OPERATING DATA REPORT DOCKET NO. 50-275 UNIT 1 DATE 01/01/94 COMPLETED BY E. Bourgo J. Stipicevich TELEPHONE (805) 545-3035/4877 OPERATING STATUS

1. Unit Name: Diablo Canyon Unit 1
2. Reporting Period: August 1993
3. Licensed Thermal Power (MWt): 3338
4. Nameplate Rating (Gross MWe): 1137
5. Design Electrical Rating (Net Mwe): 1086
6. Maximum Dependable Capacity (Gross Mwe): 1124
7. Maximum Dependable Capacity (Net MWe): 1073.4
8. If changes occur in capacity ratings (items 3 through 7) since last report, give reasons: N/A
9. Power level to which restricted, if any (Net MWe): N/A
10. Reasons for restrictions, if any: N/A This Month YTD Cumulative
11. Hours In Reporting Period 744.0 5831.0 72933.3
12. Number Of Hours Reactor Was Citical 744.0 5831.0 61443.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 5831.0 60543.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2480942 18992121 190733424
17. Gross Electrical Energy Generated (MWH) 837600 6402200 64193232
18. Net Electrical Energy Generated (MWH) 798880 6100628 60889176
19. Unit Service Factor 100.00 100.00 83.01
20. Unit Availability Factor 100.00 100.00 83.01
21. Unit Capacity Factor (Using MDC Net) 100.19 97.47 77.78
22. Unit Capacity Factor (Using DER Net) 98.87 . 96.34 76.87
23. Unit Forced Outage Rate 0.00 0.00 3.15
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None.
25. If Shut Down At End Of Report Period, Estimate Date of Startup: Not applicable 9401250i 27 'NOi ADOCK 05000275 i"4,'DR R ., 'PDR"