ML20097A429
| ML20097A429 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/31/1984 |
| From: | Kelly W PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20097A408 | List: |
| References | |
| NUDOCS 8409130268 | |
| Download: ML20097A429 (4) | |
Text
_
.l
~
OPERATING DATA REPORT T
DOCKET NO.-
50-275 DATE-08/03/84 COMPLETED BY W.J. Kelly TELEPHONE (805)595-7351-
- 0PERATING STATUS 1.
Unit Name:
Diablo Canyon Unit 1 2.
Reporting ' Period:
July 1984 Notes: Low Power Physics-
-3.
Licensed Thermal Power (MWt):
166.9 Testing is completed. Awaiting 4.
Nameplate Rating (Gross MWe):
1170 grant of the ful.1 power 5.
Design Electrical Rating (Net MWe):
1084 license from the NRC.
'6.'. Maximum Dependable Capacity-(Gross MWe):
1134 7.
Maximum Dependable Capacity (Net MWe):
1084 8.
If Changes 0ccur-in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
-9.
Power Level To Which Restricted, If Any (Net MWe):
58.50 10._ Reasons. For Restrictions, If Any:
Low power test. permit granted by the Nuclear Regulatory Commission on April 13, 1984, effective April 19, 1984 at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />.
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 744 5658 5658-
- 12. Number Of Hours Reactor Was Critical 7
246 246
- 13. - Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
0 0
- 15. Unit Reserve Shutdown Hours 0
0 0
1
- 16. Gross Thermal Energy Generated (MWH) 300.7 15056.2 15056.2
- 17. Gross Electrical Energy. Generated (MWH) 0 0
0
- 18. Net Electrical Energy Generated (MWH) 0 0
0'
- 19. Unit Service Factor N/A
- 20. Unit Availability Factor N/A
- 21. Unit Capacity Factor (Using MDC Net)
N/A
- 22. Unit Capacity Factor (Using DER Net)
N/A j.
- 23. Unit Forced Outage Rate N/A L
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
i l
25.
If Shut Down At End Of Report Period, Est. Date of Startup:
AUGUST 1984
- 26. Units In Test Status (Prior to Connercial Operation):
Forecast Achieved INITIAL CRITICALITY April 1984 April 1984 i
INITIAL ELECTRICITY August 1984 COMMERCIAL OPERATION October 1984 i'
DC0044 4 l'
84091 268 840803 t
PDR M 05000275
-1 R
PDR-
AVERAGE DAILY. UNIT POWER LEVEL DOCKET NO.
50-275 UNIT Diablo Canyon Unit 1 DATE 08/03/84 COMPLETED BY W.J. Kelly TELEPHONE (805)S95-7351 MONTH.
July 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NE-feT)
(NE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23-0 8
0 24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
l 15 0
31 0
16 0
L INSTRUCTIONS 1
On this format, list the average daily unit power level in.MWe-Net for each day in the-reporting month.
Compute to the nearest whole megawatt.
l DC0044 5
UNIT SHUTDOWNS Af0 POWER REDUCTIONS
~*
DOCKET ND.
50-275-LEIT NAT JIABLO CANYON UNIT 1 DATE J8/J5/84 4
COPPLETED BY W,J, TELLY-TELEPHOE (805)5%-/551-REPORTP0 NTH JULY 1984 Method of Licensee Cause & Corrective Duration Shutting Event System Component-Action to No.
Date Typel (Hours)
Reasonz Down Reactor 3 Report #
Code" Codes Prevent Recurrence NOT APPLICABLE 4
4 1
2 3
4 F:
Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative 5
i G-Operational Error (Explain)
Exhibit I - Same Source H-Other(Explain)
DC0044 6
f:-
NUCLEAR PLANT OPERATIONS-DIABLO CANYON POWER PLANT UCENSEE EVENT REPORTS Reactor licensees are required to report all unusual occurrences to the Nuclear Regulatory Connission (NRC). These reports are called Licensee Event Reports (LERs) and cover a wide range.of occurrences, including equipment failures, personnel errors and plant emergencies.-
The graph below tracks the LERs submitted to the NRC by DC-1 per month, and an accumulative total for the year, along with a breakdown by category.
25-4 1
20-15-10-5-
s
\\
/
-S
/
)FM kM))kS bN D
CUMULATIVE
- - - PER MONTH CATEGORY J
F M
A M
J J
A S
O N
D A
2 5
2 I
I B
2 i
C 0
E X
i 3
3 KEY:
A - PERSONNEL ERROR B - DESIGN, MANUFACTURING, CONSTRUCTION, NSTALLATION C - EXTERNAL D - DEFECTIVE PROCEDURES E - MANAGEMENT / QUALITY ASSURANCE DEFICENCY X - OTHER l.
- - - - - - - ~
~
~~~