UPDATED OPERATING DATASHEETS FOR THE MONTHS OF MAY, JUNE, JULY AND AUGUST 1993 940iaSO~OO S40X>4 PDR 'DOCK 05000275

. R~"

'PDR,

OPERATING DATAREPORT OPERATING STATUS DOCKET NO.

50-275 UNIT 1

DATE 01/01/94 COMPLETED BY E. Bourgo TELEPHONE (805) 545-3035 1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Reasons for restrictions, ifany:

Unit Name:

Reporting Period:

Licensed Thermal Power (MWt):

Nameplate Rating (Gross MWe):

Design Electrical Rating (Net Mwe):

Maximum Dependable Capacity (Gross Mwe):

Maximum Dependable Capacity (Net MWe):

Ifchanges occur in capacity ratings (items 3 through 7) since last report, give reasons:

Power level to which restricted, ifany (Net MWe):

Diablo Canyon Unit 1 May 1993 3338 1137 1086 1124 1073.4 N/A N/A N/A This Month YTD 3623.0 3623.0 0.0 3623.0 0.0 117713194 3966800 3779379 100.00 100.00 97.18 96.06 0.00

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 744.0 744.0 0.0 744.0 0.0 2481414 837900 798921 100.00 100.00 100.04 98.88 0.00 13.

14.

15.

Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

17. Gross Electrical Energy Generated (MWH) 18.

19.

20.

21.

22.

23.

24.

25.

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit AvailabilityFactor Unit Capacity Factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None.

IfShut Down At End Of Report Period, Estimate Date of Startup: Not applicable Cumulative 70725.3 59235.1 0.0 58335.6 0.0 183512696 61757832 58567927 82.48 82.48 77.15 76.25 3.27

~ I I,

I-h