Text

y s.

i PACIFIC GAS AND E LE C T RIC C O M PANY DIABLO CANYON POWER PLANT

'pg g' i

PO. Box 56 Avila Beach, Cahtornia 93424 * (805) 595-7311 A C. THORNBERRY PL AP4T 9/APdAGE'R July 6, 1982 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 RE: Docket No.

50-275 License No. DPR-76 Monthly Operating Report for June,1982 i

Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for June, 1982. This report is submitted in accordance with Section 6.9.1.10 of our Technical Specifications.

Sincerely, f$

R. C. THORNBERRY RCT: kcl Enclosure cc: Mr. R. H. Engelken, Director Office of Inspection and Enforcement Region V - USNRC 967 i

8208120072 820706 PDR ADOCK 05000275 R

PDR

.~

MONTHLY t'ARRATI"E REPORT OF OPERATING AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of June, 1982. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the plant Technical Specifications.

There is no significant operating experience or major safety-related maintenance to report.

No challenges to the PORV's or safety valves have been made.

Furthermore, no changes have been made in the Offsite Dose Calculation Procedure or any radioactive waste treatment systems.

Revision 1 to the Environmental Radio-logical Monitoring Procedure was reviewed and approved by the Plant Staff Review Committee (PSRC) on June 3, 1982.

Revision 2 to the same procedure was reviewed and approved by the PSRC on June 18, 1982. The full reports required by Technical Specification 6.14 will be submitted in a future Monthly Operating Report.