ML20211P302

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1986
ML20211P302
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/30/1986
From: Keller A, Thornberry R
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
DC0445, DC445, NUDOCS 8703020337
Download: ML20211P302 (9)


Text

~

~L g, q

._ "/

- ,q ,

MONTHLY NARRATIVE REPORT ,

0F OPERATION -

AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and majorinaintenance experienbe for the morith of November,1986. This narrative ' report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.7 of the Units 1 and 2 Technical Specifications.

~

On November 1, 1986 Unit.1 started the month shutdown in its first refueling outage. Unit 2 started the month at full powar.

3 On November 5,1986 Unit I entered Mode 5.

^

On November 7, 1986 Unif. 2 reduced power to 40% for demusseling.

On November 9, 1986 IiMit'2 returned to' full poder.

On November 19, 1986 Unit 2 reduced power to 50% to plug leaking  ;

condenser tubes.

On November 20, 1986 Unit 2 returned to full' power.

On November 25, 1986 Unit 2 reduced power to 50% to plug leaking -

condenser tubes and then returned to full power.

On November 30, 1986 Unit I ended the month shutdown for refueling.

Unit 2 ended the month at full power.

m Unit I was continuing its first refueling outage whicn started August 29.

The reactor was reassembled and normal wafer level restored. Condensate "

and feedwatep systems were realigned and flushed fullowing completion of feedwate'r heater replacement.

I '

Unit 2 bperated this month with a unit availability factor of 100% and a unit capacity factor of 95.6%. Unit 2-reauced power three times this month, twice to investigate and repair m: sin condenser tube leaks and once for demusseling the seawater system. -

- No challenges to the steam generator safety valyes or pressurizer power operated relief valves have been made. Unit 1 had numerous safety related '

maintenance activities performed in support of the refueling outage, including:

o Steam generator feedwater sparger ."J" tube replacenient o Stead generator eddy current tube inspection ;,

o. Overhaul of two containment fan cooler unit motors o Nuclear instrument inverter changeout of inverters 1-3 and 1-4 8703020337 861130 PDR ADOCK 05000275 \

R PDR \

DC0455

o -Installation of redundant overcurrent devices for containment penetration conductors ~

-o Diesel Generator 1-1, 1-2 and 1-3 18 month inspections 40 4 kV vital bus wiring inspection o Setting of limit' switches on _ motor operated valves o .' Anchor. Darling model .5500 snubber modifications No ma[of safety related maintenance was performed on Unit 2 this month.

p 4

e

'W u'

DC0455

., OPERATING DATA REPORT DOCKET N0. 50-275 DATE 12/01/86 COMPLETED BY A.T. Keller 4

TELEPHONE (805)S95-7351 OPERATING STATUS

1. Unit Name: Diablo Canyon Unit 1
2. Reporting Period: November 1986
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 1137 -3338 1086 5.}/ Design Electrical 6.,' Maximum Rating Dependable (Net(Gross Capacity MWe):MWe): 1125 7.' Maximum Dependable Capacity (Net MWe): 1073
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) _Since Last Report, Give Reasons:

N/A

9. Power level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: __ None

! This Month Yr-to-Date Cumulative *

11. Hours In Reporting Period 720.0 8016.0 13750.3
12. Nember Of Hours Reactor Was Critical 0.0 5740.4 11038.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 0.0 5714.9 10922.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0.0 16927830 33493283
17. Gross Electrical Energy Generated (MWH) 0.0 5608200 11122532
18. Net Electrical Energy Generated (MWH) -6274 5303949 10538183
19. Unit Service Factor 0.0 71.3 79.4
20. Unit Availability Factor 0.0 71.3 79.4
21. Unit Capacity Factor (Using MDC Net) 0.0 61.7 71.4
22. Unit Capacity Factor (Using DER Net) 0.0 60.9 70.6
23. Unit Forced Outage Rate 0.0 1.0** 5.1**
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Est. Date of Start-up: December 10, 1986

, 26. Units In Test Status (Prior to Commercial Operation): N/A

  • As of commercial operation on 5-7-85 at 0243.

0* The forced outage rates reflect the addition of 57 forced outage hours which were inadvertently deleted on the April 1986 report.

DC0455

OPERATING DATA REPORT DOCKET N0. 50-323 DATE 12/01/86 COMPLETED BY A.T. Keller TELEPHONE (805)S95-7351 OPERATING STATUS

1. Unit Name: Diablo Canyon Unit 2
2. Reporting Period: November 1986
3. Licensed Thermal Power (MWt): 3411
4. Nameplate Rating (Gross MWe): 1164
5. Design Electrical Rating (Net MWe): 1119
6. Maximum Dependable Capacity (Gross MWe): 1130
7. Maximum Dependable Capacity (Net MWe): 1079
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: None This Month Yr-to-Date* Cumulative *
11. Hours In Reporting Period 720.0 6309.0 6309.0
12. Number Of Hours Reactor Was Critical 720.0 6113.0 6113.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 720.0 5986.4 5986.4
15. Unit Reserve Stutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2360827 18680884 18680884
17. Gross Electrical Energy Generated (MWH) 781500 6118399 6118399
18. Net Electrical Energy Generated (MWH) 742840 5794777** 5794777**
19. Unit Service Factor 100.0 94.9 94.9

.20. Unit Availability Factor 100.0 94.9 94.9

21. Unit Capacity Factor (Using MDC Net) 95.6 85.1 85.1
22. Unit Capacity Factor (Using DER Net) 92.2 82.1 82.1
23. Unit Forced Outage Rate 0.0 5.1 5.1
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Unit 2 Refueling Outage, April 1, 1987, 10 weeks

25. If Shut Down At End Of Report Period, Est. Date of Start-up: N/A
26. Units In Test Status (Prior to Coinmercial Operation): N/A
  • Year-to-date, and cumulative totals started March 13, 1986 at 0300 PST (Date of commercial operation) o* The. net generation indicated reflects a 920 fMH deletion which was inadvertently added in the June 1986 report.

DC0455

~. .- .

AVERAGE DAILY UNIT POWER LEVEL E . DOCKET NO. 50-275-UNIT Diablo Canyon Unit 1 DATE 12/01/86

. COMPLETED BY A.T. Keller TELEPHONE (805)595-7351 MONTH November 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 4 1 -3 17 -5 2 -3 18 -5 3 -3 19 -6 4 4 -3 20 -8 5 -7 21 -12 6- -7 22 -12 7 -3 23 -12

[

8 -4 24 -18 9 -11 25 -13 10 -12 26 -12 11 -12 27 -12 12 -4 28 -12

! 13 -3 29 -12 l 14 -8 30 -12

, 15 -12

- - 16 -12 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DC0455

U AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50-323 UNIT Diablo Canyon Unit 2-DATE 12/01/86 COMPLETED 8Y A.T. Keller TELEPHONE (805)S95-7351 MONTH November 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1083 17 1083 2 1055 18 1083 3 1088 19 988 4 1083 20 836 5 1087 21 1067 6 1083 22 1083 7 1029 23 1046 8 -392 24 1079 9 1071 25 791 10 1087' 26 1079 11 1084 27 1084 12 1087 28 1084 13 1091 29 1088 14 1079 30 1046 15 1075 16 1042 INSTRUCTIONS <

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DC0455

UNIT SHUTDOWNS ~

4 Paga 1 of 1 DOCKET NO. 50-275 e ^

. UNIT NAME Diablo C+.nyon Unit I .

DATE 12/01/86 ,

COMPLETED BY T.A. NELSON REPORT MONTH NOVEMBER 1986 TELEPHONE (805)S95-7351 ' - .

Method of Licensee System Component cause & Corrective Duration 2 3 Event 4 5-Action to 4 No. Date Type (Hours) Reason . Shutdown Report # Code Code Prevent Recurrence-1 8/29/86 S 720.0 C 4 N/A N/A N/A Diablo Canyon Unit I continued its first refueling outage.

i I

t k

1 2 3 4 i F: Forced Reason: Method: Exhibit G - Instructions i S: Scheduled A-Equipment Failure (Explain) ^

1-Manual for Preparation of Data 1

B-Maintenance or Test 2-Manual Scram Entry Sheets. for Licensee

C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG-1022) i E-0perator Training & License Examination previous month t

F-Administrative 5-Fower reduction 5 I G-Operational Error (Explain) 6,7,8-N/A Exhibit I - Same Source j H-Other (Explain) 9-Other i

i DC0455

UNIT SHUTDOWNS

~ Pag? 1 of 1 DOCKET N0.

UNIT NAME 50-323 Diablo Cany:n Unit 2

'. /

DATE 12/01/86 -

COMPLETED BY T.A. NELSON

  • REPORT MONTH NOVEMBER 1986 TELEPHONE (805)595-7351 }

Method of Licensee System Component Cause 8 Corrective Duration 2

Event Action to l 3 4 5 No. Date Type (Hours) Reason Shutdown Report # Code Code Prevent Recurrence None 1

I

1 2 3 4
F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data -

i B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee i C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG-1022)

E-Operator Training & License Examination previous month

. F-Administrative 5-Power reduction 5 i

G-Operational Error (Explain) 6,7,8-N/A Exhibit I - Same Source H-0ther (Explain) _9-Other DC0455

TPACIFIC GAS AND ELECTR.IC C O M PANY DIABLO CANYON POWER PLANT ggggggggl Y PO. Box 56 Avila Beach, Cahfomia 93424 (805) 595-7351 e_- --m _

R.C. THORNBERRY PLANT MANAGER December 9, 1986 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, DC 20555 RE: Docket No. 50-275 and 50-323 License No. DPR-80 and DPR-82 Monthly Operating Report for November,1986 Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Units 1 and 2 for November, 1986. This report is submitted in accordance with Section 6.9.1.7 of the Units 1 and 2 Technical Specifications.

i Sincerely, ROBERT C. THORNBERRY d RCT:Im Enclosures l cc Mr. John B. Martin, Regional Administrator Region V - USNRC l

99 DC0455

.