

l DC0455 i

' ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-275 UNIT Diablo Canyon Unit 1 DATE 02/03/86 COMPLETED BY Eob Kanick TELEPHONE (805)595-7351 l

MONTH January 1986 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1053 17 1059 2 1061 18 1059 3 1060 19 1047 4 1048 20 1063 5 970 21 1055 6 1049 22 1064 7 947 23 958 8 949 24 880 9 1048 25 1065 10 ___

1039 26 1052 11 1055 27 1061 12 1044 28 1062 13 1049 29 1062 14 894 30 1062 15 746 31 1061 ,

16 1054 l INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DC0455

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-323 UNIT Diablo Canyon Unit 2 DATE 02/03/86 COMPLETED BY Bob Kanick TELEPHONE ~(805)S95-7351 MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 44 17 -3 2 401 18 -2 3 -37 19 -2 4 195 20 -3 5 467 21 -3 6 991 22 -4 7 493 23 , -5 8 633 24 -5 -

9 332 25 -5 10 1051 26 -4 11 1053 27 -5

~

12 1049 28 -5 13 130 29 '

-5 14 -7 30 -5 15 -4 31 . -6 16 -3 '

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DC0455 <

/

UNIT SHUTDOWNS AND POWER REDUCTIONS , .

Page 1 of 1 DOCKET N0. 50-275 UNIT NAME Diablo Canyon Unit 1 ,

DATE 02/04/86 COMPLETED BY D.P. SISK REPORT F10 NTH JANUARY 1986 TELEPHONE (805)595-7351 Licensee ause & Corrective Duration Method of System Component Action to Event Type l 3 4 5 No. Date (Hours) Reason Shutdown Report # Code Code Prevent Recurrence None 1 2 3 4 F: Forced Reason Method: Exhibit G - Instructions S: Scheduled A-Equi ment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG-1022)

E-0perator Training & License Examination previous month F-Administrative 5-Power reduction 5 G-Operational Error (Explain) 6,7,8-N/A Exhibit I - Same Source H-Other (Explain) 9-Other DC0455

UNIT SHUTDOWS AND POWER REDUCTIONS *

/

Page 1 of 1 DOCKET l10. 50-323 ,

UNIT NAME .Diablo Canyon Unit 2

  • l DATE -02/04/86 COMPLETED BY __D.P. STSK REPORT MONTH JANUARY 1986 TELEPHONE' ~(805)595-7351 Method of Lic:nsee System Component, Cause & Corr ctive Duration '

2 3 Event 4 5 Action to No. Date Type l (Hours) Reason Shutdown Report # Code Code Prevent Recurrence 1 01/01/86 S 17.2 B 4 NK' NA NA Startup Test 43.8, Turbine Trip.

2 01/02/86 S 39.4 8 2 2-86-001 SJ P The Unit was taken oft the line as part of the Full Load Rejec' tion Test (100 a percent). The LiceAsee Event was

, written to ' report that~during the Full Load Rejection Test, the steam generator 2-3 wat'er levcl dropped below the low-low steam generator water level trip setpoint causing a reactor trip and subsequent turbine trip. The

< ^ low-low water level was caused by the ,

main feedwater pump tripping on overspeed, To prevent recurrence the speed control, system whs adjusted and the mahual speed crossover point ~was ,

lowered.

3 01/08/86 F 19.9 B, 1 NA NA XPT Unit Shutdown to repair phase "B" main ,

bank t'ransformer.

s 4 01/13/86 S 452.5 B 2 NA NA NA Startup Test 43.4, Turbine Trip - Start -

of Strainer Removal Outage 1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructic.ns S: Scheduled A-Equipment Failure (Explain)

, , 1-Manual for Preparation of Data B-Maintenance or Test '

, 2-Manual Scram f.ntry Sheets for Licensee C-Refueling g 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation,from (NUREG-1022)

~

E-Operator Training & License Examination previous month F-Administrati~ev 5-Power reduction 5 G-Operational Error (Explain) 6,7,8-N/A~ Exhibit I - Same Source H-0ther(Explain) 9-Other DC0455

h.

PACIFIC GAS AND E LE C T RIC C O M PANY DIABLO CANYON POWER PLANT Y PO Box 56 Avila Beach. Cahfomia 93424 -(805) 595-7351 lllllllll

[

e_ _ _ _m R.C. THORNBERRY PLANT MANAGE A February 11, 1986 Office of Management Information I

and Program Control I U.S. Nuclear Regulatory Commission Washington, DC 20555 RE: Docket No. 50-275 and 50-323 License No. DPR-80 and DPR-82 Monthly Operating Report for .lanuary,1986 Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Units 1 and 2 for January,1986. This report is submitted in accordance with Section 6.9.1.7 of the Units 1 and 2 Technical Specifications.

Sincerely,

f. e 7 ROBERT C. THORNBERRY l

RCT:lah Enclosures cc Mr. John B. Martin, Regional Administrator Region V - USNRC

@6>Jit DC0455 i

l

' MONTHLY NARRATIVE REPORT

. OF OPERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the '*

month of January,1986. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.7 of the Units 1 and 2 Technical Specifications.

On January 1, 1986 Unit 2 was paralleled to the grid.

On January 2, 1986 Unit 2 tripped during load rejection test. All four Reactor Coolant Pumps tripped.

On January 4, 1986 Unit 2 was paralleled to the grid.

On January 7, 1986 Unit I reduced power to 50% to plug leaking main condenser tubes.

On January 7, 1986 Unit 2 reduced power to 35% to plug leaking main condenser tubes.

On January 8, 1986 Unit 1 returned to 100% power.

On Januery 8, 1986 Unit 2 reduced power and separated from the grid to facilitate repairs to phase B bank transformer.

On January 9, 1986 Unit 2 was paralleled to the grid.

On January 13, 1986 Unit 2 tripped as part of startup test. Unit 2 strainer outage started.

On January 14, 1986 Unit I reduced power to 13% for repairs to HP turbine.

On January 15, 1986 Unit I returned to 100% power.

On January 23, 1986 Unit I reduced power to 58% to plug leaking tubes in main condenser.

On January 24, 1986 Unit I returned to 100% power.

On January 26, 1986 An earthquake was detected by plant seismic instrumentation and was also felt by control room personnel. The maximum ground acceleration at the plant, as determined by Terra Technology seismic monitoring instrumentation system, was 0.0039 .

Unit 1 operated this month with a unit availability factor of 100% and a unit capacity factor of 95.2%. Unit I had to reduce power three times, twice to plug leaking main condenser tubes and once to repair steam leaks on instrument lines for the Ho turbine.

Unit 2 had to reduce power once to plug leaking main condenser tubes. Unit 2 continued startup tests and maintenance prior to commencing the strainer outage on January 13, 1986.

No challenges to the steam generator safety valves have been made.

The Unit 2 pressurizer power operated relief valves cycled during the transient following the automatic reactor and turbine trips during the Full Load Rejection Startup Test on January 2, 1986.

DC0455