Revised MOR for May 1993 for Dcnpp Unit 1
ML16342A367
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 05/31/1993
From: Bourgo E
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML16342A366 List:
References
NUDOCS 9401250104
Download: ML16342A367 (4)


Text

UPDATED OPERATING DATA SHEETS FOR THE MONTHS OF MAY, JUNE, JULY AND AUGUST 1993 940iaSO~OO S40X>4 PDR 'DOCK

' 05000275

. R~" '. 'PDR,

OPERATING DATA REPORT DOCKET NO. 50-275 UNIT 1 DATE 01/01/94 COMPLETED BY E. Bourgo TELEPHONE (805) 545-3035 OPERATING STATUS

1. Unit Name: Diablo Canyon Unit 1
2. Reporting Period: May 1993
3. Licensed Thermal Power (MWt): 3338
4. Nameplate Rating (Gross MWe): 1137
5. Design Electrical Rating (Net Mwe): 1086
6. Maximum Dependable Capacity (Gross Mwe): 1124
7. Maximum Dependable Capacity (Net MWe): 1073.4
8. Ifchanges occur in capacity ratings (items 3 through 7) since last report, give reasons: N/A
9. Power level to which restricted, if any (Net MWe): N/A
10. Reasons for restrictions, if any: N/A This Month YTD Cumulative
11. Hours In Reporting Period 744.0 3623.0 70725.3
12. Number Of Hours Reactor Was Critical 744.0 3623.0 59235.1
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Line 744.0 3623.0 58335.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 Gross Thermal Energy Generated (MWH) 2481414 117713194 183512696
17. Gross Electrical Energy Generated (MWH) 837900 3966800 61757832
18. Net Electrical Energy Generated (MWH) 798921 3779379 58567927
19. Unit Service Factor 100.00 100.00 82.48
20. Unit Availability Factor 100.00 100.00 82.48
21. Unit Capacity Factor (Using MDC Net) 100.04 97.18 77.15
22. Unit Capacity Factor (Using DER Net) 98.88 96.06 76.25
23. Unit Forced Outage Rate 0.00 0.00 3.27
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None.
25. If Shut Down At End Of Report Period, Estimate Date of Startup: Not applicable