h9 RELATED CCRECPC:;3ENCE.
PACIFIC GAS AND E LE C T RI C C O M PANY FGWE l
77 statt staccr. san raascisso.;cA(> onnia 94:o6 j
. <4: s> 78i.42ii. Twx 9:o.372.ess7 smes o. mma November 29, 1984
'a4 DEC -3 !al :32
= = ~ ~
~ ~ ~"*
PG8E Letter No.84-535 0FFILL Or 3ECHf.7A.
00C6EimG !. SErWE Mr. R. J. Pate BRASCH Chief, Reactor Safety Branch U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 Attention: Mr. John Elin Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323 Diablo Canyon Units 1 and 2
Dear Mr. Pate:
This letter is in response to your telephone conversation with Jim Molden on November 26, 1984, regarding observation training for Mr. Dan Barkley.
Mr. Barkley has spent the following time in the Control Room since his arrival at Diablo Canyon Power Plant:
- 1) 8 weeks as a Control Room Advisor,
- 2) 4 weeks as an observer.
Mr. Barkley will spend at least four more weeks in the Control Room prior to being examined by the NRC on January 15, 1985.
Based on the amount of time Mr. Barkley will have spent in the Control Room prior to the examination, and the fact that he previously held an NRC SR0 license at McGuire Power Plant, we request that you waive the remaining four weeks of the required 12-week observation time.
Sincerely, yl.
(
7 (W. [ Rayiaond for cc:
Service List J. D. Shiffer) s 8503290614 841129 PDR ADOCK 05000275 V